Skip to content
PlanIndex Get alerts
Menu

Planning application

Capel Tabor / Tabor Chapel , Caergybi/ Holyhead

Granted Isle of Anglesey FPL/2025/261 Full Planning Permission

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais llawn ar gyfer trosi y capel i mewn i llety gwyliau yn / Full application for conversion of the chapel into a holiday let at

As published by the council, reference FPL/2025/261

Application record

Reference
FPL/2025/261
Type
Full Planning Permission
Status
Closed
Decision
Caniatáu gyda Amodau / Permitted with Conditions
Received
5 Nov 2025
Validated
17 Nov 2025
Decided
17 Jul 2026
Ward
Parc a'r Mynydd
Parish
Holyhead
Decision by
Dirprwyedig / Delegated

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by Isle of Anglesey

  2. 17 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jul 2026

    Decision issued: Caniatáu gyda Amodau / Permitted with Conditions

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Capel Tabor / Tabor Chapel , Caergybi / Holyhead

    SCR/2025/48 Submitted 10 Nov 2025 0m away

    Barn sgrinio ar gyfer trosi y capel i mewn i llety gwyliau yn / Screening opinion for the conversion of the chapel into a holiday let at

    Decided Outline 13 docs
  • Ffordd Ynys Lawd, Caergybi / South Stack Road, Holyhead

    SCR/2021/89 Submitted 6 Dec 2021 311m away

    Barn sgrinio ar gyfer codi adeilad storio a stabl yn ogystal a creu mynediad newydd ar dir yn / Screening opinion for the erection of a storage and stable building together with the creation of a new access on land at

    Decided Outline 7 docs
  • Ffordd Ynys Lawd, Caergybi / South Stack Road, Holyhead

    FPL/2021/345 Submitted 6 Dec 2021 311m away

    Cais llawn ar gyfer codi adeilad storio a stabl yn ogystal a creu mynediad newydd ar dir yn / Full application for the erection of a storage and stable building together with the creation of a new access on land at

    Granted Full applications 7 docs
  • 17 Hirfron, Caergybi / 17 Hirfron, Holyhead

    HHP/2022/339 Submitted 14 Dec 2022 345m away

    Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 11 docs
  • 26 Maes Y Mynydd, Caergybi/Holyhead

    HHP/2022/107 Submitted 24 Mar 2022 439m away

    Cais llawn ar gyfer creu fynedfa i gerbydau newydd yn yn / Full application for creating new vehicular access at

    Granted Full applications 6 docs
  • 17 Ffordd Hen Ysgol/Old School Road, Caergybi/Holyhead

    HHP/2022/115 Submitted 7 Apr 2022 459m away

    Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 5 docs

In Isle of Anglesey

  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications
  • FPL/2026/38 Granted

    Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.

    Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at

    18 Feb 2026 Full applications
  • FPL/2025/285 Granted

    Cefn Coch, Llanfechell

    Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at

    25 Nov 2025 Full applications