Archive · Isle of Anglesey · 2025
Planning applications in Isle of Anglesey, November 2025
Isle of Anglesey recorded 102 planning applications in November 2025, listed newest first over 3 pages. Dates are as received, or as decided where the council publishes no submission date.
Applications, November 2025
Newest first · page 1 of 3
-
FPL/2025/295 Decided
58 Stryd y Glorian / Machine Street, Amlwch.
Cais llawn ar gyfer codi garej newydd yn / Full application for the erection of a new garage at
-
FPL/2025/298 Granted
10-12 High Street, Cemaes.
Cais llawn ar gyfer addasu ac ehangu ar gyfer y siop a'r flat uwchben ynghyd a gosod grisia allannol yn / Full application for alterations and extensions to the existing shop and flat above together with the erection of an external staircase at
-
FPL/2025/299 Granted
41 Ffordd Llundain, Caergybi / 41 London Road, Holyhead
Cais llawn ar gyfer newid defnydd y siop i fod yn rhan o'r uned preswyl presennol yn ogystal â dymchwel, addasu ac ehangu yn / Full application for the change of use of the shop into part of the existing residential unit together with demolition, alterations and extensions at
-
DIS/2025/80 Granted
Wenallt, 19 Maes y Plas, Llanfechell.
Cais i ryddhau amod (06) (Cynllun Rheoli Traffig Adeiladu) o ganiatâd cynllunio HHP/2025/60 (Cais llawn ar gyfer dymchwel, addasu ac ehangu) yn / Application to discharge condition (06) (Construction Traffic Management Plan) of planning permission HHP/2025/60 (Full application for demolition, alterations and extensions) at
-
HHP/2025/194 Granted
1 & 2 Bryn Colyn, Warren Road, Rhosneigr
Cais llawn ar gyfer codi dau falconi yn / Full application for the erection of two balconies at
-
FPL/2025/296 Granted
Plot C7, Parc Cybi, Caergybi / Holyhead.
Cais llawn ar gyfer datblygu Cyfleuster Hwb Hydrogen gan gynnwys cyfleuster cynhyrchu hydrogen gwyrdd, storio hydrogen, cyfleuster tanwydd cerbydau hydrogen, a strwythurau ategol yn / Full application for the development of a Hydrogen Hub Facility including green hydrogen production facility, hydrogen storage, hydrogen vehicle fuelling facility, and ancillary structures at
-
HHP/2025/195 Decided
Ynys Y Big, Ffordd Biwmares Road, Glyn Garth, Porthaethwy / Menai Bridge
Dymchwel, addasu ac ehangu'r tŷ cychod presennol ar gyfer defnydd fel man adloniant a tŷ cychod atodol ynghyd a gwaith cysylltiedig yn / Demolition, alterations and extensions to existing boathouse for use as ancillary recreation space and boathouse together with associated works at
-
LUP/2025/11 Granted
Tan Y Coed, Biwmares/Beaumaris
Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer y datblygiad arfaethedig o 21 o gabanau coed i ddefnydd gwyliau, darparu lonydd atynt, tirlunio, ynghyd a gosod offer preifat i drin carthion a llecynau pasio ar y rhydwaith priffyrdd yn fel y cymeradwywyd o dan ganiatâd cynllunio rhif 22C197E/VAR yn / Application for a Lawful Development Certificate for the proposed development of 21 log cabins for holiday use, provision of access tracks, landscaping, together with the installation of a private treatment plant and passing places on the highway network as approved under planning permission reference 22C197E/VAR at Tan y Coed, Beaumaris
-
VAR/2025/59 Granted
Crud yr Awel, Llanfaethlu
Cais o dan Adran 73 i ddiwygio amodau (02) (cynlluniau a gymeradwywyd), (04) (goleuadau allanol) a (05) (cynllun tirlunio) o ganiatâd cynllunio rhif HHP/2023/208 (addasu, ehangu a trosi yr adeilad allanol i lety ategol) er mwyn mwyn diwygio dyluniad yr adeilad allanol a cyflwyno manylion goleuo a tirlunio ar ôl cychwyn gwaith yn / Application under Section 73 for the variation of conditions (02) (approved plans), (04) (external lighting) and (05) (landscaping scheme) of planning permission reference HHP/2023/208 (alterations, extensions and conversion of outbuilding into ancillary accommodation) so as to amend the design of the outbuilding and submit lighting and landscaping details following commencement of works at
-
MAH/2025/21 Granted
Crud yr Awel, Llanfaethlu
Mân newidiadau ôl-weithredol i gynllun sydd wedi ei ganiatáu yn flaenorol o dan ganiatád cynllunio HHP/2023/208 (addasu, ehangu a trosi yr adeilad allanol i lety ategol) er mwyn codi uchder crib to yr annedd yn / Retrospective minor amendments to scheme previously approved under planning permission HHP/2023/208 (alterations, extensions and conversion of outbuilding into ancillary accommodation) so as to increase the ridge height of the dwelling at
-
FPL/2025/297 Decided
Bryn Gwyn, Brynrefail, Dulas
Cais llawn ar gyfer dymchwel yr annedd a garej bresennol, codi annedd a garej newydd yn ei le a gwaith cysylltiedig yn / Full application for the demolition of the existing dwelling and garage, the erection of a replacement dwelling and garage and associated works at
-
SCR/2025/61 Decided
Plot C7, Parc Cybi, Caergybi / Holyhead.
Barn sgrinio ar gyfer datblygu Cyfleuster Hwb Hydrogen gan gynnwys cyfleuster cynhyrchu hydrogen gwyrdd, storio hydrogen, cyfleuster tanwydd cerbydau hydrogen, a strwythurau ategol yn / Screening opinion for the development of a Hydrogen Hub Facility including green hydrogen production facility, hydrogen storage, hydrogen vehicle fuelling facility, and ancillary structures at
-
SCR/2025/60 Decided
Bryn Gwyn, Brynrefail, Dulas
Barn sgrinio ar gyfer dymchwel yr annedd a garej bresennol, codi annedd a garej newydd yn ei le yn ogystal â chreu mynedfa newydd a gwaith cysylltiedig yn / Screening opinion for the demolition of the existing dwelling and garage, the erection of a replacement dwelling and garage together with the creation of a new access and associated works at
-
HHP/2025/193 Granted
2 Cornelyn Manor, Llangoed.
Cais llawn ar gyfer codi garej yn / Full application for the erection of a garage at
-
S106/2025/10 Granted
6, Llys Bryn Brochan, Talwrn
Cais i dynnu Cytundeb 106 yn ymwneud â'r cymal tai fforddiadwy yn / Application to delete the Section 106 agreement in relation to the affordable dwelling clause at
-
HHP/2025/196 Granted
Ffrwd Onnen, Llangristiolus, Bodorgan.
Cais llawn am estyniad i'r cwrtil ynghyd â chodi garej yn / Full application for an extension to the curtilage together with the erection of a garage at
-
FPL/2025/293 Decided
Ddraig y Delwyn, Gwalchmai.
Cais llawn ar gyfer codi annedd fforddiadwy ynghyd â creu mynedfa i gerbydau ar dir ger / Full application for the erection of an affordable dwelling together with creating a new vehicular access on land adjacent to
-
SCR/2025/47 Decided
Ty Cerrig, Station Road, Rhosneigr
Barn sgrinio ar gyfer newid defnydd adeilad allanol i uned gwyliau hunan-gynhwysol yn cynnwys addasu ac ehangu yn / Screening opinion for conversion of outbuilding into a self-contained holiday let unit including alterations and extensions at
-
SCR/2025/59 Decided
Marianfa, Marianglas
Barn sgrinio ar gyfer defnyddio carafán sefydlog bresennol ar gyfer llety preswyl atodol dros dro yn / Screening opinion for the use of existing static caravan for temporary ancillary residential accommodation at
-
SCR/2025/58 Decided
Refail Farm Estate, Pontrhydybont / Four Mile Bridge
Barn sgrinio ar gyfer codi annedd, creu mynedfa newydd i gerbydau ynghyd â gwaith cysylltiedig ar dir i'r gorllewin o / Screening opinion for the erection of a dwelling, construction of a new vehicular access together with associated development on land to the east of
-
FPL/2025/291/EIA Decided
Llanfihangel yn Nhowyn.
Cais llawn ar gyfer gosod ceblau tanddaearol sy'n gysylltiedig â Pharc Solar Traffwll ar dir yn / Full application for the laying of underground cables associated with Parc Solar Traffwll on land at
-
HHP/2025/192 Granted
Tyddyn Dilyfws, Tyn Y Gongl.
Cais llawn ar gyfer codi sied yn / Full application for the erection of a shed at
-
HHP/2025/190 Granted
Glan Y Gors, Rhoscolyn
Cais llawn ar gyfer dymchwel yr ystafell ardd bresennol, ynghyd â chodi ystafell ardd yn ei le yn / Full application for the demolition of the existing garden room, together with the erection of a replacement garden room in lieu at
-
DIS/2025/79 Granted
Tir ger Lon Y Bryn, Bae Trearddur / Land adjacent Lon Y Bryn, Trearddur Bay
Cais i ryddhau amodau (04) (Cynllun Rheoli Traffig Adeiladu) o ganiatâd cynllunio FPL/2021/158 (codi annedd ynghyd a creu mynedfa i gerbydau) yn / Application to discharge conditions (04) (Construction Traffic Management Plan) of planning permission FPL/2021/158 (erection of a dwelling together with the construction of a vehicular access) at
-
HHP/2025/188 Granted
Aelybryn, Overstrand Avenue, Rhosneigr
Cais llawn ar gyfer addasu ac ehangu ynghyd a codi modurdy newydd yn / Full application for alterations and extensions to the existing dwelling together with the erection of a replacement garage at
-
SCR/2025/57 Decided
Penrhos Works, Caergybi/Holyhead
Barn Sgrinio i ddiwygio amod (02) (cynlluniau a gymeradwywyd) o ganiatâd cynllunio rhif FPL/2023/189 (Adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol) er mwyn diwygio'r dyluniad yn / Screening opinion to vary condition (02) (approved plans) of planning permission reference FPL/2023/189 (Construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables) so as to amend the design at
-
ADV/2025/14 Granted
Capel Gorffwys Penuel, Ffordd Glandwr, Llangefni.
Cais i leoli arwydd wedi ei oleuo newydd yn / Application for the siting of a replacement illuminated sign at
-
HHP/2025/191 Granted
Bron y Graig, Porth y Felin Road, Caergybi / Holyhead.
Cais llawn ar gyfer codi wal yn / Full application for the erection of a wall at
-
ADV/2025/15 Granted
Oriel Ynys Môn, Llangefni.
Cais i leoli arwydd heb ei oleuo yn / Application for the siting of a non-illuminated sign at
-
FPL/2025/292 Granted
Seren Las, Lon Dalar, Bodedern
Cais llawn ar gyfer cadw cynhwysydd storio ar dir gerllaw i / Full application for the retention of a storage container on land adjacent to
-
FPL/2025/291 Status unknown
Llanfihangel yn Nhowyn.
Cais llawn ar gyfer gosod ceblau tanddaearol sy'n gysylltiedig â Pharc Solar Traffwll ar dir yn / Full application for the laying of underground cables associated with Parc Solar Traffwll on land at
-
HHP/2025/189 Granted
Petrinka, 56 Trearddur Road, Bae Trearddur / Trearddur Bay
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
-
FPL/2025/294 Granted
Gors Felen, Ffordd Bron Y Felin Road, Llangefni.
Cais llawn ar gyfer estyniad ochr unllawr newydd, dymchwel garej ar wahân presennol, ynghyd ag ehangu'r maes parcio yn / Full application for a new single storey side extension, demolition of existing detached garage, together with enlargement of car park at
-
DIS/2025/77 Granted
Tir i'r Gogledd-Ddwyrain o Gwel y Llan, Llandegfan / Land to the North-East of Gwel y Llan, Llandegfan
Cais i ryddhau amodau (03) (manylion cynllun i ddargyfeirio'r garthffos gyhoeddus ), (06) (Cynllun rheoli tirwedd), (08) (goleuadau allanol) , (09) (mesurau i sicrhau bod y ffordd fynediad a'r ystad) a (17) (CTMP) o ganiatâd cynllunio FPL/2024/105 (Cais llawn i godi 30 o anheddau preswyl (100% o unedau tai fforddiadwy), newidiadau i'r fynedfa bresennol, creu mynedfa newydd a ffordd fynediad fewnol ynghyd â gwaith cysylltiedig) yn / Application to discharge conditions (03) (details of a scheme to divert the public sewer), (06) (landscape management plan), (08) (external lighting ), (09) (maintenance of the access and estate road) and (17) (CTMP) of planning permission FPL/2024/105 (Full application for the erection of 30 residential dwellings (100% affordable housing units), alterations to existing access, creation of new access and internal access road together with associated works) at
-
FPL/2025/288 Granted
Coed Bach, Llanfaes
Cais llawn ar gyfer trosi'r adeilad allanol presennol yn anecs yn /Full application for the conversion of the existing outbuilding into an annexe at
-
DIS/2025/78 Granted
Tir i'r Gogledd o / Land North of, Y Garnedd, Llanfairpwll.
Cais i ryddhau amodau (05) (Cynllun Rheoli Traffig Adeiladu), (09) (Cynllun goleuadau stryd), (15) (Manylion goleuo allanol) o ganiatád cynllunio FPL/2024/76 (codi 27 annedd fforddiadwy, adeiladu ffordd fynediad fewnol, gwyro hawl tramwy cyhoeddus, creu bwnd tirlunio, codi ffens acwstig a gwaith cysylltiedig) ar / Application to discharge conditions (05) (Construction Traffic Management Plan), (09) (Street lighting scheme), (15) (External lighting details) of planning permission FPL/2024/76 (erection of 27 affordable dwellings, construction of internal access road, diversion of public right of way, creation of a landscaping bund, erection of acoustic fence and associated works) on
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at
-
FPL/2025/286 Granted
Aluminium Powder Co, London Road, Caergybi / Holyhead.
Cais llawn ar gyfer estyniad i'r bloc cawod / newid presennol yn / Full application for an extension to the existing shower / changing block at
-
LBC/2025/36 Granted
Llys Bryn Brochan, Talwrn
Cais Adeilad Rhestredig ar gyfer newidiadau i caniatâd 23C325A/LB ar gyfer newid defnydd yr adeilad allanol i annedd, addasu ac ehangu ynghyd a chodi modurdy a storfa goed yn / Listed Building Consent for amendments to previously approved consent 23C325A/LB for the conversion of the outbuilding into a dwelling, alterations and extensions together with the erection of a garage and log store at
-
FPL/2025/287 Refused
Refail Farm Estate, Pontrhydybont / Four Mile Bridge
Cais llawn ar gyfer codi annedd, creu mynedfa newydd i gerbydau ynghyd â gwaith cysylltiedig ar dir i'r gorllewin o / Full application for the erection of a dwelling, construction of a new vehicular access together with associated development on land to the west of
-
SCR/2025/53 Decided
Twr Reservoir, South Stack Road, Caergybi / Holyhead
Barn sgrinio ôl-weithredol ar gyfer lleoli carafán statig am gyfnod o dair blynedd ar dir yn / Retrospective screening opinion for the siting of a static caravan for a period of three years on land at
-
SCR/2025/56 Decided
Aluminium Powder Co, London Road, Caergybi / Holyhead.
Barn sgrinio ar gyfer estyniad i'r bloc cawod / newid presennol yn / Screening opinion for an extension to the existing shower / changing block at
-
FPL/2025/282 Granted
Hyfrydle, Moelfre
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
-
SCR/2025/54 Decided
Hyfrydle, Moelfre
Barn sgrinio ar gyfer addasu ac ehangu i'r annedd, ynghyd â chodi anecs hunangynhwysol ar gyfer defnydd achlysurol a newid defnydd lle manwerthu yn lety gwyliau hunangynhwysol yn / Screening opinion for alterations and extensions to the dwelling, together with an erection of a self-contained annex for incidental use and the change of use of retail space into a self-contained holiday let at
-
FPL/2025/281 Granted
Canolfan Arddio Holland Arms, Ffordd Caergybi, Pentre Berw / Holland Arms Garden Centre, Holyhead Road, Pentre Berw
Cais llawn ar gyfer creu mynedfa newydd yn ogystal â addasu'r fynedfa a maes parcio presennol yn / Full application for the formation of a new entrance together with alterations to the existing access and car park at
-
VAR/2025/57 Granted
Penrhos Works, Caergybi/Holyhead
Cais o dan Adran 73 i ddiwygio amod (02) (cynlluniau a gymeradwywyd) o ganiatâd cynllunio rhif FPL/2023/189 (Adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol) er mwyn diwygio'r dyluniad yn / Application under Section 73 to vary condition (02) (approved plans) of planning permission reference FPL/2023/189 (Construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables) so as to amend the design at
-
VAR/2025/58 Decided
Pentre Felin/Stad Waenfawr Estate, Caergybi/Holyhead
Cais o dan Adran 73 i dileu amod (14) (Adeiladu Ynys Traffig) o caniatâd cynllunio rhif 19C313B/VAR (disgrifiad byr yr hen gais) er mwyn (Ddiwygio amodau (02) a (03) o ganiatâd cynllunio rhif 19C313A (cais amlinellol ar gyfer codi 22 o anneddau) er mwyn ymestyn amser caniatâd cynllunio ynghyd a dileu amodau (11), (12) a (13) (Cod Cartrefi Cynaliadwy)) er mwyn tynnu yr ynys traffig o'r bwriad yn / Application under Section 73 for the deletion of condition (14) (Construction of Traffic Island) of planning permission reference 19C313B/VAR (Variation of conditions (02) and (03) of planning permission reference 19C313A (outline application for the erection of 22 dwellings) to extend the planning permission together with the deletion of conditions (11), (12) and (13) (Code for Sustainable Homes)) so as to remove traffic island from the scheme at
-
FPL/2025/284 Refused
Twr Reservoir, South Stack Road, Caergybi / Holyhead
Cais ôl-weithredol ar gyfer lleoli carafán statig am gyfnod o dair blynedd ar dir ger / Retrospective application for the siting of a static caravan for a period of three years on land near
-
TPO/2025/23 Granted
Killeen, Beach Road, Benllech.
Cais i wneud gwaith ar goed sydd wedi ei warchod gan Orchymyn Diogelu Coed yn / Application for works to a tree protected by a Tree Preservation Order at
-
FPL/2025/283 Granted
Porthladd Caergybi / Holyhead Port.
Cais llawn ar gyfer codi adeilad manwerthu di-doll newydd a bloc toiledau cwsmeriaid yn / Full application for the erection of a new duty-free retail building and customer toilet block at
Other months in 2025
- January 2025 75
- February 2025 85
- March 2025 81
- April 2025 76
- May 2025 67
- June 2025 74
- July 2025 69
- August 2025 53
- September 2025 74
- October 2025 80
- November 2025 102
- December 2025 45