Planning application
Tai Lewis Rogers, Ffordd Penmynydd, Penmynydd
Works: Extension
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Cais llawn ar gyfer trosi'r 5 eiddo preswyl presennol yn 3, yn ogystal ag addasu ac ehangu, creu mynedfa newydd, gosod pecyn trin carthion a phaneli solar ar y ddaear yn / Full application for the conversion of the 5 existing residential properties into 3, together with alterations and extensions, creation of a new access, installation of a treatment plant and ground mounted solar panels at
As published by the council, reference FPL/2025/311
Application record
- Reference
- FPL/2025/311
- Type
- Full Planning Permission
- Status
- Valid
- Decision
- Heb Benderfyniad / Not yet determined
- Received
- 12 Dec 2025
- Validated
- 21 Jul 2026
- Ward
- Aethwy
- Parish
- Penmynydd
- Decision by
- Dirprwyedig / Delegated
Timeline
Dates from the published record
-
12 Dec 2025
Received by Isle of Anglesey
-
21 Jul 2026
Validated
Checked as complete and ready for consideration.
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Tai Lewis Rogers, Ffordd Penmynydd Road, Penmynydd.
Caniatâd Adeilad Rhestredig ar gyfer trosi'r 5 eiddo preswyl presennol yn 3, yn ogystal âg addasu ac ehangu, creu mynedfa newydd, gosod system gwaith trin a phaneli solar wedi'u gosod ar y ddaear yn / Listed Building Consent for the conversion of the 5 existing residential properties into 3, together with alterations and extensions, creation of a new access, installation of a treatment plant and ground mounted solar panels at
Decided Heritage and listed buildings Extension 13 docs -
Bryn Hyfryd, Penmynydd
Cais llawn ar gyfer codi uchder y sied bresennol yn ogystal a chodi gorchydd iard newydd yn / Full application for raising the height of the existing shed together with the erection of a new yard covering at
Granted Full applications 5 docsSmall domestic -
Tyn Llan, Ffordd Penmynydd / Penmynydd Road, Penmynydd
Cais llawn ar gyfer creu lagwn slyri ar dir yn / Full application for the creation of a slurry lagoon on land at
Granted Full applications 11 docs -
Tan Rhiw, Penmynydd.
Cais llawn ar gyfer trosi garej bresennol i ffurfio llety ategol yn / Full application for the conversion of existing garage to form ancillary accommodation at
Granted Full applications 3 docs
Other full applications applications
In Isle of Anglesey
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at
-
FPL/2026/40 Granted
Cumbria, High Street, Rhosneigr.
Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at
-
FPL/2026/38 Granted
Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.
Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at