Planning application
Gof Du, Penrhosfeilw, Caergybi / Holyhead
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais llawn ar gyfer dymchwel yr annedd bresennol ynghyd â chodi annedd newydd yn / Full application for the demolition of the existing dwelling together with the erection of a replacement dwelling at
As published by the council, reference FPL/2025/202
Application record
- Reference
- FPL/2025/202
- Type
- Full
- Status
- Permitted
- Decision
- Caniatáu / Permit
- Received
- 21 Aug 2025
- Validated
- 26 Aug 2025
- Decided
- 18 Mar 2026
- Ward
- Ynys Gybi
- Parish
- Trearddur
- Decision by
- Delegated
Site history
Applications at this address on the Isle of Anglesey register
This site has had 4 applications since 2022: 1 approved, 0 refused.
-
DIS/2026/27 Decided
Gof Du, Penrhosfeilw, Caergybi / Holyhead
Cais i ryddhau amod (05) (Seilwaith Band Eang) o ganiatâd cynllunio FPL/2025/202 (dymchwel yr annedd bresennol â chodi annedd newydd) yn / Application to discharge condition (05) (Broadband Infrastructure) of planning permission FPL/2025/202 (demolition of existing dwelling and erection of a replacement dwelling) at
-
SCR/2025/34 Decided
Gof Du, Penrhosfeilw, Caergybi / Holyhead
Barn sgrinio ar gyfer dymchwel yr annedd bresennol ynghyd â chodi annedd newydd yn / Screening opinion for the demolition of the existing dwelling together with the erection of a replacement dwelling at
-
SCR/2022/64 Decided
Gof Du, Penrhosfeilw, Caergybi / Holyhead.
Barn sgrinio ar gyfer dymchwel tŷ presennol a chodi annedd yn ei le, adnewyddu yr adeiladau allanol presennol, ynghyd â gwaith cysylltiedig yn / Screening opinion for demolition of existing dwelling and the erection of a replacement dwelling, refurbishment of existing outbuildings, together with associated works at
Timeline
Dates from the published record
-
21 Aug 2025
Received by Isle of Anglesey
-
26 Aug 2025
Validated
Checked as complete and ready for consideration.
-
18 Mar 2026
Decision issued: Caniatáu / Permit
-
6 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
DIS/2026/27 Decided
Gof Du, Penrhosfeilw, Caergybi / Holyhead
Cais i ryddhau amod (05) (Seilwaith Band Eang) o ganiatâd cynllunio FPL/2025/202 (dymchwel yr annedd bresennol â chodi annedd newydd) yn / Application to discharge condition (05) (Broadband Infrastructure) of planning permission FPL/2025/202 (demolition of existing dwelling and erection of a replacement dwelling) at
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 18 March 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Gof Du, Penrhosfeilw, Caergybi / Holyhead
Cais i ryddhau amod (05) (Seilwaith Band Eang) o ganiatâd cynllunio FPL/2025/202 (dymchwel yr annedd bresennol â chodi annedd newydd) yn / Application to discharge condition (05) (Broadband Infrastructure) of planning permission FPL/2025/202 (demolition of existing dwelling and erection of a replacement dwelling) at
Decided Conditions Demolition 4 docsDomestic -
Gof Du, Penrhosfeilw, Caergybi / Holyhead.
Barn sgrinio ar gyfer dymchwel tŷ presennol a chodi annedd yn ei le, adnewyddu yr adeiladau allanol presennol, ynghyd â gwaith cysylltiedig yn / Screening opinion for demolition of existing dwelling and the erection of a replacement dwelling, refurbishment of existing outbuildings, together with associated works at
Decided Outline Demolition 23 docsDomestic -
Gof Du, Caergybi /Holyhead
Cais llawn i ddymchwel y tŷ presennol a chodi annedd newydd yn ei le, ynghyd â gwaith cysylltiedig yn / Full application for the demolition of the existing dwelling and the erection of a replacement dwelling, together with associated works at
Refused Full applications Demolition 38 docsDomestic -
Gof Du, Penrhosfeilw, Caergybi / Holyhead
Barn sgrinio ar gyfer dymchwel yr annedd bresennol ynghyd â chodi annedd newydd yn / Screening opinion for the demolition of the existing dwelling together with the erection of a replacement dwelling at
Decided Outline Demolition 11 docsDomestic -
Fferm Tan Y Graig Farm, Lon Isallt, Bae Treaddur / Treaddur Bay
Cais llawn ar gyfer codi sied amaethyddol ynghyd â gosod tanc elifion silwair newydd ar dir yn / Full application for the erection of an agricultural shed together with the installation of a new silage effluent tank on land at
Granted Full applications 12 docsSmall domestic -
Fferm Tan Y Graig Farm, Lon Isallt, Bae Treaddur / Treaddur Bay
Barn sgrinio ar gyfer codi sied amaethyddol ynghyd â gosod tanc elifion silwair newydd ar dir yn / Screening opinion for the erection of an agricultural shed together with the installation of a new silage effluent tank on land at
Decided Outline 12 docsSmall domestic
Other full applications
In Isle of Anglesey
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at
-
FPL/2026/40 Granted
Cumbria, High Street, Rhosneigr.
Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at
-
FPL/2026/38 Granted
Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.
Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at