Planning application

Land 2430M SW Of Loch Buidhe Bonar Bridge

Awaiting decision Highland 24/05062/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Carnaig Substation - Construction and operation of a 400kV substation and associated infrastructure, site access, and landscaping

As published by the council, reference 24/05062/FUL

Application record

Reference
24/05062/FUL
Type
Full Application
Status
Under Consideration
Received
4 Dec 2024
Validated
13 Jan 2025
Ward
North, West And Central Sutherland
Parish
Creich Community Council
Decision by
Delegated Decision

Site history

Applications at this address on the Highland register

This site has had 5 applications since 2024: 1 approved, 0 refused.

  • 26/00739/SCOP Decided

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    EIA Scoping Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe Substation

    Decided 1 Apr 2026 Outline
  • 25/03629/SCRE Decided

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    EIA Screening Opinion Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe Substation

    Decided 20 Nov 2025 Outline
  • 25/03420/FUL Granted

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    Formation of access and 2.6km private way.

    Decided 11 Dec 2025 Full applications
  • 25/03311/S37 Decided

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    Spittal to Beauly 400 kV OHL - Install, operate and keep installed 173km of new 400 kV overhead electricity line, supported on steel lattice tower structures, between proposed new substations at Banniskirk (ND 15905 56823) in the area of Spittal, and Fanellan (NH 48534 43208) in the area of Beauly, with a connection via a proposed new substation at Carnaig (NH 65053 97458) near to the existing substation at Loch Buidhe, in the area of Bonar Bridge; associated permanent diversion works to 18km of existing 132 kV and 275 kV overhead electricity lines, including the temporary diversion works, and ancillary development and associated works. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006008

    Decided 30 Oct 2025

Timeline

Dates from the published record

  1. 4 Dec 2024

    Received by Highland

  2. 13 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 8 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 10 March 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Highland took a median of 67 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

185 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Highland for determination, against a statutory target of eight weeks. Over the last year Highland decided full applications in a median of 71 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Highland

  • 26/00375/FUL Granted

    Land 160M NE Of Blairstarn 424 Clashmore Lochinver

    Erection of house and garage

    29 Jan 2026 Full applications
  • 26/00373/FUL Granted

    Land 360M NW Of Parkhouse Clashmore Lochinver

    Erection of house for short term letting and outbuilding

    29 Jan 2026 Full applications
  • 26/03064/FUL Granted

    Land 200M East Of 23 Willow Avenue Slackbuie Inverness

    Erection of sprinkler pump and tank enclosure

    16 Jul 2026 Full applications
  • 25/03170/FUL Granted

    Land 25M NE Of Fishers Brook Morar

    Erection of house

    26 Aug 2025 Full applications
  • 26/03160/FUL Granted

    Tigh-Na-Coille Nethy Bridge PH25 3DR

    Erection of extension

    24 Jul 2026 Full applications