Planning application

Land 2430M SW Of Loch Buidhe Bonar Bridge

Decided Highland 25/03629/SCRE Screening Applications

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

EIA Screening Opinion Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe Substation

As published by the council, reference 25/03629/SCRE

Application record

Reference
25/03629/SCRE
Type
Screening Applications
Status
Awaiting decision
Decision
Screening Application EIA Required
Received
23 Sep 2025
Validated
23 Sep 2025
Decided
20 Nov 2025
Ward
North, West And Central Sutherland
Parish
Creich Community Council
Decision by
Delegated Decision

Site history

Applications at this address on the Highland register

This site has had 5 applications since 2024: 1 approved, 0 refused.

  • 26/00739/SCOP Decided

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    EIA Scoping Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe Substation

    Decided 1 Apr 2026 Outline
  • 25/03420/FUL Granted

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    Formation of access and 2.6km private way.

    Decided 11 Dec 2025 Full applications
  • 25/03311/S37 Decided

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    Spittal to Beauly 400 kV OHL - Install, operate and keep installed 173km of new 400 kV overhead electricity line, supported on steel lattice tower structures, between proposed new substations at Banniskirk (ND 15905 56823) in the area of Spittal, and Fanellan (NH 48534 43208) in the area of Beauly, with a connection via a proposed new substation at Carnaig (NH 65053 97458) near to the existing substation at Loch Buidhe, in the area of Bonar Bridge; associated permanent diversion works to 18km of existing 132 kV and 275 kV overhead electricity lines, including the temporary diversion works, and ancillary development and associated works. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006008

    Decided 30 Oct 2025
  • 24/05062/FUL Awaiting decision

    Land 2430M SW Of Loch Buidhe Bonar Bridge

    Carnaig Substation - Construction and operation of a 400kV substation and associated infrastructure, site access, and landscaping

    Submitted 4 Dec 2024 Full applications

Timeline

Dates from the published record

  1. 23 Sep 2025

    Received by Highland

  2. 20 Nov 2025

    Decision issued: Screening Application EIA Required

  3. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

Highland has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Highland

  • 26/03871/SCRE Awaiting decision

    Scottish Water Thurso Waste Water Treatment Works Thurso

    Repowering of the existing turbine

    2 Sep 2026 Outline
  • 26/03797/SCRE Awaiting decision

    Land 560M SW Of Torvean Golf Club Inverness

    Environmental Impact Assessment (EIA) Screening Opinion Request for a proposed Solar PV Array and associated Battery Energy Storage System (BESS)

    28 Aug 2026 Outline
  • 26/03611/PIP Awaiting decision

    Land 105M SW Of 7 Scullamus Moss Breakish

    Erection of house (renewal of 23/02951/PIP)

    21 Aug 2026 Outline
  • 26/02017/PIP Granted

    Land 60M SW Of Sitka Coulhill Road Alness

    Erection of house

    13 May 2026 Outline
  • 26/02595/SCRE Decided

    Land 90M East Of Clune Farm Clune Farm Aldourie Inverness

    EIA Screening Opinion - Upgraded and new access track for access from B862

    15 Jun 2026 Outline