Planning application
7 Fountanye Road, London, N15 4QL
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a first floor rear extension to provide 10 studio units for office/workspace use and 2no. communal WC facilities each with 4no. toilets (retrospective).
As published by the council, reference HGY/2026/2228
Application record
- Reference
- HGY/2026/2228
- Type
- Full planning permission
- Status
- Under Consultation
- Received
- 7 Aug 2026
- Validated
- 7 Aug 2026
- Ward
- South Tottenham
- Decision by
- Delegated Decision
- Postcode
- N15 4QL
Timeline
Dates from the published record
-
7 Aug 2026
Received by Haringey
-
31 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Haringey took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Haringey for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11 High Cross Centre, Fountayne Road, Haringey, London, N15 4QL
83% historically approved · decision due ~1 Jun
Intensification of employment use through the addition of a first-floor height extension and a new second-floor level to enable the creation of a multi-unit business hub with communal amenity space.
Awaiting decision Full applications Extension 33 docs -
Unit 8, Gaunson House, Markfield Road, London, N15 4QQ
Change of use class from B1/B8 (Business & Storage/Distribution) to A1(Retail).
Refused Full applications 8 docs -
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
93% historically approved · decision due ~15 Oct
Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.
Awaiting decision Amendments 9 docs -
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections.
Granted Full applications 11 docs -
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE
Advertisement Consent for the display of six non-illuminated signs and four illuminated signs
Granted Advertising 15 docs -
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE
Non-Material Amendment to planning permission HGY/2025/2252 comprising repair of existing windows, replacement of cladding, existing windows extended to full height, fill in and rendered entrance door, replace existing roller shutter. The proposed minor amendments relate to changes required to ensure their operational requirements can be met and that the proposed works are aligned with the approved drawings in Condition to facilitate occupation of the Site by the Applicant
Granted Amendments Windows or glazing 8 docs
Other full applications applications
In Haringey
-
HGY/2026/1488 Granted
203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
-
HGY/2026/2208 Awaiting decision
21 The Grove Lynton Road, Hornsey, London, N8 8ST
Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.
-
HGY/2026/2340 Awaiting decision
Rowan, Muswell Road, Hornsey, London, N10 2BX
The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.
-
HGY/2026/2284 Awaiting decision
10 & 12 Gladesmore Road, London, N15 6TB
Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.
-
HGY/2026/2062 Awaiting decision
165 Priory Road, Hornsey, London, N8 8NB
Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.