Planning application
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections.
As published by the council, reference HGY/2025/2192
Application record
- Reference
- HGY/2025/2192
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Approve with Conditions
- Received
- 11 Aug 2025
- Validated
- 11 Aug 2025
- Decided
- 16 Mar 2026
- Ward
- South Tottenham
- Decision by
- Delegated Decision
- Postcode
- N15 4QN
Site history
Applications at this address on the Haringey register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
HGY/2026/2100 Awaiting decision
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.
Timeline
Dates from the published record
-
11 Aug 2025
Received by Haringey
-
16 Mar 2026
Decision issued: Approve with Conditions
-
10 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
HGY/2026/2100 Awaiting decision
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Haringey granted permission on 16 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
93% historically approved · decision due ~15 Oct
Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.
Awaiting decision Amendments 9 docs -
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE
Advertisement Consent for the display of six non-illuminated signs and four illuminated signs
Granted Advertising 15 docs -
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE
Non-Material Amendment to planning permission HGY/2025/2252 comprising repair of existing windows, replacement of cladding, existing windows extended to full height, fill in and rendered entrance door, replace existing roller shutter. The proposed minor amendments relate to changes required to ensure their operational requirements can be met and that the proposed works are aligned with the approved drawings in Condition to facilitate occupation of the Site by the Applicant
Granted Amendments Windows or glazing 8 docs -
UNIT 9, HIGH CROSS CENTRE, Fountayne Road, Tottenham, London, N15 4BE
External alterations to the existing building comprising removal of windows and rendered over, removal of existing roller shutters, existing entrance door replaced with glazing, removal of entrance door, construction of new glazed double sliding entrance door, new bi-fold automatic vehicle gate, new metal fence line with pedestrian access gate and re-levelling of paving area to allow ramp up to reception entrance.
Granted Full applications Windows or glazing 19 docsSmall domestic -
11 High Cross Centre, Fountayne Road, Haringey, London, N15 4QL
83% historically approved · decision due ~1 Jun
Intensification of employment use through the addition of a first-floor height extension and a new second-floor level to enable the creation of a multi-unit business hub with communal amenity space.
Awaiting decision Full applications Extension 33 docs -
7 Fountanye Road, London, N15 4QL
83% historically approved · decision due ~2 Oct
Erection of a first floor rear extension to provide 10 studio units for office/workspace use and 2no. communal WC facilities each with 4no. toilets (retrospective).
Awaiting decision Full applications Extension 5 docs
Other full applications
In Haringey
-
HGY/2026/1488 Granted
203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
-
HGY/2026/2208 Awaiting decision
21 The Grove Lynton Road, Hornsey, London, N8 8ST
Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.
-
HGY/2026/2340 Awaiting decision
Rowan, Muswell Road, Hornsey, London, N10 2BX
The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.
-
HGY/2026/2284 Awaiting decision
10 & 12 Gladesmore Road, London, N15 6TB
Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.
-
HGY/2026/2062 Awaiting decision
165 Priory Road, Hornsey, London, N8 8NB
Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.