Granted Haringey HGY/2025/2192 Full planning permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections.

As published by the council, reference HGY/2025/2192

Application record

Reference
HGY/2025/2192
Type
Full planning permission
Status
Decision Made
Decision
Approve with Conditions
Received
11 Aug 2025
Validated
11 Aug 2025
Decided
16 Mar 2026
Ward
South Tottenham
Decision by
Delegated Decision
Postcode
N15 4QN

Site history

Applications at this address on the Haringey register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • HGY/2026/2100 Awaiting decision

    Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN

    Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.

    Submitted 20 Aug 2026 Amendments

Timeline

Dates from the published record

  1. 11 Aug 2025

    Received by Haringey

  2. 16 Mar 2026

    Decision issued: Approve with Conditions

  3. 10 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • HGY/2026/2100 Awaiting decision

    Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN

    Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.

    Submitted 20 Aug 2026 Amendments

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Haringey granted permission on 16 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN

    HGY/2026/2100 Submitted 20 Aug 2026 0m away

    93% historically approved · decision due ~15 Oct

    Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.

    Awaiting decision Amendments 9 docs
  • Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE

    HGY/2026/0830 Submitted 24 Mar 2026 81m away

    Advertisement Consent for the display of six non-illuminated signs and four illuminated signs

    Granted Advertising 15 docs
  • Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE

    HGY/2026/0820 Submitted 24 Mar 2026 81m away

    Non-Material Amendment to planning permission HGY/2025/2252 comprising repair of existing windows, replacement of cladding, existing windows extended to full height, fill in and rendered entrance door, replace existing roller shutter. The proposed minor amendments relate to changes required to ensure their operational requirements can be met and that the proposed works are aligned with the approved drawings in Condition to facilitate occupation of the Site by the Applicant

    Granted Amendments Windows or glazing 8 docs
  • UNIT 9, HIGH CROSS CENTRE, Fountayne Road, Tottenham, London, N15 4BE

    HGY/2025/2252 Submitted 3 Oct 2025 81m away

    External alterations to the existing building comprising removal of windows and rendered over, removal of existing roller shutters, existing entrance door replaced with glazing, removal of entrance door, construction of new glazed double sliding entrance door, new bi-fold automatic vehicle gate, new metal fence line with pedestrian access gate and re-levelling of paving area to allow ramp up to reception entrance.

    Granted Full applications Windows or glazing 19 docs
    Small domestic
  • 11 High Cross Centre, Fountayne Road, Haringey, London, N15 4QL

    HGY/2026/0754 Submitted 6 Apr 2026 122m away

    83% historically approved · decision due ~1 Jun

    Intensification of employment use through the addition of a first-floor height extension and a new second-floor level to enable the creation of a multi-unit business hub with communal amenity space.

    Awaiting decision Full applications Extension 33 docs
  • 7 Fountanye Road, London, N15 4QL

    HGY/2026/2228 Submitted 7 Aug 2026 122m away

    83% historically approved · decision due ~2 Oct

    Erection of a first floor rear extension to provide 10 studio units for office/workspace use and 2no. communal WC facilities each with 4no. toilets (retrospective).

    Awaiting decision Full applications Extension 5 docs

In Haringey

  • HGY/2026/1488 Granted

    203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    10 Jul 2026 Full applications
  • HGY/2026/2208 Awaiting decision

    21 The Grove Lynton Road, Hornsey, London, N8 8ST

    Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.

    4 Sep 2026 Full applications
  • HGY/2026/2340 Awaiting decision

    Rowan, Muswell Road, Hornsey, London, N10 2BX

    The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.

    4 Sep 2026 Full applications
  • HGY/2026/2284 Awaiting decision

    10 & 12 Gladesmore Road, London, N15 6TB

    Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.

    3 Sep 2026 Full applications
  • HGY/2026/2062 Awaiting decision

    165 Priory Road, Hornsey, London, N8 8NB

    Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.

    2 Sep 2026 Full applications