Planning application
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-material amendment to planning permission HGY/2025/2192 for Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Proposed amendment to use artificial slates instead of composite panels.
As published by the council, reference HGY/2026/2100
Application record
- Reference
- HGY/2026/2100
- Type
- Non-Material Amendment
- Status
- Valid
- Received
- 20 Aug 2026
- Validated
- 20 Aug 2026
- Ward
- South Tottenham
- Decision by
- Delegated Decision
- Postcode
- N15 4QN
Timeline
Dates from the published record
-
20 Aug 2026
Received by Haringey
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Haringey took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Haringey for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN
Re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections.
Granted Full applications 11 docs -
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE
Advertisement Consent for the display of six non-illuminated signs and four illuminated signs
Granted Advertising 15 docs -
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE
Non-Material Amendment to planning permission HGY/2025/2252 comprising repair of existing windows, replacement of cladding, existing windows extended to full height, fill in and rendered entrance door, replace existing roller shutter. The proposed minor amendments relate to changes required to ensure their operational requirements can be met and that the proposed works are aligned with the approved drawings in Condition to facilitate occupation of the Site by the Applicant
Granted Amendments Windows or glazing 8 docs -
UNIT 9, HIGH CROSS CENTRE, Fountayne Road, Tottenham, London, N15 4BE
External alterations to the existing building comprising removal of windows and rendered over, removal of existing roller shutters, existing entrance door replaced with glazing, removal of entrance door, construction of new glazed double sliding entrance door, new bi-fold automatic vehicle gate, new metal fence line with pedestrian access gate and re-levelling of paving area to allow ramp up to reception entrance.
Granted Full applications Windows or glazing 19 docsSmall domestic -
11 High Cross Centre, Fountayne Road, Haringey, London, N15 4QL
83% historically approved · decision due ~1 Jun
Intensification of employment use through the addition of a first-floor height extension and a new second-floor level to enable the creation of a multi-unit business hub with communal amenity space.
Awaiting decision Full applications Extension 33 docs -
7 Fountanye Road, London, N15 4QL
83% historically approved · decision due ~2 Oct
Erection of a first floor rear extension to provide 10 studio units for office/workspace use and 2no. communal WC facilities each with 4no. toilets (retrospective).
Awaiting decision Full applications Extension 5 docs
Other amendments applications
In Haringey
-
HGY/2026/2429 Awaiting decision
Flat 4, 1 Willoughby Road, Hornsey, London, N8 0HR
Non-Material Amendment to planning permission HGY/2015/1594 to convert existing storage room into an additional bedroom, to convert existing 2-bedroom split level flat into a 3-bedroom flat.
-
HGY/2026/1890 Granted
20 Victoria Road, Hornsey, London, N4 3SQ
Non-Material Amendment to planning permission HGY/2025/2901 for the substitution of the approved concealed zinc flat roof covering with a concealed GRP (Glass Reinforced Plastic) flat roof covering to the approved single-storey rear extension.
-
HGY/2026/1927 Granted
86 Southwood Lane, Hornsey, London, N6 5SY
Minor Material Amendment application under Section 73 of the Town and Country Planning Act for variation to condition 2 attached to planning permission HGY/2025/2929 to alter coping details of the boundary wall.
-
HGY/2026/2387 Granted
810 High Road, Tottenham, London, N17 0DH
Non-Material Amendment to amend condition 5 (Landscaping) to allow greater flexibility in potential re-planting attached to Planning Permission HGY/2017/1181 approved on 08/06/2017, in relation to 810-812 High Road, Tottenham, London, N17 0DH
-
HGY/2026/1994 Granted
St Ignatius Church, High Road, Tottenham, London, N15 6ND
Non-Material Amendment to planning reference HGY/2025/1497 for the revisions to the site layout, comprising the widening of the existing path from 1.2m to 1.5m, the addition and relocation of cycle storage, and the relocation of site elements within the scheme, including decorative hard landscaping, together with revised planting areas, the repositioning and addition of seating area.