Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00135/HSC

Univar Solutions Limited Hale Road Industrial Estate Pickerings Road Widnes WA8 8XW

Awaiting decision Halton Hazardous Substance Consent

Proposal

Application for Hazardous Substances Consent at

As published by the council, reference 26/00135/HSC

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Halton

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Halton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • 26/00181/S73 Granted

    Halebank House Pickerings Road Widnes WA8 8XW WA8 8XW

    Application under Section 73 of the Town and Country Planning Act to vary condition no. 3 of planning permission 26/00007/FUL to enable the grass mound to be removed prior to providing the drainage scheme for approval at

    13 May 2026 166m away Conditions
  • 26/00153/COND Decided

    Roberts Recycling Ltd Halebank House Pickerings Road Widnes WA8 8XW

    Application to discharge condition no. 5 (Landscape Ecological Management Plan) and condition no. 4 (Biodiversity Net Gain) of planning permission 26/00007/FUL at

    5 May 2026 166m away Conditions
  • 21/00326/FUL Granted

    7 Blackburne Avenue Widnes Cheshire WA8 8UX

    Proposed single storey side extension at

    27 May 2021 241m away Full applications
  • 25/00196/FUL Awaiting decision

    Central Waste Ltd Pickerings Road Widnes WA8 8XW

    Change of use from vehicle recycling and storage (Sui Generis) to mixed use comprising vehicle depot and offices (Sui Generis), and proposed extension and alteration to existing building at

    8 May 2025 387m away Full applications
  • 21/00103/COND Decided

    Former Widnes Timber Centre Land Off Foundry Lane Widnes WA8 8TZ

    Application to discharge condition nos 6 (levels), 7 (materials), 8 (boundary treatment), 9 (soft landscaping), 12 (cycle parking), 13 (electric vehicle charging), 14 (highway improvements), 16 (site investigation) and 17 (SuDS) of planning permission 19/00518/FUL at

    20 Feb 2021 471m away Conditions

In Halton

  • 26/00122/DEM Withdrawn

    Colin Myers Timber And Sawmill Hale Road Widnes Cheshire WA8 8PX

    Prior notification of proposed demolition of existing traditional construction (brick / blockwork) single-storey building and part demolition of existing portal frame building at

    7 Apr 2026 Other
  • 26/00118/HBCDEM Granted

    Golden Triangle Industrial Estate Harrison Street Widnes Cheshire WA8 8TN

    Prior notification of proposed demolition of buildings at

    26 Mar 2026 Other
  • 26/00205/DEM Awaiting decision

    Halton Borough Council Municipal Building Kingsway Widnes Cheshire WA8 7QF

    Prior notification of proposed demolition of seven storey office building (Use Class E) and single storey electrical substation at

    2 Jun 2026 Other
  • 25/00293/FULEIA Awaiting decision

    Runcorn Carbon Dioxide Spur Pipeline

    Proposed construction of a new carbon dioxide spur pipeline, an Above Ground Installation (AGI), plus ancillary works and equipment to serve Viridor Energy from Waste (EfW) Facility Carbon Capture Plant at

    4 Jul 2025 Other
  • 23/00063/DEM Granted

    Low Wood Keckwick Lane Daresbury Warrington Cheshire WA4 4AB

    Prior notification of proposed demolition of bungalow at

    15 Feb 2023 Other