Skip to content
PlanIndex Get alerts
Menu

Planning application

25/00196/FUL

Central Waste Ltd Pickerings Road Widnes WA8 8XW

Awaiting decision Halton Full Application

Proposal

Change of use from vehicle recycling and storage (Sui Generis) to mixed use comprising vehicle depot and offices (Sui Generis), and proposed extension and alteration to existing building at

As published by the council, reference 25/00196/FUL

Timeline

Dates from the published record

  1. 8 May 2025

    Received by Halton

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Halton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00181/S73 Granted

    Halebank House Pickerings Road Widnes WA8 8XW WA8 8XW

    Application under Section 73 of the Town and Country Planning Act to vary condition no. 3 of planning permission 26/00007/FUL to enable the grass mound to be removed prior to providing the drainage scheme for approval at

    13 May 2026 386m away Conditions
  • 26/00153/COND Decided

    Roberts Recycling Ltd Halebank House Pickerings Road Widnes WA8 8XW

    Application to discharge condition no. 5 (Landscape Ecological Management Plan) and condition no. 4 (Biodiversity Net Gain) of planning permission 26/00007/FUL at

    5 May 2026 386m away Conditions
  • 26/00135/HSC Awaiting decision

    Univar Solutions Limited Hale Road Industrial Estate Pickerings Road Widnes WA8 8XW

    Application for Hazardous Substances Consent at

    17 Apr 2026 387m away Other
  • 21/00103/COND Decided

    Former Widnes Timber Centre Land Off Foundry Lane Widnes WA8 8TZ

    Application to discharge condition nos 6 (levels), 7 (materials), 8 (boundary treatment), 9 (soft landscaping), 12 (cycle parking), 13 (electric vehicle charging), 14 (highway improvements), 16 (site investigation) and 17 (SuDS) of planning permission 19/00518/FUL at

    20 Feb 2021 442m away Conditions

In Halton

  • 26/00060/FUL Granted

    101 Chadwick Road Runcorn Cheshire WA7 1PW

    Proposed single storey extension to an existing industrial unit at

    18 Feb 2026 Full applications
  • 26/00204/FUL Granted

    17 Poolside Road Runcorn Cheshire WA7 5QQ

    Proposed single storey rear extension at

    3 Jun 2026 Full applications
  • 26/00061/FUL Refused

    Tileacres 29 Hale Road Hale Liverpool L24 5RB

    Proposed (part-retrospective) two storey side extension and single storey rear extension and balcony to the side (retrospective) and rear at

    18 Feb 2026 Full applications
  • 26/00163/FUL Granted

    52 Cheltenham Crescent Runcorn Cheshire WA7 4YT

    Proposed single storey side and rear extension at

    8 May 2026 Full applications
  • 26/00239/COU Withdrawn

    36 Widnes Road Widnes Cheshire WA8 6AP

    Proposed change of use from existing DIY shop (Use Class E) to restaurant/takeaway (Use Class Sui Generis) with installation of extraction flue, erection of external fridges to the rear and installation of new shop front at

    1 May 2026 Full applications