25/00293/FULEIA

Runcorn Carbon Dioxide Spur Pipeline

Awaiting decision Halton Other

Proposal

Proposed construction of a new carbon dioxide spur pipeline, an Above Ground Installation (AGI), plus ancillary works and equipment to serve Viridor Energy from Waste (EfW) Facility Carbon Capture Plant at

As published by the council, reference 25/00293/FULEIA

Timeline

Dates from the published record

  1. 4 Jul 2025

    Received by Halton

  2. 8 Jul 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Halton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • 25/02108/FUL Awaiting decision

    Land At Cross Lane Frodsham

    Construction of a new Carbon Dioxide Spur Pipeline and Above Ground Installation (AGI) and ancillary equipment to serve the Viridor Energy from Waste (Efw) Facility Carbon Capture Plant

    3 Jul 2025 0m away Full applications

In Halton

  • 26/00122/DEM Withdrawn

    Colin Myers Timber And Sawmill Hale Road Widnes Cheshire WA8 8PX

    Prior notification of proposed demolition of existing traditional construction (brick / blockwork) single-storey building and part demolition of existing portal frame building at

    7 Apr 2026 Other
  • 26/00118/HBCDEM Granted

    Golden Triangle Industrial Estate Harrison Street Widnes Cheshire WA8 8TN

    Prior notification of proposed demolition of buildings at

    26 Mar 2026 Other
  • 26/00205/DEM Awaiting decision

    Halton Borough Council Municipal Building Kingsway Widnes Cheshire WA8 7QF

    Prior notification of proposed demolition of seven storey office building (Use Class E) and single storey electrical substation at

    2 Jun 2026 Other
  • 26/00135/HSC Awaiting decision

    Univar Solutions Limited Hale Road Industrial Estate Pickerings Road Widnes WA8 8XW

    Application for Hazardous Substances Consent at

    17 Apr 2026 Other
  • 23/00063/DEM Granted

    Low Wood Keckwick Lane Daresbury Warrington Cheshire WA4 4AB

    Prior notification of proposed demolition of bungalow at

    15 Feb 2023 Other