Planning application

Runcorn Carbon Dioxide Spur Pipeline

Awaiting decision Halton 25/00293/FULEIA Other

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed construction of a new carbon dioxide spur pipeline, an Above Ground Installation (AGI), plus ancillary works and equipment to serve Viridor Energy from Waste (EfW) Facility Carbon Capture Plant at

As published by the council, reference 25/00293/FULEIA

Application record

Reference
25/00293/FULEIA
Type
Other
Status
Registered
Received
4 Jul 2025
Validated
8 Jul 2025
Ward
Mersey & Weston
Parish
No Parish

Timeline

Dates from the published record

  1. 4 Jul 2025

    Received by Halton

  2. 8 Jul 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 2 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Halton took a median of 62 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

WSP Ltd Agent, registered in Cobham

Active · incorporated 2001 · Cobham

735 applications on PlanIndex · across 136 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

162 documents on file for this application

  • RU.4.4 RUNCORN SPUR PIPELINE HABITAT REGULATIONS ASSESSMENT REV B Supporting Documents · 16 Sep 2026
  • TECHNICAL NOTE NATIONAL HIGHWAYS Supporting Documents · 19 Mar 2026
  • LBCCS SOIL STABILISATION CLARIFICATION Supporting Documents · 09 Feb 2026
  • RU.3.3.9.2 RUNCORN SPUR PIPELINE ES APPENDIX 9.2 - PRELIMINARY ECOLOGICAL ASSESS Supporting Documents · 30 Oct 2025
  • RU.3.3.9.2 RUNCORN SPUR PIPELINE ES APPENDIX 9.2 - PRELIMINARY ECOLOGICAL ASSESS Supporting Documents · 30 Oct 2025
  • APPLICATION FORM REDACTED Application Form · 19 Aug 2025
  • RU.4.3 RUNCORN SPUR PIPELINE ANNEX D - STATUTORY_BIODIVERSITY_METRIC_CALCULATION Biodiversity · 19 Aug 2025
  • RU.4.3 RUNCORN SPUR PIPELINE BIODIVERSITY NET GAIN ASSESSMENT REV B Biodiversity · 19 Aug 2025
  • RU.2.3 RUNCRON SPUR PIPELINE - PLANNING DESIGN AND ACCESS STATEMENT REV B Supporting Documents · 19 Aug 2025
  • 70116228-RU.2.2.9-PLN-SHEET1 - ABOVE-GROUND PIPELINE SECTION - RUNCORN NORTH BRI Plans · 04 Jul 2025
  • 70116228-RU.2.2.8-PLN-SHEET1 - ABOVE-GROUND PIPELINE SECTION - TYPICAL PIPELINE Plans · 04 Jul 2025
  • 70116228-RU.2.2.7-EL-SHEET1 - INCE AGI EXISTING AND PROPOSED ELEVATIONS Plans · 04 Jul 2025
  • 70116228-RU.2.2.6-LAY-SHEET1 - INCE AGI EXISTING AND PROPOSED LAYOUT Plans · 04 Jul 2025
  • 70116228-RU.2.2.5-LAY-SHEET1 - RUNCORN AGI SITE PREPARATION LAYOUT Plans · 04 Jul 2025
  • 70116228-RU.2.2.4-EL-SHEET1 - RUNCORN AGI PROPOSED ELEVATIONS Plans · 04 Jul 2025
  • 70116228-RU.2.2.3-LAY-SHEET1 - RUNCORN AGI PROPOSED LAYOUT Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET15 - PROPOSED SITE LAYOUT PLAN SHEET 15 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET14 - PROPOSED SITE LAYOUT PLAN SHEET 14 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET13 - PROPOSED SITE LAYOUT PLAN SHEET 13 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET12 - PROPOSED SITE LAYOUT PLAN SHEET 12 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET11 - PROPOSED SITE LAYOUT PLAN SHEET 11 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET10 - PROPOSED SITE LAYOUT PLAN SHEET 10 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET09 - PROPOSED SITE LAYOUT PLAN SHEET 09 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET08 - PROPOSED SITE LAYOUT PLAN SHEET 08 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET07 - PROPOSED SITE LAYOUT PLAN SHEET 07 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET06 - PROPOSED SITE LAYOUT PLAN SHEET 06 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET05 - PROPOSED SITE LAYOUT PLAN SHEET 05 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET04 - PROPOSED SITE LAYOUT PLAN SHEET 04 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET03 - PROPOSED SITE LAYOUT PLAN SHEET 03 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET02 - PROPOSED SITE LAYOUT PLAN SHEET 02 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.2-LAY-SHEET01 - PROPOSED SITE LAYOUT PLAN SHEET 01 OF 15 Plans · 04 Jul 2025
  • 70116228-RU.2.2.13-LAY-SHEET1 - RUNCORN SPUR PIPELINE PROPOSED DEVELOPMENT AND T Plans · 04 Jul 2025
  • 70116228-RU.2.2.12-CX-SHEET1 - TYPICAL TRENCH CROSS SECTION Plans · 04 Jul 2025
  • 70116228-RU.2.2.11-PLN-SHEET1- GENERAL TYPICAL VERTICAL PIPELINE EXPANSION LOOP Plans · 04 Jul 2025
  • 70116228-RU.2.2.10-PLN-SHEET1 - ABOVE-GROUND PIPELINE SECTION - RUNCORN AND WEST Plans · 04 Jul 2025
  • 70116228-RU.2.2.1-SLP-SHEET1 - SITE LOCATION PLAN Plans · 04 Jul 2025
  • RU.4.2 RUNCORN SPUR PIPELINE OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Documents · 04 Jul 2025
  • RU.4.1 RUNCORN SPUR PIPELINE OUTLINE ENVIRONMENTAL MANAGEMENT PLAN Supporting Documents · 04 Jul 2025
  • RU.3.4.9.7 RUNCORN SPUR PIPELINE ES FIGURE 9.7 - CONSTRAINTS MAP REDACTED Supporting Documents · 04 Jul 2025
  • RU.3.4.9.6 RUNCORN SPUR PIPELINE ES FIGURE 9.6 - UKHAB CLASSIFICATION MAP Supporting Documents · 04 Jul 2025
  • RU.3.4.9.5 RUNCORN SPUR PIPELINE ES FIGURE 9.5 - OTHER AREAS OF CONSERVATION IMP Supporting Documents · 04 Jul 2025
  • RU.3.4.9.4 RUNCORN SPUR PIPELINE ES FIGURE 9.4 - NON-STATUTORY DESIGNATED SITES Supporting Documents · 04 Jul 2025
  • RU.3.4.9.3 RUNCORN SPUR PIPELINE ES FIGURE 9.3 - NATIONAL STATUTORY DESIGNATED S Supporting Documents · 04 Jul 2025
  • RU.3.4.9.2 RUNCORN SPUR PIPELINE ES FIGURE 9.2 - INTERNATIONAL STATUTORY DESIGNA Supporting Documents · 04 Jul 2025
  • RU.3.4.9.1 RUNCORN SPUR PIPELINE ES FIGURE 9.1 - SITE BOUNDARY Supporting Documents · 04 Jul 2025
  • RU.3.4.8.1 RUNCORN SPUR PIPELINE ES FIGURE 8.1 - KNOWN HERITAGE ASSETS Supporting Documents · 04 Jul 2025
  • RU.3.4.4.7 RUNCORN SPUR PIPELINE ES FIGURE 4.7 - DESIGN FREEZE 2 NORTH Supporting Documents · 04 Jul 2025
  • RU.3.4.4.6 RUNCORN SPUR PIPELINE ES FIGURE 4.6 - DESIGN FREEZE 1B AND NORTHERN R Supporting Documents · 04 Jul 2025
  • RU.3.4.4.5 RUNCORN SPUR PIPELINE ES FIGURE 4.5 - DESIGN FREEZE 1 RED LINE BOUNDA Supporting Documents · 04 Jul 2025
  • RU.3.4.4.4 RUNCORN SPUR PIPELINE ES FIGURE 4.4 - GOLDSET RESULTS Supporting Documents · 04 Jul 2025
  • RU.3.4.4.3 RUNCORN SPUR PIPELINE ES FIGURE 4.3 - ROUTE OPTIONS Supporting Documents · 04 Jul 2025
  • RU.3.4.4.2 RUNCORN SPUR PIPELINE ES FIGURE 4.2 - STRATEGIC CORRIDOR Supporting Documents · 04 Jul 2025
  • RU.3.4.4.1 RUNCORN SPUR PIPELINE ES FIGURE 4.1 - STUDY AREA Supporting Documents · 04 Jul 2025
  • RU.3.4.3.4 RUNCORN SPUR PIPELINE ES FIGURE 3.4 - MANCHESTER SHIP CANAL DEPOSIT G Supporting Documents · 04 Jul 2025
  • RU.3.4.3.3 RUNCORN SPUR PIPELINE ES FIGURE 3.3 - RUNCORN SPUR PIPELINE PROPOSED Supporting Documents · 04 Jul 2025
  • RU.3.4.3.2 RUNCORN SPUR PIPELINE ES FIGURE 3.2 - RUNCORN SPUR PIPELINE PROPOSED Supporting Documents · 04 Jul 2025
  • RU.3.4.3.1 RUNCORN SPUR PIPELINE ES FIGURE 3.1 - RED LINE BOUNDARY Supporting Documents · 04 Jul 2025
  • RU.3.4.18.1 RUNCORN SPUR PIPELINE ES FIGURE 18.1 - SHORT LIST OF OTHER DEVELOPME Supporting Documents · 04 Jul 2025
  • RU.3.4.17.3 RUNCORN SPUR PIPELINE ES FIGURE 17.3 - INDICATIVE DRAINAGE DESIGN Supporting Documents · 04 Jul 2025
  • RU.3.4.17.2 RUNCORN SPUR PIPELINE ES FIGURE 17.2 - PROTECTED AREAS Supporting Documents · 04 Jul 2025
  • RU.3.4.17.1 RUNCORN SPUR PIPELINE FIGURE 17.1 - WATERCOURSES (WITH CROSSINGS) Supporting Documents · 04 Jul 2025
  • RU.3.4.16.5 RUNCORN SPUR PIPELINE ES FIGURE 16.5 - PUBLIC RIGHTS OF WAY (PROW) D Supporting Documents · 04 Jul 2025
  • RU.3.4.16.4 RUNCORN SPUR PIPELINE ES FIGURE 16.4 - ACCESS LOCATIONS Supporting Documents · 04 Jul 2025
  • RU.3.4.16.3 RUNCORN SPUR PIPELINE ES FIGURE 16.3 - CONSTRUCTION TRAFFIC ROUTES Supporting Documents · 04 Jul 2025
  • RU.3.4.16.2 RUNCORN SPUR PIPELINE ES FIGURE 16.2 - PERSONAL INJURY ACCIDENT LOCA Supporting Documents · 04 Jul 2025
  • RU.3.4.16.1 RUNCORN SPUR PIPELINE ES FIGURE 16.1 - TRAFFIC AND TRANSPORT ZONE OF Supporting Documents · 04 Jul 2025
  • RU.3.4.15.2 RUNCORN SPUR PIPELINE ES FIGURE 15.2 - PUBLIC RIGHTS OF WAY (PROW) Supporting Documents · 04 Jul 2025
  • RU.3.4.15.1 RUNCORN SPUR PIPELINE ES FIGURE 15.1 - POPULATION AND HUMAN HEALTH S Supporting Documents · 04 Jul 2025
  • RU.3.4.14.2 RUNCORN SPUR PIPELINE ES FIGURE 14.2 - MAGNITUDE OF IMPACT, DAYTIME Supporting Documents · 04 Jul 2025
  • RU.3.4.14.1 RUNCORN SPUR PIPELINE ES FIGURE 14.1 - NOISE MONITORING LOCATIONS & Supporting Documents · 04 Jul 2025
  • RU.3.4.12.4 RUNCORN SPUR PIPELINE ES FIGURE 12.4 - VIEWPOINT LOCATION PLAN Supporting Documents · 04 Jul 2025
  • RU.3.4.12.3 RUNCORN SPUR PIPELINE ES FIGURE 12.3 - VIEWPOINT PHOTOGRAPHY (PART 4 Supporting Documents · 04 Jul 2025
  • RU.3.4.12.3 RUNCORN SPUR PIPELINE ES FIGURE 12.3 - VIEWPOINT PHOTOGRAPHY (PART 3 Supporting Documents · 04 Jul 2025
  • RU.3.4.12.3 RUNCORN SPUR PIPELINE ES FIGURE 12.3 - VIEWPOINT PHOTOGRAPHY (PART 2 Supporting Documents · 04 Jul 2025
  • RU.3.4.12.3 RUNCORN SPUR PIPELINE ES FIGURE 12.3 - VIEWPOINT PHOTOGRAPHY (PART 1 Supporting Documents · 04 Jul 2025
  • RU.3.4.12.2 RUNCORN SPUR PIPELINE ES FIGURE 12.2 - LANDSCAPE CHARACTER PLAN Supporting Documents · 04 Jul 2025
  • RU.3.4.12.1 RUNCORN SPUR PIPELINE ES FIGURE 12.1 - ZONE OF THEORETICAL VISIBILIT Supporting Documents · 04 Jul 2025
  • RU.3.3.9.9 RUNCORN SPUR PIPELINE ES APPENDIX 9.9 - AQUATIC MACROINVERTEBRATE AND Supporting Documents · 04 Jul 2025
  • RU.3.3.9.8 RUNCORN SPUR PIPELINE ES APPENDIX 9.8 - PRELIMINARY AQUATIC ECOLOGY A Supporting Documents · 04 Jul 2025
  • RU.3.3.9.7 RUNCORN SPUR PIPELINE ES APPENDIX 9.7 - RIPARIAN MAMMAL REPORT Supporting Documents · 04 Jul 2025
  • RU.3.3.9.5 RUNCORN SPUR PIPELINE ES APPENDIX 9.5 - GREAT CRESTED NEWT HSI AND ED Supporting Documents · 04 Jul 2025
  • RU.3.3.9.3 RUNCORN SPUR PIPELINE ES APPENDIX 9.3 - WINTERING BIRDS SURVEY REPORT Supporting Documents · 04 Jul 2025
  • RU.2.1.10 RUNCORN SPUR PIPELINE - SUSTAINABLE CONSTRUCTION CHECKLIST Supporting Documents · 04 Jul 2025
  • RU.2.1.2 RUNCORN SPUR PIPELINE - COVER LETTER CWCC Supporting Documents · 04 Jul 2025
  • RU.2.1.3 RUNCORN SPUR PIPELINE - COVER LETTER HBC Supporting Documents · 04 Jul 2025
  • RU.3.3.9.3 RUNCORN SPUR PIPELINE ES APPENDIX 9.3 - WINTERING BIRDS SURVEY REPORT Supporting Documents · 04 Jul 2025
  • RU.3.3.9.1 RUNCORN SPUR PIPELINE ES APPENDIX 9.1 - ARBORICULTURAL IMPACT ASSESSM Supporting Documents · 04 Jul 2025
  • RU.3.3.8.4 RUNCORN SPUR PIPELINE ES APPENDIX 8.4 - GEOARCHAEOLOGICAL DESK-BASED Supporting Documents · 04 Jul 2025
  • RU.3.3.8.3 RUNCORN SPUR PIPELINE ES APPENDIX 8.3 - GEOPHYSICAL SURVEY REPORT Supporting Documents · 04 Jul 2025
  • RU.3.3.8.2 RUNCORN SPUR PIPELINE ES APPENDIX 8.2 - CULTURAL HERITAGE IMPACT ASSE Supporting Documents · 04 Jul 2025
  • RU.3.3.8.1 RUNCORN SPUR PIPELINE ES APPENDIX 8.1 - CULTURAL HERITAGE BASELINE RE Supporting Documents · 04 Jul 2025
  • RU.3.3.6.2 RUNCORN SPUR PIPELINE ES APPENDIX 6.2 - AQ OPERATIONAL MODELLING Supporting Documents · 04 Jul 2025
  • RU.3.3.6.1 RUNCORN SPUR PIPELINE ES APPENDIX 6.1 - CONSTRUCTION DUST METHODOLOGY Supporting Documents · 04 Jul 2025
  • RU.3.3.5.1 RUNCORN SPUR PIPELINE ES APPENDIX 5.1 - TABLE OF RELEVANT EXPERTISE A Supporting Documents · 04 Jul 2025
  • RU.3.3.4.2 RUNCORN SPUR PIPELINE ES APPENDIX 4.2 - ALTERNATIVE ROUTE FEASIBILITY Supporting Documents · 04 Jul 2025
  • RU.3.3.4.1 RUNCORN SPUR PIPELINE ES APPENDIX 4.1 - GOLDSET WEIGHTING Supporting Documents · 04 Jul 2025
  • RU.3.3.18.2 RUNCORN SPUR PIPELINE ES APPENDIX 18.2 - INTRA-PROJECT EFFECTS ASSES Supporting Documents · 04 Jul 2025
  • RU.3.3.18.1 RUNCORN SPUR PIPELINE ES APPENDIX 18.1 - INTER-PROJECT EFFECTS ASSES Supporting Documents · 04 Jul 2025
  • RU.3.3.17.4 RUNCORN SPUR PIPELINE ES APPENDIX 17.4 - ASSESSMENT OF EFFECTS Supporting Documents · 04 Jul 2025
  • RU.3.3.17.3 RUNCORN SPUR PIPELINE ES APPENDIX 17.3 - WATER FRAMEWORK DIRECTIVE A Supporting Documents · 04 Jul 2025
  • RU.3.3.17.2 RUNCORN SPUR PIPELINE ES APPENDIX 17.2 - FLOOD RISK ASSESSMENT (PART Supporting Documents · 04 Jul 2025
  • RU.3.3.17.2 RUNCORN SPUR PIPELINE ES APPENDIX 17.2 - FLOOD RISK ASSESSMENT (PART Supporting Documents · 04 Jul 2025
  • RU.3.3.17.2 RUNCORN SPUR PIPELINE ES APPENDIX 17.2 - FLOOD RISK ASSESSMENT (PART Supporting Documents · 04 Jul 2025
  • RU.3.3.17.1 RUNCORN SPUR PIPELINE ES APPENDIX 17.1 - BASELINE INFORMATION Supporting Documents · 04 Jul 2025
  • RU.3.3.16.6 RUNCORN SPUR PIPELINE ES APPENDIX 16.6 - OUTLINE PUBLIC RIGHTS OF WA Supporting Documents · 04 Jul 2025
  • RU.3.3.16.5 RUNCORN SPUR PIPELINE ES APPENDIX 16.5 - FUTURE YEAR TRAFFIC DATA Supporting Documents · 04 Jul 2025
  • RU.3.3.16.4 RUNCORN SPUR PIPELINE ES APPENDIX 16.4 - BASELINE TRAFFIC DATA Supporting Documents · 04 Jul 2025
  • RU.3.3.16.3 RUNCORN SPUR PIPELINE ES APPENDIX 16.3 - INTERIM WORKER TRAVEL PLAN Supporting Documents · 04 Jul 2025
  • RU.3.3.16.2 RUNCORN SPUR PIPELINE ES APPENDIX 16.2 - TRANSPORT ASSESSMENT Supporting Documents · 04 Jul 2025
  • RU.3.3.16.1 RUNCORN SPUR PIPELINE ES APPENDIX 16.1 - METHODOLOGY. Supporting Documents · 04 Jul 2025
  • RU.3.3.14.3 RUNCORN SPUR PIPELINE ES APPENDIX 14.3 - NOISE AND VIBRATION ASSESSM Supporting Documents · 04 Jul 2025
  • RU.3.3.14.2 RUNCORN SPUR PIPELINE ES APPENDIX 14.2 - NOISE AND VIBRATION ASSESSM Supporting Documents · 04 Jul 2025
  • RU.3.3.14.1 RUNCORN SPUR PIPELINE ES APPENDIX 14.1 - BASELINE NOISE MONITORING D Supporting Documents · 04 Jul 2025
  • RU.3.3.13.3 RUNCORN SPUR PIPELINE ES APPENDIX 13.3 - MA&D IMPACT ASSESSMENT METH Supporting Documents · 04 Jul 2025
  • RU.3.3.13.2 RUNCORN SPUR PIPELINE ES APPENDIX 13.2 - ES RISK RECORD Supporting Documents · 04 Jul 2025
  • RU.3.3.13.1 RUNCORN SPUR PIPELINE ES APPENDIX 13.1 - MAJOR ACCIDENTS AND DISASTE Supporting Documents · 04 Jul 2025
  • RU.3.3.12.3 RUNCORN SPUR PIPELINE ES APPENDIX 12.3 - VISUAL ANALYSIS Supporting Documents · 04 Jul 2025
  • RU.3.3.12.2 RUNCORN SPUR PIPELINE ES APPENDIX 12.2 - LANDSCAPE ANALYSIS Supporting Documents · 04 Jul 2025
  • RU.3.3.12.1 RUNCORN SPUR PIPELINE ES APPENDIX 12.1 - LANDSCAPE AND VISUAL METHOD Supporting Documents · 04 Jul 2025
  • RU.3.3.11.2 LEACHATE SAMPLES ES APPENDIX 11.2 - PHASE 2 GEOENVIRONMENTAL 4 OF 4 Supporting Documents · 04 Jul 2025
  • RU.3.3.11.2 SOIL VOC/SVOC SAMPLES ES APPENDIX 11.2 - PHASE 2 GEOENVIRONMENTAL 3 Supporting Documents · 04 Jul 2025
  • RU.3.3.11.2 ANALYTICAL RESULTS ES APPENDIX 11.2 - PHASE 2 GEOENVIRONMENTAL 2 OF Supporting Documents · 04 Jul 2025
  • RU.3.3.11.2 ES APPENDIX 11.2 - PHASE 2 GEOENVIRONMENTAL 1 OF 4 Supporting Documents · 04 Jul 2025
  • RU.3.3.11.1 RUNCORN SPUR PIPELINE ES APPENDIX 11.1 - PRELIMINARY RISK ASSESSMENT Supporting Documents · 04 Jul 2025
  • RU.3.3.11.1 RUNCORN SPUR PIPELINE ES APPENDIX 11.1 - PRELIMINARY RISK ASSESSMENT Supporting Documents · 04 Jul 2025
  • RU.3.3.11.1 RUNCORN SPUR PIPELINE ES APPENDIX 11.1 - PRELIMINARY RISK ASSESSMENT Supporting Documents · 04 Jul 2025
  • RU.3.3.11.1 RUNCORN SPUR PIPELINE ES APPENDIX 11.1 - PRELIMINARY RISK ASSESSMENT Supporting Documents · 04 Jul 2025
  • RU.3.3.11.1 RUNCORN SPUR PIPELINE ES APPENDIX 11.1 - PRELIMINARY RISK ASSESSMENT Supporting Documents · 04 Jul 2025
  • RU.3.3.1.3 RUNCORN SPUR PIPELINE ES APPENDIX 1.3 - SCOPING OPINION RESPONSES Supporting Documents · 04 Jul 2025
  • RU.3.3.1.2 RUNCORN SPUR PIPELINE ES APPENDIX 1.2 - SCOPING OPINION Supporting Documents · 04 Jul 2025
  • RU.3.3.1.1 RUNCORN SPUR PIPELINE ES APPENDIX 1.1 - SCOPING REPORT Supporting Documents · 04 Jul 2025
  • RU.3.2.9 RUNCORN SPUR PIPELINE ES CHAPTER 9 - BIODIVERSITY Supporting Documents · 04 Jul 2025
  • RU.3.2.8 RUNCORN SPUR PIPELINE ES CHAPTER 8 - CULTURAL HERITAGE Supporting Documents · 04 Jul 2025
  • RU.3.2.7 RUNCORN SPUR PIPELINE ES CHAPTER 7 - CLIMATE RESILIENCE Supporting Documents · 04 Jul 2025
  • RU.3.2.6 RUNCORN SPUR PIPELINE ES CHAPTER 6 - AIR QUALITY Supporting Documents · 04 Jul 2025
  • RU.3.2.5 RUNCORN SPUR PIPELINE ES CHAPTER 5 - EIA METHODOLOGY Supporting Documents · 04 Jul 2025
  • RU.3.2.4 RUNCORN SPUR PIPELINE ES CHAPTER 4 - CONSIDERATION OF ALTERNATIVES Supporting Documents · 04 Jul 2025
  • RU.3.2.3 RUNCORN SPUR PIPELINE ES CHAPTER 3 - DESCRIPTION OF THE RUNCORN SPUR PI Supporting Documents · 04 Jul 2025
  • RU.3.2.20 RUNCORN SPUR PIPELINE ES CHAPTER 20 - GLOSSARY AND ABBREVIATIONS Supporting Documents · 04 Jul 2025
  • RU.3.2.2 RUNCORN SPUR PIPELINE ES CHAPTER 2 - THE PROJECT Supporting Documents · 04 Jul 2025
  • RU.3.2.19 RUNCORN SPUR PIPELINE ES CHAPTER 19 - SUMMARY OF SIGNIFICANT EFFECTS Supporting Documents · 04 Jul 2025
  • RU.3.2.18 RUNCORN SPUR PIPELINE ES CHAPTER 18 - CUMULATIVE EFFECTS ASSESSMENT Supporting Documents · 04 Jul 2025
  • RU.3.2.17 RUNCORN SPUR PIPELINE ES CHAPTER 17 - WATER RESOURCES AND FLOOD RISK Supporting Documents · 04 Jul 2025
  • RU.3.2.16 RUNCORN SPUR PIPELINE ES CHAPTER 16 - TRAFFIC AND TRANSPORT Supporting Documents · 04 Jul 2025
  • RU.3.2.15 RUNCORN SPUR PIPELINE ES CHAPTER 15 - POPULATION AND HUMAN HEALTH Supporting Documents · 04 Jul 2025
  • RU.3.2.15 RUNCORN SPUR PIPELINE ES APPENDIX 15.1 - LAND USE ASSETS AND ACCESSIBI Supporting Documents · 04 Jul 2025
  • RU.3.2.14 RUNCORN SPUR PIPELINE ES CHAPTER 14 - NOISE AND VIBRATION Supporting Documents · 04 Jul 2025
  • RU.3.2.13 RUNCORN SPUR PIPELINE ES CHAPTER 13 - MAJOR ACCIDENTS AND DISASTERS Supporting Documents · 04 Jul 2025
  • RU.3.2.12 RUNCORN SPUR PIPELINE ES CHAPTER 12 - LANDSCAPE AND VISUAL Supporting Documents · 04 Jul 2025
  • RU.3.2.11 RUNCORN SPUR PIPELINE ES CHAPTER 11 - LAND AND SOILS Supporting Documents · 04 Jul 2025
  • RU.3.2.1 RUNCORN SPUR PIPELINE ES CHAPTER 1 - INTRODUCTION Supporting Documents · 04 Jul 2025
  • RU.3.1 RUNCORN SPUR PIPELINE ES NON-TECHNICAL SUMMARY Supporting Documents · 04 Jul 2025
  • RU.2.4 RUNCORN SPUR PIPELINE - STATEMENT OF COMMUNITY INVOLVEMENT (PART 3 OF 3) Supporting Documents · 04 Jul 2025
  • RU.2.4 RUNCORN SPUR PIPELINE - STATEMENT OF COMMUNITY INVOLVEMENT (PART 2 OF 3) Supporting Documents · 04 Jul 2025
  • RU.2.4 RUNCORN SPUR PIPELINE - STATEMENT OF COMMUNITY INVOLVEMENT (PART 1 OF 3) Supporting Documents · 04 Jul 2025
  • RU.2.1.9 RUNCORN SPUR PIPELINE - HEALTH IMPACT STATEMENT Supporting Documents · 04 Jul 2025
  • RU.2.1.8 RUNCORN SPUR PIPELINE - CIL FORM Supporting Documents · 04 Jul 2025
  • RU.2.1.7 RUNCORN SPUR PIPELINE - ARTICLE 13 NOTICE 2 PRESS NOTICE EXCERPT 2 Supporting Documents · 04 Jul 2025
  • RU.2.1.6 RUNCORN SPUR PIPELINE - ARTICLE 13 NOTICE 2 PRESS NOTICE EXCERPT 1 Supporting Documents · 04 Jul 2025
  • RU.2.1.5 RUNCORN SPUR PIPELINE - ARTICLE 13 LETTER Supporting Documents · 04 Jul 2025
  • RU.2.1.4 RUNCORN SPUR PIPELINE - ARTICLE 13 NOTICE 1 Supporting Documents · 04 Jul 2025
  • RU.3.2.10 RUNCORN SPUR PIPELINE ES CHAPTER 10 - GREENHOUSE GAS Supporting Documents · 04 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Halton for determination, against a statutory target of eight weeks. Over the last year Halton's median decision took 62 days. More in our guide to how long planning decisions take.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land At Cross Lane Frodsham

    25/02108/FUL Submitted 3 Jul 2025 50 yards away

    94% historically approved · decision due ~10 Oct

    Construction of a new Carbon Dioxide Spur Pipeline and Above Ground Installation (AGI) and ancillary equipment to serve the Viridor Energy from Waste (Efw) Facility Carbon Capture Plant

    Awaiting decision Full applications 177 docs

In Halton

  • 26/00122/DEM Withdrawn

    Colin Myers Timber And Sawmill Hale Road Widnes Cheshire WA8 8PX

    Prior notification of proposed demolition of existing traditional construction (brick / blockwork) single-storey building and part demolition of existing portal frame building at

    Received 7 Apr, published by the council 21 Jul 2026 Other
  • 26/00118/HBCDEM Granted

    Golden Triangle Industrial Estate Harrison Street Widnes Cheshire WA8 8TN

    Prior notification of proposed demolition of buildings at

    Received 26 Mar, published by the council 21 Jul 2026 Other
  • 26/00135/HSC Awaiting decision

    Univar Solutions CD&S UK Limited Hale Road Industrial Estate Pickerings Road Widnes WA8 8XW

    Application for Hazardous Substances Consent at

    Received 17 Apr, published by the council 21 Jul 2026 Other
  • 23/00063/DEM Granted

    Low Wood Keckwick Lane Daresbury Warrington Cheshire WA4 4AB

    Prior notification of proposed demolition of bungalow at

    Received 15 Feb, published by the council 21 Jul 2026 Other
  • 23/00034/HBCDEM Granted

    Wigg Island Visitor Centre Wigg Island Runcorn WA7 1PJ

    Prior notification of proposed demolition of disused visitor centre at

    Received 15 Aug, published by the council 16 Sep 2026 Other