Planning application
25/00293/FULEIA
Runcorn Carbon Dioxide Spur Pipeline
Proposal
Proposed construction of a new carbon dioxide spur pipeline, an Above Ground Installation (AGI), plus ancillary works and equipment to serve Viridor Energy from Waste (EfW) Facility Carbon Capture Plant at
As published by the council, reference 25/00293/FULEIA
Timeline
Dates from the published record
-
4 Jul 2025
Received by Halton
-
8 Jul 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Halton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
25/02108/FUL Awaiting decision
Land At Cross Lane Frodsham
Construction of a new Carbon Dioxide Spur Pipeline and Above Ground Installation (AGI) and ancillary equipment to serve the Viridor Energy from Waste (Efw) Facility Carbon Capture Plant
Other other applications
In Halton
-
26/00122/DEM Withdrawn
Colin Myers Timber And Sawmill Hale Road Widnes Cheshire WA8 8PX
Prior notification of proposed demolition of existing traditional construction (brick / blockwork) single-storey building and part demolition of existing portal frame building at
-
26/00118/HBCDEM Granted
Golden Triangle Industrial Estate Harrison Street Widnes Cheshire WA8 8TN
Prior notification of proposed demolition of buildings at
-
26/00205/DEM Awaiting decision
Halton Borough Council Municipal Building Kingsway Widnes Cheshire WA8 7QF
Prior notification of proposed demolition of seven storey office building (Use Class E) and single storey electrical substation at
-
26/00135/HSC Awaiting decision
Univar Solutions Limited Hale Road Industrial Estate Pickerings Road Widnes WA8 8XW
Application for Hazardous Substances Consent at
-
23/00063/DEM Granted
Low Wood Keckwick Lane Daresbury Warrington Cheshire WA4 4AB
Prior notification of proposed demolition of bungalow at