Planning application
Land To The East Of Gilston Farm Gilston Crescent Polmont
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Approval of Matters Specified in Condition 1A, 1D-K, 1S, 1U-X, 1AA, 1EE-FF, 3 6 and 13 Relating to Construction of Southern Spine Road and 79 Dwellinghouses (Levels, Siting, Design, External Appearance, Access & Street Layout, Landscaping, Open Space/Play, Pedestrian & Cycle Facilities, Boundary Treatments, Ecology Enhancements, Drainage & Flooding, Noise Mitigation, Residential Travel Pack, Parking Inc. EV Charging, Waste Collection & Storage) of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC.
As published by the council, reference P/26/0093/MSC
Application record
- Reference
- P/26/0093/MSC
- Type
- Matters Specified in Conditions
- Status
- Awaiting decision
- Received
- 26 Feb 2026
- Validated
- 2 Mar 2026
- Ward
- Lower Braes
- Parish
- Polmont
- Decision by
- under Delegated Powers
Site history
Applications at this address on the Falkirk register
This site has had 9 applications since 2024: 3 approved, 0 refused.
-
P/24/0374/NMV03 Awaiting decision
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendent to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
-
P/25/0247/COND01 Awaiting decision
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Conditions 3 and 4 of P/25/0247/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 147 Dwellinghouses and 8 Flats of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC
-
P/24/0374/NMV02 Withdrawn
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
-
P/24/0374/NMV01 Withdrawn
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
-
P/25/0472/MSC Granted
Land To The East Of Gilston Farm Gilston Crescent Polmont
Approval of Matters Specified in Condition 1(m) of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC Relating to Provision of Public Art (Retrospective)
-
P/24/0226/COND02 Granted
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Condition 4 of P/24/0226/MSC - Approval of Matters Specified in Conditions 1C, 1H, 1N, 1O-Q, 1U-W, 1Z, 2C-D, 13, 14, 15 and 20 (Site Wide Earthworks, Burn Restoration, Access, Demolition and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP
-
P/24/0374/COND01 Awaiting decision
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Condition 3 of P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
-
P/24/0307/MSC Granted
Land To The East Of Gilston Farm Gilston Crescent Polmont
Approval of Matters Specified in Conditions 1A,1I-L, 1R-T, 1BB, 1DD, 2A, 2B, 3, 6, 8 and 17 (Open Space, Landscaping, Play, Ecology / Biodiversity / Burn Corridor Enhancements, Access and Active Travel, Site Wide Energy Strategy, Art Strategy and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP
Timeline
Dates from the published record
-
26 Feb 2026
Received by Falkirk
-
2 Mar 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Falkirk took a median of 58 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Cala Homes (West Scotland) Ltd Applicant, a developer
7 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
38 documents on file for this application
Drawings (30)
- Site layout masterplan
- Detailed planning layout
- Sheet alternative layout review
- Sheet alternative layout review
- Construction details
- Plot levels sheet pod
- Plot levels sheet pod
- Drainage layout
- Drainage layout
- Drainage profiles sheet
- Drainage profiles sheet
- Drainage layout
- Route of build and phasing plan
- Dms plan draft
- External finishes
- Ev charging provision
- Bin storage and collection
- Driveway dimensions
- Composite cleland
- Composite crichton
- Composite darroch
- Composite evan
- Composite garvie
- Composite kennedy
- Composite lewis
- Composite logan
- Composite melville fe
- Composite melville se
- Composite moncrief
- Location plan
Everything on file (38)
- Location plan
- Plot levels - sheet 1 alternative layout review
- Plot levels - sheet 2 alternative layout review
- Construction details
- Plot levels - sheet 1 (pod 7)
- Plot levels - sheet 2 (pod 7)
- Drainage layout - sheet 1 alternative layout review
- Drainage layout - sheet 2 alternative layout review
- Drainage profiles - sheet 1
- Drainage profiles - sheet 2
- Manhole schedule
- Drainage layout
- Travel pack
- Travel pack
- Site layout masterplan
- Route of build and phasing plan
- Dms plan (draft)
- Detailed planning layout
- External finishes
- Ev charging provision
- Bin storage and collection
- Ecology features
- Driveway dimensions
- Composite - cleland
- Composite - crichton
- Composite - darroch
- Composite - evan
- Composite - garvie
- Composite - kennedy
- Composite - lewis
- Composite - logan
- Composite - melville fe
- Composite - melville se
- Composite - moncrief
- Non-householder application
- Development framework assessment
- Planning statement
- Planning statement
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with Falkirk for determination, against a statutory target of eight weeks. Over the last year Falkirk decided condition discharge and variation applications in a median of 58 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To The East Of Gilston Farm Gilston Crescent Polmont
Approval of Matters Specified in Conditions 1A,1I-L, 1R-T, 1BB, 1DD, 2A, 2B, 3, 6, 8 and 17 (Open Space, Landscaping, Play, Ecology / Biodiversity / Burn Corridor Enhancements, Access and Active Travel, Site Wide Energy Strategy, Art Strategy and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP
Granted Conditions 58 docs -
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Condition 4 of P/24/0226/MSC - Approval of Matters Specified in Conditions 1C, 1H, 1N, 1O-Q, 1U-W, 1Z, 2C-D, 13, 14, 15 and 20 (Site Wide Earthworks, Burn Restoration, Access, Demolition and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP
Granted Conditions Demolition 1 doc -
Land To The East Of Gilston Farm Gilston Crescent Polmont
100% historically approved · decision due ~28 Aug
Compliance with Conditions 3 and 4 of P/25/0247/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 147 Dwellinghouses and 8 Flats of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC
Awaiting decision Conditions New dwellingMajor scheme -
Gilston Park Polmont Falkirk
Erection of Office Accommodation, Distribution Warehouse, Hotel, Restaurants, Petrol Filling Station, Community Retail Centre, Car Showroom Area, Garden Centre and 175 Housing Units
Refused Outline -
Land To The East Of Gilston Farm Gilston Crescent Polmont
Approval of Matters Specified in Condition 1(m) of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC Relating to Provision of Public Art (Retrospective)
-
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
Withdrawn ConditionsMajor scheme
Other condition discharge and variation applications
In Falkirk
-
P/25/0085/COND02 Granted
The Carron Centre Ronades Road Falkirk FK2 7TA
Compliance with Conditions of P/25/0085/FUL - Construction of 78 Dwellings with Associated Landscaping, Access and Infrastructure
-
P/25/0496/COND01 Granted
Cemetery & Crematorium Services Dorrator Road Falkirk FK2 7YJ
Compliance with Conditions of P/25/0496/FUL - Extension and Alterations to Crematorium
-
P/22/0367/NMV01 Granted
Dunipace Juniors Football Ground Town House Street Denny
Amendments to P/22/0367/FUL - Construction of Changing and Club Facilities
-
P/24/0256/NMV01 Decided
Old Airngath Riding Stables Bo'ness Linlithgow EH49 7RH
Amendment to P/24/0256/FUL - Alteration and Extension to Dwellinghouse, Including Alteration and Change of Use of Steading Buildings to Form Extension to Dwellinghouse, Construction of Outbuilding, Driveway and Associated Development
-
P/25/0078/COND01 Awaiting decision
Dawson Centre Davids Loan Falkirk FK2 7RG
Compliance with Conditions of P/25/0078/FUL - Change of Use of Open Space, Alterations to Modular Building and Construction of Fencing