Planning application

Land To The East Of Gilston Farm Gilston Crescent Polmont

Granted Falkirk P/25/0472/MSC Matters Specified in Conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Approval of Matters Specified in Condition 1(m) of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC Relating to Provision of Public Art (Retrospective)

As published by the council, reference P/25/0472/MSC

Application record

Reference
P/25/0472/MSC
Type
Matters Specified in Conditions
Status
Decided
Decision
Approval of Matters Specified in Conditi
Received
28 Oct 2025
Validated
7 Nov 2025
Decided
6 Mar 2026
Ward
Lower Braes
Parish
Polmont
Decision by
under Delegated Powers

Site history

Applications at this address on the Falkirk register

This site has had 8 applications since 2024: 3 approved, 0 refused.

  • P/25/0247/COND01 Awaiting decision

    Land To The East Of Gilston Farm Gilston Crescent Polmont

    Compliance with Conditions 3 and 4 of P/25/0247/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 147 Dwellinghouses and 8 Flats of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC

    Submitted 23 Jun 2026 Conditions
  • P/24/0374/NMV02 Withdrawn

    Land To The East Of Gilston Farm Gilston Crescent Polmont

    Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP

    Decided 18 Jun 2026 Conditions
  • P/26/0093/MSC Awaiting decision

    Land To The East Of Gilston Farm Gilston Crescent Polmont

    Approval of Matters Specified in Condition 1A, 1D-K, 1S, 1U-X, 1AA, 1EE-FF, 3 6 and 13 Relating to Construction of Southern Spine Road and 79 Dwellinghouses (Levels, Siting, Design, External Appearance, Access & Street Layout, Landscaping, Open Space/Play, Pedestrian & Cycle Facilities, Boundary Treatments, Ecology Enhancements, Drainage & Flooding, Noise Mitigation, Residential Travel Pack, Parking Inc. EV Charging, Waste Collection & Storage) of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC.

    Submitted 26 Feb 2026 Conditions
  • P/24/0374/NMV01 Withdrawn

    Land To The East Of Gilston Farm Gilston Crescent Polmont

    Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP

    Decided 28 Apr 2026 Conditions
  • Land To The East Of Gilston Farm Gilston Crescent Polmont

    Compliance with Condition 4 of P/24/0226/MSC - Approval of Matters Specified in Conditions 1C, 1H, 1N, 1O-Q, 1U-W, 1Z, 2C-D, 13, 14, 15 and 20 (Site Wide Earthworks, Burn Restoration, Access, Demolition and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP

    Decided 8 Oct 2025 Conditions
  • P/24/0374/COND01 Awaiting decision

    Land To The East Of Gilston Farm Gilston Crescent Polmont

    Compliance with Condition 3 of P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP

    Submitted 16 Apr 2025 Conditions
  • P/24/0307/MSC Granted

    Land To The East Of Gilston Farm Gilston Crescent Polmont

    Approval of Matters Specified in Conditions 1A,1I-L, 1R-T, 1BB, 1DD, 2A, 2B, 3, 6, 8 and 17 (Open Space, Landscaping, Play, Ecology / Biodiversity / Burn Corridor Enhancements, Access and Active Travel, Site Wide Energy Strategy, Art Strategy and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP

    Decided 3 Dec 2024 Conditions

Timeline

Dates from the published record

  1. 28 Oct 2025

    Received by Falkirk

  2. 7 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 6 Mar 2026

    Decision issued: Approval of Matters Specified in Conditi

  4. 27 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Cala Homes (West Scotland) Ltd Applicant, a developer

7 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • Decision notice Decision Notice · 06 Mar 2026
  • Public art strategy Supporting documents · 12 Feb 2026
  • (approved 02) location plan Drawing · 03 Nov 2025
  • (approved 01) artwork proposal Drawing · 28 Oct 2025
  • Non-householder application Application Form · 28 Oct 2025
  • Sculpture design statement Supporting documents · 28 Oct 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Falkirk granted permission on 6 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land To The East Of Gilston Farm Gilston Crescent Polmont

    P/24/0374/NMV02 Submitted 11 May 2026 48m away

    Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP

    Withdrawn Conditions
    Major scheme
  • Land To The East Of Gilston Farm Gilston Crescent Polmont

    P/24/0374/NMV01 Submitted 28 Jan 2026 48m away

    Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP

    Withdrawn Conditions
    Major scheme
  • Land To The East Of Gilston Farm Gilston Crescent Polmont

    P/24/0374/COND01 Submitted 16 Apr 2025 52m away

    100% historically approved · decision due ~11 Jun

    Compliance with Condition 3 of P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP

    Awaiting decision Conditions
    Major scheme
  • Land To The East Of Gilston Farm Gilston Crescent Polmont

    P/25/0247/COND01 Submitted 23 Jun 2026 241m away

    100% historically approved · decision due ~28 Aug

    Compliance with Conditions 3 and 4 of P/25/0247/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 147 Dwellinghouses and 8 Flats of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC

    Awaiting decision Conditions New dwelling
    Major scheme
  • Land To The East Of Gilston Farm Gilston Crescent Polmont

    P/24/0307/MSC Submitted 18 Jun 2024 250m away

    Approval of Matters Specified in Conditions 1A,1I-L, 1R-T, 1BB, 1DD, 2A, 2B, 3, 6, 8 and 17 (Open Space, Landscaping, Play, Ecology / Biodiversity / Burn Corridor Enhancements, Access and Active Travel, Site Wide Energy Strategy, Art Strategy and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP

    Granted Conditions 58 docs
  • Land To The East Of Gilston Farm Gilston Crescent Polmont

    P/24/0226/COND02 Submitted 15 Sep 2025 250m away

    Compliance with Condition 4 of P/24/0226/MSC - Approval of Matters Specified in Conditions 1C, 1H, 1N, 1O-Q, 1U-W, 1Z, 2C-D, 13, 14, 15 and 20 (Site Wide Earthworks, Burn Restoration, Access, Demolition and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP

    Granted Conditions Demolition 1 doc

In Falkirk

  • Land To The South Of 1 - 9 Bridge Street Bridge Street Bonnybridge

    Compliance with Conditions 3, 4, 5, 6, 7, and 10 of P/22/0519/FUL - Construction of 6 Flatted Dwellings and Associated Car Parking

    18 Feb 2026 Conditions
  • P/21/0723/NMV01 Awaiting decision

    Site To The North Of 37 Rosebank Avenue Dunipace

    Amendment to P/21/0723/FUL - Construction of 87 Dwellinghouses and Associated Works

    3 Sep 2026 Conditions
  • P/25/0196/COND02 Awaiting decision

    The Comptons Stewart Avenue Bo'ness

    Construction of 3 Dwellinghouses and Associated Infrastructure (Amendment to P/24/0506/FUL)

    31 Aug 2026 Conditions
  • P/26/0110/MSC Granted

    Land To The South Of Bo'ness Fire Station Crawfield Road Bo'ness

    Residential Development with Associated Access, Parking, Landscaping, Open Space and Drainage

    6 Mar 2026 Conditions
  • P/25/0085/COND02 Awaiting decision

    The Carron Centre Ronades Road Falkirk FK2 7TA

    Compliance with Conditions of P/25/0085/FUL - Construction of 78 Dwellings with Associated Landscaping, Access and Infrastructure

    20 Aug 2026 Conditions