Planning application
Land To The East Of Gilston Farm Gilston Crescent Polmont
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Approval of Matters Specified in Conditions 1A,1I-L, 1R-T, 1BB, 1DD, 2A, 2B, 3, 6, 8 and 17 (Open Space, Landscaping, Play, Ecology / Biodiversity / Burn Corridor Enhancements, Access and Active Travel, Site Wide Energy Strategy, Art Strategy and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP
As published by the council, reference P/24/0307/MSC
Application record
- Reference
- P/24/0307/MSC
- Type
- Matters Specified in Conditions
- Status
- Decided
- Decision
- Approval of Matters Specified in Conditi
- Received
- 18 Jun 2024
- Validated
- 26 Jun 2024
- Decided
- 3 Dec 2024
- Ward
- Lower Braes
- Parish
- Polmont
- Decision by
- under Delegated Powers
Site history
Applications at this address on the Falkirk register
This site has had 8 applications since 2024: 2 approved, 0 refused.
-
P/25/0247/COND01 Awaiting decision
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Conditions 3 and 4 of P/25/0247/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 147 Dwellinghouses and 8 Flats of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC
-
P/24/0374/NMV02 Withdrawn
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
-
P/26/0093/MSC Awaiting decision
Land To The East Of Gilston Farm Gilston Crescent Polmont
Approval of Matters Specified in Condition 1A, 1D-K, 1S, 1U-X, 1AA, 1EE-FF, 3 6 and 13 Relating to Construction of Southern Spine Road and 79 Dwellinghouses (Levels, Siting, Design, External Appearance, Access & Street Layout, Landscaping, Open Space/Play, Pedestrian & Cycle Facilities, Boundary Treatments, Ecology Enhancements, Drainage & Flooding, Noise Mitigation, Residential Travel Pack, Parking Inc. EV Charging, Waste Collection & Storage) of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC.
-
P/24/0374/NMV01 Withdrawn
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
-
P/25/0472/MSC Granted
Land To The East Of Gilston Farm Gilston Crescent Polmont
Approval of Matters Specified in Condition 1(m) of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC Relating to Provision of Public Art (Retrospective)
-
P/24/0226/COND02 Decided
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Condition 4 of P/24/0226/MSC - Approval of Matters Specified in Conditions 1C, 1H, 1N, 1O-Q, 1U-W, 1Z, 2C-D, 13, 14, 15 and 20 (Site Wide Earthworks, Burn Restoration, Access, Demolition and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP
-
P/24/0374/COND01 Awaiting decision
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Condition 3 of P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
Timeline
Dates from the published record
-
18 Jun 2024
Received by Falkirk
-
26 Jun 2024
Validated
Checked as complete and ready for consideration.
-
3 Dec 2024
Decision issued: Approval of Matters Specified in Conditi
-
16 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Warrington
276 applications on PlanIndex · across 98 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
58 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Falkirk granted permission on 3 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To The East Of Gilston Farm Gilston Crescent Polmont
Compliance with Condition 4 of P/24/0226/MSC - Approval of Matters Specified in Conditions 1C, 1H, 1N, 1O-Q, 1U-W, 1Z, 2C-D, 13, 14, 15 and 20 (Site Wide Earthworks, Burn Restoration, Access, Demolition and Associated Enabling Works) of Planning Permission in Principle P/20/0493/PPP
Decided Conditions Demolition 1 doc -
Land To The East Of Gilston Farm Gilston Crescent Polmont
97% historically approved · decision due ~28 Aug
Compliance with Conditions 3 and 4 of P/25/0247/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 147 Dwellinghouses and 8 Flats of Planning Permission in Principle P/20/0493/PPP as Varied by P/25/0058/VRC
Awaiting decision Conditions New dwellingMajor scheme -
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
Withdrawn ConditionsMajor scheme -
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
Withdrawn ConditionsMajor scheme -
Land To The East Of Gilston Farm Gilston Crescent Polmont
97% historically approved · decision due ~11 Jun
Compliance with Condition 3 of P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
Awaiting decision ConditionsMajor scheme -
Site To The West Of The Lower Barn Gilston Farm Polmont
Alterations and Change of Use of Office (Class 4) to Dwellinghouse (Class 9)
Granted Full applications 19 docsDomestic
Other condition discharge and variation applications
In Falkirk
-
P/26/0110/MSC Granted
Land To The South Of Bo'ness Fire Station Crawfield Road Bo'ness
Residential Development with Associated Access, Parking, Landscaping, Open Space and Drainage
-
P/25/0085/COND02 Awaiting decision
The Carron Centre Ronades Road Falkirk FK2 7TA
Compliance with Conditions of P/25/0085/FUL - Construction of 78 Dwellings with Associated Landscaping, Access and Infrastructure
-
P/22/0367/COND02 Awaiting decision
Dunipace Juniors Football Ground Town House Street Denny
Amendments to P/22/0367/FUL - Construction of Changing and Club Facilities
-
P/22/0367/NMV01 Awaiting decision
Dunipace Juniors Football Ground Town House Street Denny
Amendments to P/22/0367/FUL - Construction of Changing and Club Facilities
-
P/26/0043/COND01 Decided
Larbert Village Primary School Main Street Larbert FK5 3AS
Compliance with Conditions of P/26/0043/FUL - Extension to Primary School