Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Leighdene Close Exeter Devon EX2 4PN

Granted Exeter 21/1101/NMA Non-Material Amendment

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material amendment to planning permission ref. 20/1589/FUL granted 23 March 2021 to reposition bi-fold doors to northerly gable and two windows from northerly to southerly gable with smaller changed to external door, reduce size of small kitchen and south-west elevation windows, replace glazed panel above front door with rendered wall, additional render instead of brickwork and minor fenestration changes to north-west elevation, omission of ramp, replace chimney stack with metal flue, omission of projecting brick piers and minor changes to external paved terraces and steps.

As published by the council, reference 21/1101/NMA

Application record

Reference
21/1101/NMA
Type
Non-Material Amendment
Status
Permitted
Decision
Permitted
Received
12 Jul 2021
Validated
12 Jul 2021
Decided
10 Sep 2021
Ward
Newtown And St Leonards
Decision by
Delegated Decision
Postcode
EX2 4PN

Timeline

Dates from the published record

  1. 12 Jul 2021

    Received by Exeter

  2. 10 Sep 2021

    Decision issued: Permitted

  3. 5 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Exeter

5 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • 6 Leighdene Close Exeter Devon EX2 4PN

    21/0791/NMA Submitted 12 May 2021 0m away

    Non-material amendment to planning application 20/1589/FUL granted 23 March 2021 to add additional areas of rendered finish, replace chimney stack with metal flue, omission of ramp, minor alterations to cill level of two windows, small increase in size of external paved area to rear of property.

    Granted Amendments Windows or glazing 13 docs
  • 7 Leighdene Close Exeter EX2 4PN

    24/0378/TPO Submitted 4 Apr 2024 39m away

    04/04/2024T1 - Beech Suggested Works: Prune eastern aspect by approximately 3 metres Rationale: Appropriate management of the tree to achieve more light into garden, having little impact on the tree?s physiological processes

    Granted Trees 6 docs
  • Latchetts Deepdene Park Exeter Devon EX2 4PH

    23/0235/CAT Submitted 22 Feb 2023 40m away

    There are two trees that need attention: Tree [1] is deciduous magnolia. Tree [2] is a laurel tree What we wish to do: Tree [1] is touching the roof of the house and needs cutting back. Dartmoor tree surgeons have suggested a 'partial crown reduction'. We are looking to remove branches which overhand the roof of the bungalow (the tree's south side of it's canopy) and bang into the roof. Tree [2] is encroaching on tree [1]'s space and is dominating it. We would like to cut a section of this back so that tree [1] has more space / light.

    Granted Trees 8 docs
  • 13 Leighdene Close Exeter EX2 4PN

    25/1709/TPO Submitted 1 Dec 2025 63m away

    T38 Norway maple - To carry out thinning works throughout the crown of the tree up to 20% by removing crossing , rubbing, duplicated and any significant deadwood. - To remove the lowest primary lateral branch growing towards the house which is aprox. 25cm in width. The reason for carrying out the works is allow more dappled light on the garden in summer.

    Granted Trees 4 docs
  • Linden Lodge Deepdene Park Exeter Devon EX2 4PH

    23/0101/FUL Submitted 25 Jan 2023 74m away

    Replace white single glazed Crittal windows in Georgian style with white Heritage Aluminium double glazed windows in Georgian style.

    Granted Full applications Windows or glazing 10 docs
  • 34 Matford Avenue Exeter EX2 4PL

    24/1450/TPO Submitted 6 Dec 2024 95m away

    T1 English Oak (TPO'd tree) The crown of this tree extends into two gardens, 34 Matford Avenue and the neighbouring property Lindon Lodge. The suggested specification of works affecting Lindon Lodge is:Lowest southern limb, arising at 6m above ground level (AGL) remove lowest secondary branch back to source on parent limb, diameter of cut 100mm; reduce remaining tertiaries by 1.5m, MDC 25mm. Next lowest limb on southern aspect, arising at 7m AGL remove lowest secondary branch back to source on parent limb, diameter of cut 100mm; remove lowest (of three) secondary branches, diameter of cut 75mm, prune remaining tertiaries by 2m, MDC 25mm. Next adjacent limb on southern aspect prune away from property to achieve a 3m clearance, MDC 50mm. The suggested spec of works for the 34 Matford Avenue Garden is Reduce western aspect by 2m, MDC 25mm Reduce southern aspect slightly to contain and reduce loadings on potentially newly exposed limbs by 1.5m, MDC 25mm. Specification across entire canopy Crown lift to 4m above ground level, MDC 25mm Remove major hazardous deadwood T2 - Pine (Conservation Area, no TPO) Prune eastern aspect to achieve a 3m clearance from property and reduce south eastern aspect by 2m, MDC 75mm Remove major hazardous deadwood, remove old brace and install new 4t Cobra bracing system Reason for works T1 - this mature Oak tree is now in contact with Linden Lodge, suggested pruning is necessary to achieve a suitable clearance. The canopy of the Oak tree is spreading westwards towards 34 Matford Avenue, intended light pruning is to contain. The southerly pruning is to reduce any loadings on any potentially newly exposed limbs. T2 - the Pine tree is spreading towards the frontage of the property, suggested pruning is to contain. All the above listed works are considered arboriculturally appropriate and will have minimal impact on the tree's physiological processes.

    Granted Trees 5 docs

In Exeter

  • 26/1114/NMA Granted

    1 Higher Riverdale Exe Street Topsham EX3 0JL

    Non-material amendments to Planning Permission Ref. 25/1413/FUL, granted 11 February 2026, relating to position of dwelling on site, new window on north-east elevation, splayed wall and internal layout reconfiguration on ground floor

    24 Jul 2026 Amendments
  • 26/1281/NMA Granted

    54 Queens Road Exeter EX2 9EP

    Non-material amendment to planning permission 25/1728/FUL to increase the depth of the approved single-storey rear extension by 300mm.

    25 Aug 2026 Amendments
  • 26/1204/NMA Granted

    Tithebarn Development Land Tithebarn Lane Exeter

    Non-material amendment to reserved matters approval 18/0789/RES to replace drawing number 17023 LS 02 P5 ('Landscape Strategy Plan') with drawing number 17023 LS 02 P11 ('Landscape Strategy Plan') and add drawing number 1429 0565 P3 ('Site Location Plan. Detailed Long-Section Through Culvert. Cross-Section Through Culvert. Headwall Detail.') to adjust routing of 'Base Earth Track'.

    10 Aug 2026 Amendments
  • 26/1228/VOC Awaiting decision

    The Harlequin Centre Paul Street Exeter EX4 3TT

    Development of two Co-Living (Sui Generis) accommodation blocks, following demolition of existing shopping centre and pedestrian bridge, change of use of upper floors of 21-22 Queen Street to Co-Living (Sui Generis), and all associated works including parking, landscaping, amenity areas, public realm improvements, new pedestrian bridge and provision of heritage interpretation kiosk. (Variation of condition 2 of planning permission 21/1104/FUL to supersede the approved plans with new plans showing a revised mix of accommodation, internal layout changes, minor external layout changes, omission of new pedestrian bridge, and revised energy strategy with corresponding changes to roof plans and plant, and removal of condition 19.)

    13 Aug 2026 Amendments
  • 26/1219/VOC Awaiting decision

    Land Opposite 51 Ribston Avenue Exeter

    The construction of a 54-bed independent hospital (Use Class C2) with access, car parking, landscaping/open space and associated works. (Variation of condition 2 of planning permission 18/0873/FUL to supersede the approved plans with new plans showing minor amendments to the site plan, floor plans, roof plan and elevations, and variation of condition 7 to change the drawing number to 001029-SHACK-V1-00-DR-A-1001_Proposed Site Plan_B.)

    12 Aug 2026 Amendments