Planning application
Land South Of 20 Cowley Bridge Road Exeter
Relates to 23/0232/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-material amendment to planning permission 23/0232/FUL to add a new condition stating the development can be carried out in two phases with substation in phase 1 and rest of development in phase 2.
As published by the council, reference 26/1708/NMA
Application record
- Reference
- 26/1708/NMA
- Type
- Non-Material Amendment
- Status
- Pending Consideration
- Received
- 11 Nov 2026
- Validated
- 11 Nov 2026
- Ward
- Duryard And St James
Timeline
Dates from the published record
-
11 Nov 2026
Received by Exeter
-
17 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Exeter took a median of 54 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
23/0232/FUL Granted
Apparelmaster Cowley Bridge Road Exeter Devon EX4 5AD
Construction of new buildings for purpose built student accommodation (Sui Generis use) with associated landscaping, servicing and infrastructure works (Revised Plans).
Who's behind it
Company information only, from the register and Companies House
Studio S2 Architects Ltd Agent, an architecture practice registered in Huddersfield
Active · incorporated 2025 · Huddersfield
3 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Exeter for determination, against a statutory target of eight weeks. Over the last year Exeter decided amendment applications in a median of 32 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Former Johnsons Laundry Site Cowley Bridge Road Exeter EX4 5AD
Non-material amendment to planning permission 23/0232/FUL to carry out internal and external design changes including a reduction in student bedspaces from 350 to 344, change mix of studio and cluster beds, adjustments to roof level to increase PV panels, increase in height of block C, centralising plant in block D, and alterations to facades.
Granted Amendments 37 docs -
Former Johnsons Laundry Site Cowley Bridge Road Exeter
Discharge Conditions 5 (Ecological Management Plan), and 8 (Acoustic Design Statement) of Planning Permission 23/0232/FUL.
Granted Conditions 6 docs -
Apparelmaster Cowley Bridge Road Exeter Devon EX4 5AD
Construction of new buildings for purpose built student accommodation (Sui Generis use) with associated landscaping, servicing and infrastructure works (Revised Plans).
Granted Full applications 155 docs -
Thomas Hall Cowley Bridge Road Exeter Devon EX4 5AD
Holly (T1) - Fell, dead. Scotts Pine (T2) - Rotted lower stem, fell to safe height - Corsican Pine (T3) - Crown decline, suspect red band needle blight. Fell to safe height - Eucalypytus (T5) - Decayed lower stem. Fell to safe height.
Granted Trees 4 docs -
Apparelmaster Cowley Bridge Road Exeter Devon EX4 5AD
Discharge of Condition 4 - Construction Method Environmental Management Plan (CEMP) of Planning Permission 23/0232/FUL.
Granted Conditions 4 docs -
Apparelmaster Cowley Bridge Road Exeter Devon EX4 5AD
96% historically approved · decision due ~29 Jul
Discharge Conditions 3 (BREEAM), 6 (Ground Investigation & Remediation), 7 (Drainage), and 9 (Waste Audit) of Planning Permission 23/0232/FUL.
Awaiting decision Conditions 31 docs
Other amendment applications
In Exeter
-
26/1423/VOC Refused
66 Blenheim Road Exeter EX2 8SE
Variation of condition 2 of 26/0978/FUL (Date of Decision: 04/09/2026) which had granted permission for Single-storey rear extension with flat roof, rooflights, and rear bifold doors. The variation seeks to increase the extension depth from 4.5 metres to 5.5 metres and to include a parapet surround.
-
26/1677/NMA Awaiting decision
Land To The North Of Topsham Road Exeter
Non-material amendment to reserved matters approval 23/1237/RES to amend external finishing materials and corbel details.
-
26/1678/NMA Awaiting decision
25 Nicholas Road Exeter EX1 3AT
Non material amendment to planning permission 20/0024/FUL for changes to the proposed roof shape; installation of rooflights; changes to windows; changes to the front porch.
-
26/1673/NMA Awaiting decision
3 School Lane Exeter EX2 6LA
Non-material amendment to planning application 19/1704/FUL (Single-storey rear and front extensions, internal and external alterations and new porch) - reduced extent of rear extension and amendment to external finish to proposed elevations.
-
26/1666/NMA Awaiting decision
38 Elm Grove Road Topsham Exeter EX3 0EJ
Non-material amendment to application 25/1630/FUL to increase in the extent of previously approved render in place of facing brickwork, together with the introduction of natural stone facing to the ground-floor gable and inclusion of one Air Source Heat Pump and 18 Photovoltaic panels.