Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To North Of Railway Line Henley Road Ipswich Suffolk

Awaiting decision East Suffolk DC/26/3903/CON Other Consultation

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Consultion - Section 73 application for the variation of condition 39 (Henley Road, Dale Hall Road and Valley Road Junction Improvements) of Outline Planning Permission IP/16/00608/OUTFL (mixed use development comprising up to 1100 residential dwellings, a local centre, primary school, sports facilities, country park including visitor centre, open space, vehicular accesses, and associated infrastructure and engineering works) to amend the occupation trigger for when works need to be completed. An Environmental Statement was submitted with the Outline Permission IP/16/00608/OUT under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).

As published by the council, reference DC/26/3903/CON

Application record

Reference
DC/26/3903/CON
Type
Other Consultation
Status
Awaiting decision
Received
5 Nov 2026
Validated
5 Nov 2026
Ward
Carlford And Fynn Valley
Parish
Westerfield

Site history

Applications at this address on the East Suffolk register

This site has had 15 applications since 2025: 6 approved, 0 refused.

  • DC/26/3868/CON Awaiting decision

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Application to part discharge Condition 20 (Construction and Environmental Management Plan) and condition 26 (Arboricultural Method Statement) of Outline Planning Permission IP/16/00608/OUT in relation to Phase 4b (Part of Phase 5 of the approved Phasing Strategy under IP/23/00904/CON).

    Submitted 3 Nov 2026 Outline
  • DC/26/3519/CON Awaiting decision

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consulation - Discharge of condition 26 (Arboricultural Method Statement- southern access junction) of Outline Planning Permission IP/16/00608/OUT.

    Submitted 7 Oct 2026 Outline
  • DC/26/3059/CON Granted

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Variation of Condition 1 (approved details) of Reserved Matters Application 23/00406/REM (Submission of Reserved Matters (appearance, layout, landscaping and scale) for Phase 3a comprising 96 dwellings, a local centre, parking, landscaping, earthworks and associated works; in relation to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).) Changes are proposed to allow 8no. shared ownership apartments to be delivered as affordable rent and to align drawings with previously approved non-material amendment applications.

    Decided 17 Sep 2026 Outline
  • DC/26/2959/CON Granted

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for Phase 4a (Part of Phase 5 and 6 of the approved Phasing Strategy), and revised details for part of Country Park Phase 6 and Phase 7 (to accommodate changes to the paths), of the development at Henley Gate comprising roads, shared cycle and pedestrian path, open space, landscaping, drainage, pumping station and other associated infrastructure works pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, landscaping, infrastructure and engineering works, and 2 no. access points from Henley Road and provision of access points for pedestrian/cycle bridge and vehicular bridge over railway. The Application also seeks to part discharge Condition 26 (Arboricultural Method Statement) of IP/16/00608/OUT in relation to Phase 4a. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended) (Revised Description).

    Decided 17 Sep 2026 Outline
  • DC/26/2832/CON Granted

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).

    Decided 9 Sep 2026 Outline
  • DC/26/2157/CON Decided

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Application to part discharge Condition 20 (Construction and Environmental Management Plan - Primary School Phase Compliance Statement) of Outline Planning Permission IP/16/00608/OUT

    Decided 16 Jul 2026 Outline
  • DC/26/1760/CON Awaiting decision

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Application to Part Discharge Condition 11 (Visitor Centre Permanent Access Road and Infrastructure) (Phase 4a) of outline planning permission IP/16/00608/OUT.

    Submitted 12 May 2026 Outline
  • DC/26/1713/CON Awaiting decision

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works.

    Submitted 7 May 2026 Outline
  • DC/26/1370/CON Granted

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Discharge of Condition 9 (Phasing Strategy) of planning permission IP/16/00608/OUT.

    Decided 1 May 2026 Outline
  • DC/26/1361/CON Awaiting decision

    Land To North Of Railway Line Henley Road Ipswich Suffolk

    Consultation - Application to part discharge condition 11 (Phase Design Code) for Phase 4b (part of Phase 5 of the approved Phasing Strategy) of Outline Planning Permission IP/16/00608/OUT

    Submitted 13 Apr 2026 Outline

Timeline

Dates from the published record

  1. 5 Nov 2026

    Received by East Suffolk

  2. 20 Nov 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 31 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 54 days over the applications it decided in the last year.

Documents

1 document on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided outline applications in a median of 18 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In East Suffolk

  • DC/26/3767/CCC Granted

    East Anglia TWO Offshore Wind Farm Development Consent Order Port Of Lowestoft Commercial Road Lowestoft Suffolk NR32 2TE

    Suffolk County Council Consultation - Discharge of Requirement 36(1) (Port Traffic, Lowestoft Port Construction Traffic Management Plan Scoping) in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm Development Consent Order.

    Received 26 Oct, published by the council 20 Nov 2026 Outline
  • DC/26/4001/EE Awaiting decision

    Akenfrith (Fullers) Hoo Green Hoo Suffolk IP13 7QT

    Electric Company Consultation - Install stay wire, install LV underground cable, upgrade span to 4x95ABC and upgrade span to 4x95ABC

    Received 12 Nov, published by the council 20 Nov 2026 Outline
  • DC/26/3679/CON Granted

    James Paget University Hospital Lowestoft Road Gorleston Norfolk NR31 6LA

    Other Consultation - 06/25/1043/O - 1) Full planning permission: minor amendment to multi storey car park to facilitate internal layout changes including minor reduction in height; change to alignment of northwest most access to Woodfarm Lane; associated minor changes to the landscaping and drainage basin; (1) and (2) Full and Outline planning permission: submission of updated Supporting Drawings and Reports

    Received 20 Oct, published by the council 20 Nov 2026 Outline
  • DC/26/3813/CON Granted

    Opposite Of 19 St Johns Road Bungay Suffolk NR35 1DH

    Consultation - Install Fixed Line Broadband Apparatus

    Received 29 Oct, published by the council 20 Nov 2026 Outline
  • DC/26/3891/CON Awaiting decision

    Proposed Broadband Apparatus The Street Pettistree Suffolk IP13 0HP

    Consultation - Installation of 8m wooden pole

    Received 4 Nov, published by the council 20 Nov 2026 Outline