Awaiting decision East Suffolk DC/25/3595/CON Other Consultation

Relates to DC/25/3535/CLP

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.

As published by the council, reference DC/25/3595/CON

Application record

Reference
DC/25/3595/CON
Type
Other Consultation
Status
Awaiting decision
Received
18 Sep 2025
Validated
1 Oct 2025
Ward
Wrentham, Wangford And Westleton
Parish
Benacre

Site history

Applications at this address on the East Suffolk register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • DC/25/3595/R77 Granted

    Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.

    Decided 1 Dec 2025
  • DC/25/3535/CLP Granted

    Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel The decommissioning of the existing pumping station and relocation of rock armour.

    Decided 24 Nov 2025 Lawful development

Timeline

Dates from the published record

  1. 18 Sep 2025

    Received by East Suffolk

  2. 1 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 54 days over the applications it decided in the last year.

Cases linked to this one on the register

  • DC/25/3535/CLP Granted

    Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel The decommissioning of the existing pumping station and relocation of rock armour.

    Decided 24 Nov 2025 Lawful development

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided outline applications in a median of 17 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    DC/25/3595/R77 Submitted 18 Sep 2025 0m away

    Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.

    Granted 6 docs
  • Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    DC/25/3535/CLP Submitted 16 Sep 2025 0m away

    Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel The decommissioning of the existing pumping station and relocation of rock armour.

    Granted Lawful development 10 docs
  • Land At Benacre Suffolk

    DC/25/2766/EE Submitted 11 Jul 2025 424m away

    Electricity Company Consultation - Proposed GRP Substation site

    Granted Outline 6 docs

In East Suffolk

  • DC/26/2769/EIA Decided

    Land Off Ringsfield Road Beccles Suffolk

    EIA Screening Opinion - Residential development of up to 270 dwellings, together with public open space, suitable alternative natural greenspace (SANG) and associated infrastructure.

    5 Aug 2026 Outline
  • DC/26/2834/CON Granted

    Land To South Of Railway Line Westerfield Road Ipswich Suffolk

    Consultation - Part discharge of condition 28 of outline planning permission IP/14/00638/OUTFL in relation to the Community Development Strategy and the full details of projects and measures for the pre-occupancy and early occupancy phase.

    10 Aug 2026 Outline
  • DC/26/3025/CON Awaiting decision

    The Crown Hotel Market Hill Framlingham Woodbridge Suffolk IP13 9AP

    Consultation - Renewal of pavement licence for 4 tables each with 3 chairs at the front of the premises, covering an area of left of the door (when facing premises) 11m in length & 1.5m wide and right of the door 8m in length & 1.5m wide. Between the hours of 07:30-23:00 Monday to Saturday and 8:00 to 18:00 Sunday.

    26 Aug 2026 Outline
  • DC/26/3031/CON Awaiting decision

    79 Hamilton Road Felixstowe Suffolk IP11 7BE

    Consultation - Renewal of pavement licence: 6 tables and 12 chairs Area in front of premises - 6m x 3.4m Tables 1 to 4 (located on pavement) - Monday to Sunday 08:00 to 16:00 Tables 5 and 6 (located on Hamilton Road) - Monday to Sunday 10:00 to 16:00

    26 Aug 2026 Outline
  • DC/26/2758/CON Granted

    Garland Park Garland Park Avenue Rendlesham Woodbridge Suffolk

    Consultation - Variation to Advanced Water Infrastructure Networks Limited, to allow it to supply Water and Sewerage services to a site called Garland Park, Woodbridge.

    4 Aug 2026 Outline