Planning application

Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

Granted East Suffolk DC/25/3595/R77 Regulation 77

Relates to DC/25/3535/CLP

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.

As published by the council, reference DC/25/3595/R77

Application record

Reference
DC/25/3595/R77
Type
Regulation 77
Status
Permitted
Decision
Application Permitted
Received
18 Sep 2025
Validated
1 Oct 2025
Decided
1 Dec 2025
Ward
Wrentham, Wangford And Westleton
Parish
Benacre
Decision by
Delegated Decision

Site history

Applications at this address on the East Suffolk register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • DC/25/3595/CON Awaiting decision

    Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.

    Submitted 18 Sep 2025 Outline
  • DC/25/3535/CLP Granted

    Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel The decommissioning of the existing pumping station and relocation of rock armour.

    Decided 24 Nov 2025 Lawful development

Timeline

Dates from the published record

  1. 18 Sep 2025

    Received by East Suffolk

  2. 1 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 1 Dec 2025

    Decision issued: Application Permitted

  4. 9 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • DC/25/3535/CLP Granted

    Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel The decommissioning of the existing pumping station and relocation of rock armour.

    Decided 24 Nov 2025 Lawful development

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Suffolk granted permission on 1 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on East Suffolk's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    DC/25/3595/CON Submitted 18 Sep 2025 0m away

    98% historically approved · decision due ~26 Nov

    Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.

    Awaiting decision Outline 2 docs
  • Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk

    DC/25/3535/CLP Submitted 16 Sep 2025 0m away

    Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel The decommissioning of the existing pumping station and relocation of rock armour.

    Granted Lawful development 10 docs
  • Land At Benacre Suffolk

    DC/25/2766/EE Submitted 11 Jul 2025 424m away

    Electricity Company Consultation - Proposed GRP Substation site

    Granted Outline 6 docs