Planning application
Land At Benacre Suffolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Electricity Company Consultation - Proposed GRP Substation site
As published by the council, reference DC/25/2766/EE
Application record
- Reference
- DC/25/2766/EE
- Type
- Electricity Company Consultation
- Status
- Responded
- Decision
- Granted As published: No Objections
- Received
- 11 Jul 2025
- Validated
- 20 Oct 2025
- Decided
- 18 Nov 2025
- Ward
- Wrentham, Wangford And Westleton
- Parish
- Benacre
Timeline
Dates from the published record
-
11 Jul 2025
Received by East Suffolk
-
20 Oct 2025
Validated
Checked as complete and ready for consideration.
-
18 Nov 2025
Decision issued: No Objections
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 18 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Kessingland Beach Holiday Village Beach Road Kessingland Lowestoft Suffolk NR33 7RW
Formation of all new external seating / dining area within existing courtyard area. Works to include the installation of x1 No. all new containerised catering unit with associated bin store, replacement of existing grassed areas with all new resin paving, installation of all new Festoon lighting and installation of all new building cladding to the southern elevation of an existing poolside building.
Granted Full applications 17 docs -
Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk
98% historically approved · decision due ~26 Nov
Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.
Awaiting decision Outline 2 docs -
Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk
Application under S77 of the Conservation of Habitats and Species Regulations 2017 in relation to works proposed within DC/25/3535/CLP - Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel. The decommissioning of the existing pumping station and relocation of rock armour.
Granted 6 docs -
Land To The West Of Benacre Pumping Station South Of Kessingland The Street Benacre Suffolk
Certificate of Lawful Use (Proposed) - The construction of a new flood embankment across the Lothingland valley to manage tidal flooding at the A12 and manage flood risk to property upstream. A new pumping station will be constructed through the new Lothingland embankment to manage fluvial flooding. The construction of a new Kessingland embankment with a new small pumping station to manage surface water flooding. The construction of a new intertidal channel The decommissioning of the existing pumping station and relocation of rock armour.
Granted Lawful development 10 docs
Other outline applications
In East Suffolk
-
DC/26/3004/CCC Granted
A12 Between Junctions 58 (Seven Hills) And Woods Lane Roundabout Woodbridge Suffolk
County Council Consultation - Transport improvements to the A12 from Junction 58 (Seven Hills, Ipswich) to Woods Lane Roundabout, Woodbridge including the upgrade from a single carriageway to dual carriageway between A12 / B1438 and the A12 / B1078, Construction of a new pedestrian bridge and other highways and pedestrian improvements.
-
DC/26/3240/PDN Granted
Proposed Substation Adjacent Broombank Saxmundham Road Aldeburgh Suffolk
Installation of a substation within a land plot of 3m x 3m located near Saxmudham Road, Aldeburgh
-
DC/26/3256/CON Granted
Bank And Premises Exchange Square Beccles Suffolk NR34 9HH
Consultation - New Pavement Licence for Pascolo Lounge, Beccles 4 tables and 8 chairs Front of the premises: left-hand side 1.6m x 3.5m, right-hand side 1.6m x 2.5m Monday to Sunday 08:00 to 23:00
-
DC/26/3255/CON Granted
YouDrink Bottleshop & Taproom 4 Thoroughfare Halesworth Suffolk IP19 8AH
Consultation - RENEWAL of pavement licence - 2 tables 4 chairs, Area infront of the premises - 5.2m x 2.5m, Monday to Sunday 09:00 until 23:00
-
DC/26/3431/CON Awaiting decision
Black Barn Farm Monewden Road Charsfield Woodbridge Suffolk IP13 7QE
Consultation - To install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Cornerstone.