Planning application
Perivale Underhill Lympstone Exmouth EX8 5HH
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Notification of intent to demolish the current rear extension and erect a single storey rear extension which would extend beyond the rear wall of the original house by 8m, for which the maximum height would be 3.3m and for which the height of the eaves would be 2.6m
As published by the council, reference 26/2014/GPD
Application record
- Reference
- 26/2014/GPD
- Type
- Prior Notification - Extensions
- Status
- Awaiting decision
- Received
- 2 Oct 2026
- Validated
- 2 Oct 2026
- Ward
- Woodbury And Lympstone
- Parish
- Lympstone
- Postcode
- EX8 5HH
Comment by 29 October 2026
The council is taking comments on this application until then. Have your say on East Devon's portal.
Timeline
Dates from the published record
-
2 Oct 2026
Received by East Devon
-
9 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 43 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Archipro Design Agent, a design practice
21 applications on PlanIndex · across 2 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordWhat happens while it is decided
This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided prior approval applications in a median of 55 days. More in our guide to how long planning decisions take.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Alfayda Underhill Lympstone Devon EX8 5HH
Proposed demolition of garage on west elevation and conservatory on North elevation. Construction of single storey rear extension, retaining wall and patio on North Elevation, two-storey extension on western elevation, stone porch on South Elevation and changes to fenestration.
Granted Full applications Extension Demolition +1 18 docsSmall domestic -
Alfayda Underhill Lympstone Exmouth EX8 5HH
96% historically approved · decision due ~25 May
Application Reference Number: 25/1848/FUL Date of Decision: 22/10/2025 Condition Number(s): 2 Conditions(s) Removal: We wish to reduce the size of the development in order to reduce the cost of the works We wish to remove the side extension.
Awaiting decision Amendments Extension 10 docs -
10 Underhill Crescent Lympstone Devon EX8 5JF
93% historically approved · decision due ~23 Oct
Low-energy retrofit of existing dwelling including enlarged side dormer, two-storey rear extension, new porch extension, changes to fenestration and external materials, and landscaping to improve parking and level access
Awaiting decision Full applications Extension Loft or dormer +1 15 docsSmall domestic -
7 Highcliffe Close Lympstone Devon EX8 5HF
Non-material amendment to 23/2334/FUL to add a bike store to the back of the approved garage.
Decided Amendments 4 docs -
Beaches Chapel Road Lympstone Devon EX8 5ER
Demolition of existing front porch and construction of single storey front extension.
Refused Full applications Extension Demolition 9 docsSmall domestic -
Hope Cottage The Strand Lympstone Devon EX8 5JS
97% historically approved · decision due ~3 Feb
Discharge of Condition for 25/1300/FUL: Conditon 3 (CEMP), Condition 4 (Trees) 4. We are submitting an updated Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP) to reflect the revised bridge design, the full details of the ground protection measures in respect of the temporary access track, and the replacement planting details including species and establishment of trees within the private garden areas of the scheme, and the other site-specific details. We are also submitting an updated Landscape Reinstatement Plan, a Tree Replanting Letter, the Homeowner Notice of Entry Letters and the Candy?s Field Tree Planting Maintenance Plan which have been informally reviewed and accepted by Stuart Baker prior to this application. BNG. We are submitting a BNG Plan, a BNG Metric and a BNG Statement. This should be everything that is needed to enable the start of the works.
Awaiting decision Conditions 13 docs
Other prior approval applications
In East Devon
-
26/2012/GPD Awaiting decision
1B Knapp Hill Sidmouth EX10 8XF
Notification of intent to erect a single storey flat roof rear extension which would extend beyond the rear wall of the original house by 4m, for which the maximum height would be 3.13m and for which the height of the eaves would be 2.93m
-
26/1432/PVJ Granted
Future Industrial Services Ltd Durham Way Heathpark Industrial Estate Honiton EX14 1SQ
Prior approval for 186kwp solar panels on multiple buildings across the site all within permitted development rules
-
26/1920/GPD Awaiting decision
25A Church Hill Honiton EX14 2DB
Notification of intent to erect single storey rear extension which would extend beyond the rear wall of the original house by 4.6m, for which the maximum height would be 2.9m and for which the height of the eaves would be 2.9m
-
26/1437/PDQ Withdrawn
Vinnicombes Poltimore Exeter EX4 0AB
Prior Approval for the change of use of the existing agricultural buildings identified as Barns 1 and 2 into 2no. residential dwellings (Use Class C3) under Class Q of Part 3 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
-
26/1716/GPD Awaiting decision
1 Hornbeam Close Honiton EX14 2UB
Notification of intent to remove existing conservatory and replace it with a single-story extension which would extend beyond the rear wall of the original house by 3.9m, for which the maximum height would be 3.19m and for which the height of the eaves would be 2.15m