Planning application
10 Underhill Crescent Lympstone Devon EX8 5JF
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Low-energy retrofit of existing dwelling including enlarged side dormer, two-storey rear extension, new porch extension, changes to fenestration and external materials, and landscaping to improve parking and level access
As published by the council, reference 26/1702/FUL
Application record
- Reference
- 26/1702/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 28 Aug 2026
- Validated
- 28 Aug 2026
- Ward
- Woodbury And Lympstone
- Parish
- Lympstone
- Postcode
- EX8 5JF
Timeline
Dates from the published record
-
28 Aug 2026
Received by East Devon
-
5 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 43 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Barc Architects Limited Agent, an architecture practice registered in Exeter
Active · incorporated 2012 · Exeter
33 applications on PlanIndex · across 5 councils · 83% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Perivale Underhill Lympstone Exmouth EX8 5HH
56% historically approved · decision due ~27 Nov
Notification of intent to demolish the current rear extension and erect a single storey rear extension which would extend beyond the rear wall of the original house by 8m, for which the maximum height would be 3.3m and for which the height of the eaves would be 2.6m
Awaiting decision Prior approval Extension DemolitionSmall domestic -
16 Underhill Crescent Lympstone Exmouth EX8 5JF
Single storey extension to the south elevation, new dormer windows to the north and south elevations and widening of driveway.
Granted Full applications Extension Loft or dormer +1 19 docsSmall domestic -
Land South Of Underhill Close Lympstone
Construction of predominately single storey dwelling with annexe accommodation (outline application with all matters except access reserved)
Refused Outline 38 docsSmall domestic -
Land South Of Underhill Close Lympstone
Construction of predominately single storey dwelling with annexe accommodation and reconfiguration of part of existing car park for public use; outline application with all matters except access reserved
Refused Outline 21 docsSmall domestic -
7 Highcliffe Close Lympstone Devon EX8 5HF
Non-material amendment to 23/2334/FUL to add a bike store to the back of the approved garage.
Decided Amendments 4 docs -
Hope Cottage The Strand Lympstone Devon EX8 5JS
97% historically approved · decision due ~3 Feb
Discharge of Condition for 25/1300/FUL: Conditon 3 (CEMP), Condition 4 (Trees) 4. We are submitting an updated Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP) to reflect the revised bridge design, the full details of the ground protection measures in respect of the temporary access track, and the replacement planting details including species and establishment of trees within the private garden areas of the scheme, and the other site-specific details. We are also submitting an updated Landscape Reinstatement Plan, a Tree Replanting Letter, the Homeowner Notice of Entry Letters and the Candy?s Field Tree Planting Maintenance Plan which have been informally reviewed and accepted by Stuart Baker prior to this application. BNG. We are submitting a BNG Plan, a BNG Metric and a BNG Statement. This should be everything that is needed to enable the start of the works.
Awaiting decision Conditions 13 docs
Other full applications
In East Devon
-
26/2021/FUL Awaiting decision
19 Stoneborough Lane Budleigh Salterton EX9 6HL
Proposed single storey rear and side extensions
-
26/1999/FUL Awaiting decision
Glendale Clyst St George Exeter EX3 0QJ
Demolition of existing rear single storey extension with replacement single storey extension and formation of new internal driveway
-
26/1111/FUL Refused
Flat 1 11 Marine Place Seaton EX12 2QJ
Replacing non-functioning timber sash windows with same style white uPVC sash windows on western elevation.
-
26/1770/FUL Awaiting decision
Roseleigh Church Road Colaton Raleigh Devon EX10 0LH
Demolition of existing bungalow and construction of replacement two-storey dwelling
-
26/1708/FUL Granted
Southlea Lower Broad Oak Road West Hill Ottery St Mary EX11 1XH
Proposed rear/south extension in place of existing conservatory, new entrance door and canopy, cladding and raised patio to main dwelling; garage extension and roof alterations, including solar installation