Planning application
Alfayda Underhill Lympstone Devon EX8 5HH
Works: Extension Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed demolition of garage on west elevation and conservatory on North elevation. Construction of single storey rear extension, retaining wall and patio on North Elevation, two-storey extension on western elevation, stone porch on South Elevation and changes to fenestration.
As published by the council, reference 25/1848/FUL
Application record
- Reference
- 25/1848/FUL
- Type
- Full Application
- Status
- Approved
- Decision
- Granted As published: Approval with conditions
- Received
- 11 Sep 2025
- Validated
- 11 Sep 2025
- Decided
- 22 Oct 2025
- Ward
- Woodbury And Lympstone
- Parish
- Lympstone
- Decision by
- Delegated Decision
- Postcode
- EX8 5HH
Timeline
Dates from the published record
-
11 Sep 2025
Received by East Devon
-
22 Oct 2025
Decision issued: Approval with conditions
-
12 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/0540/VAR Awaiting decision
Alfayda Underhill Lympstone Exmouth EX8 5HH
Application Reference Number: 25/1848/FUL Date of Decision: 22/10/2025 Condition Number(s): 2 Conditions(s) Removal: We wish to reduce the size of the development in order to reduce the cost of the works We wish to remove the side extension.
Who's behind it
Company information only, from the register and Companies House
Fearne Design and Construction Agent, a design practice registered in Exeter
Active · incorporated 2003 · Exeter
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Devon granted permission on 22 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Alfayda Underhill Lympstone Exmouth EX8 5HH
96% historically approved · decision due ~25 May
Application Reference Number: 25/1848/FUL Date of Decision: 22/10/2025 Condition Number(s): 2 Conditions(s) Removal: We wish to reduce the size of the development in order to reduce the cost of the works We wish to remove the side extension.
Awaiting decision Amendments Extension 10 docs -
Beaches Chapel Road Lympstone Devon EX8 5ER
Demolition of existing front porch and construction of single storey front extension.
Refused Full applications Extension Demolition 9 docsSmall domestic -
Perivale Underhill Lympstone Exmouth EX8 5HH
56% historically approved · decision due ~27 Nov
Notification of intent to demolish the current rear extension and erect a single storey rear extension which would extend beyond the rear wall of the original house by 8m, for which the maximum height would be 3.3m and for which the height of the eaves would be 2.6m
Awaiting decision Prior approval Extension DemolitionSmall domestic -
4 Harefield Cottages The Strand Lympstone EX8 5EX
Proposed raising of rear tenement roof and minor internal alterations
Granted Full applications 20 docs -
3 Harefield Cottages The Strand Lympstone EX8 5EX
Installation of two rear rooflights and a single front-facing rooflight. Alterations to fenestration and replacement chimney stack.
Refused Full applications Loft or dormer Windows or glazing 22 docs -
10 Underhill Crescent Lympstone Devon EX8 5JF
93% historically approved · decision due ~23 Oct
Low-energy retrofit of existing dwelling including enlarged side dormer, two-storey rear extension, new porch extension, changes to fenestration and external materials, and landscaping to improve parking and level access
Awaiting decision Full applications Extension Loft or dormer +1 15 docsSmall domestic
Other full applications
In East Devon
-
26/2021/FUL Awaiting decision
19 Stoneborough Lane Budleigh Salterton EX9 6HL
Proposed single storey rear and side extensions
-
26/1999/FUL Awaiting decision
Glendale Clyst St George Exeter EX3 0QJ
Demolition of existing rear single storey extension with replacement single storey extension and formation of new internal driveway
-
26/1111/FUL Refused
Flat 1 11 Marine Place Seaton EX12 2QJ
Replacing non-functioning timber sash windows with same style white uPVC sash windows on western elevation.
-
26/1770/FUL Awaiting decision
Roseleigh Church Road Colaton Raleigh Devon EX10 0LH
Demolition of existing bungalow and construction of replacement two-storey dwelling
-
26/1708/FUL Granted
Southlea Lower Broad Oak Road West Hill Ottery St Mary EX11 1XH
Proposed rear/south extension in place of existing conservatory, new entrance door and canopy, cladding and raised patio to main dwelling; garage extension and roof alterations, including solar installation