Skip to content
PlanIndex Get alerts
Menu

Planning application

Dalmellington Church Knowehead Dalmellington East Ayrshire KA6 7QW

Awaiting decision East Ayrshire 26/0432/LB Listed Building

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal re-configuration of balcony and partition/screen wall, widening of stairway, installation of window ventilation opener on the front (West) elevation and cast-iron gated access on side (North) elevation.

As published by the council, reference 26/0432/LB

Application record

Reference
26/0432/LB
Type
Listed Building
Status
Registered
Received
21 Aug 2026
Validated
21 Aug 2026
Ward
Doon Valley
Parish
Dalmellington
Decision by
Delegated
Postcode
KA6 7QW

Site history

Applications at this address on the East Ayrshire register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • 25/0617/LB Granted

    Dalmellington Church Knowehead Dalmellington East Ayrshire KA6 7QW

    Internal and external alterations to B-Listed Church including internal re-configuration of balcony and partition/screen wall and installation of observatory dome, solar panels and Air Source Heat Pumps (ASHPs) and erection of outbuilding

    Decided 24 Feb 2026 Heritage and listed buildings
  • 25/0618/PP Granted

    Dalmellington Church Knowehead Dalmellington East Ayrshire KA6 7QW

    Erection of outbuilding and external alterations of B-Listed church (Class 10) to include installation of observatory dome, solar panels and Air Source Heat Pumps (ASHPs)

    Decided 24 Feb 2026 Full applications

Timeline

Dates from the published record

  1. 21 Aug 2026

    Received by East Ayrshire

  2. 3 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Ayrshire took a median of 66 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • Site notice (tp28) Application Correspondence (Public) · 27 Aug 2026
  • Plan and elevations of existing Drawing · 21 Aug 2026
  • Proposed plan and elevations Drawing · 21 Aug 2026
  • Details of balcony protrusion and proposed access Drawing · 21 Aug 2026
  • Details of chabges to heritors stairway and window vent Drawing · 21 Aug 2026
  • Detailed report from rainbow glass studios on window vents etc Reports (Public) · 21 Aug 2026
  • Letter of support from owners of the property Other · 21 Aug 2026
  • Outline of permissions being sought Reports (Public) · 21 Aug 2026
  • Application pdf Application Form · 21 Aug 2026
  • Composite plan Drawing · 21 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Ayrshire for determination, against a statutory target of eight weeks. Over the last year East Ayrshire decided heritage and listed building applications in a median of 82 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In East Ayrshire

  • 26/0264/LB Granted

    Kirkland Manse Road Kilmaurs East Ayrshire KA3 2NP

    Replacement of 11no. windows within the front elevation

    Received 2 Jun, published by the council 7 Aug 2026 Heritage and listed buildings
  • 26/0489/LB Awaiting decision

    Kennox House Kennox C6 Auchenharvie Stewarton From Stewarton To Laigh Auchenharvie Stewarton East Ayrshire KA3 3EF

    Proposed alterations including changes to internal layout, replacement of internal doors, installation of security sensors and replacement of rooflights.

    Received 15 Sep, published by the council 5 Oct 2026 Heritage and listed buildings
  • 26/0001/AMCCAC Awaiting decision

    Greenmill Primary School 2 Barrhill Road Cumnock East Ayrshire KA18 1PG

    Discharge of Condition (1) (Working Hours), Condition (2) (Dust Management Plan) and Condition (3) (Demolition Method Statement) of Conservation Area Consent 25/0244/CA (Complete Demolition in a Conservation Area)

    Received 14 Sep, published by the council 24 Sep 2026 Heritage and listed buildings
  • 26/0263/LB Refused

    30 Portland Road Kilmarnock East Ayrshire KA1 2BS

    Replacement of 7no. windows to front elevation

    Received 2 Jun, published by the council 7 Aug 2026 Heritage and listed buildings
  • 26/0097/LB Granted

    12 Polwarth Street Galston East Ayrshire KA4 8HG

    Proposed external alterations- new window and door, repaint building and associated alterations

    Received 4 Mar, published by the council 29 Jul 2026 Heritage and listed buildings