Planning application
Acton Works 130 Bollo Lane Acton W3 8QU
Works: Demolition Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of a Landscape Management Plan pursuant to Condition 20 of planning permission ref: 243527VAR dated 27.06.2025 for 'Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA dated 28/03/2024, and ref: 243393NMA dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market
As published by the council, reference 262662CND
Application record
- Reference
- 262662CND
- Status
- Pending Consideration
- Received
- 3 Jul 2026
- Validated
- 3 Jul 2026
- Ward
- South Acton
- Postcode
- W3 8QU
Site history
Applications at this address on the Ealing register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
253204CND Granted
Acton Works 130 Bollo Lane Acton W3 8QU
Details of internal lift and accesses pursuant to condition 12 of planning permission ref: 243527VAR dated 27.06.2025 for Phase 2 Enabling and Phase 2 Construction.
Timeline
Dates from the published record
-
3 Jul 2026
Received by Ealing
-
2 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ealing took a median of 55 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 243527VAR (Granted with S106 conditions)
Who's behind it
Company information only, from the register and Companies House
Carter Jonas LLP Agent
883 applications on PlanIndex · across 132 councils · 88% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
- APPLICATIONFORMREDACTED
- CONDITION 20 - LANDSCAPING AND MANAGEMENT SUBMISSION PLOT3A_REV02PART-1
- CONDITION 20 - LANDSCAPING AND MANAGEMENT SUBMISSION PLOT3A_REV02PART-2
- CONDITION 20 - LANDSCAPING AND MANAGEMENT SUBMISSION PLOT3A_REV02PART-3
- CONDITION 20 - LANDSCAPING AND MANAGEMENT SUBMISSION PLOT3A_REV02PART-4 (1)
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Ealing for determination, against a statutory target of eight weeks. Over the last year Ealing's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Ealing's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Solar Glare pursuant to Condition 16 of planning permission ref: 243527VAR dated 26th June 2025 in so far as it relates to the Phase 2 Enabling and Construction only
Granted 3 docs -
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Photovoltaic Panels part pursuant to Condition 28 of planning permission ref: 243527VAR dated 26th June 2025 for Phase 2 Enabling and Phase 2 Construction.
Granted 4 docs -
Acton Works 130 Bollo Lane Acton W3 8QU
94% historically approved · decision due ~28 Aug
Submission of a Landscape Management Plan pursuant to Condition 20 of planning permission ref: 243527VAR dated 27.06.2025 for 'Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA dated 28/03/2024, and ref: 243393NMA dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market
Awaiting decision Conditions Demolition 5 docsMajor scheme -
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
94% historically approved · decision due ~4 Aug
Details of Solar Glare pursuant to Condition 16 of planning permission ref: 243527VAR dated 26th June 2025 in so far as it relates to the Phase 2 Enabling and Construction only
Awaiting decision Conditions 3 docs -
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Photovoltaic Panels part pursuant to Condition 28 of planning permission ref: 243527VAR dated 26th June 2025 for Phase 2 Enabling and Phase 2 Construction.
Granted Conditions 4 docs -
Remaining Area Of Acton Gardens Master Plan (South Acton Estate) Acton W3 8TQ
Details of parking pursuant to condition 48 (Phase 9.4) of planning permission ref.192796REM dated 9.10.2019 'Reserved matters application in respect of Phase 9.4 of the Remaining Acton Gardens Masterplan pursuant to conditions 7 (Reserved Matters) and 8 (Reserved Matters Details) of the Hybrid Outline Planning Permission Ref: 182579OUT (dated 24/12/2018) for the continued regeneration of the South Acton Estate. Application seeks approval for Means of Access, Appearance, Landscaping, Layout and Scale - in relation to the construction of one apartment building varying in height from 2 -12 storeys, comprising 209 new residential units; with associated private and semi-private amenity space and public realm improvements; bicycle storage; car parking; refuse/recycling and plant rooms; following the demolition of the Osborne Hotel, maisonettes along Bollo Lane and Osborne Road, and the temporary Acton Gardens Marketing Suite and site offices, and tree removal. Application is accompanied by an Environmental Statement of Compliance
Granted Conditions Demolition Trees 11 docsDomestic