Planning application
Acton Works 130 Bollo Lane Acton W3 8QU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of internal lift and accesses pursuant to condition 12 of planning permission ref: 243527VAR dated 27.06.2025 for Phase 2 Enabling and Phase 2 Construction.
As published by the council, reference 253204CND
Application record
- Reference
- 253204CND
- Type
- Discharge Condition
- Status
- Approved
- Decision
- Approved
- Received
- 21 Aug 2025
- Validated
- 21 Aug 2025
- Decided
- 10 Nov 2025
- Ward
- South Acton
- Decision by
- Delegated Decision
- Postcode
- W3 8QU
Site history
Applications at this address on the Ealing register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
262662CND Awaiting decision
Acton Works 130 Bollo Lane Acton W3 8QU
Submission of a Landscape Management Plan pursuant to Condition 20 of planning permission ref: 243527VAR dated 27.06.2025 for 'Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA dated 28/03/2024, and ref: 243393NMA dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market
Timeline
Dates from the published record
-
21 Aug 2025
Received by Ealing
-
10 Nov 2025
Decision issued: Approved
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
773 applications on PlanIndex · across 128 councils · 85% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Ealing granted permission on 10 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of ground and airborne building vibration pursuant to condition 49 of planning permission ref: 243527VAR dated 26/06/2025 for Phase 3 Enabling and Phase 3 Construction.
Granted Conditions 4 docs -
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Ventilation Strategy pursuant to condition 39 of planning permission ref: 243527VAR dated 26/06/2025 for Phase 2 Enabling and Phase 2 Construction.
Granted Conditions 6 docs -
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of ground and airborne building vibration pursuant to condition 49 of planning permission ref: 243527VAR dated 26/06/2025 for Phase 3 Enabling and Phase 3 Construction.
Granted Conditions 4 docs -
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Submission of a Bird Hazard Management Plan pursuant to condition 59 of planning permission 243527VAR dated 26.06.2025 for Phase 2 Enabling, Phase 2 Construction, Phase 3 Enabling and Phase 3 Construction
Granted Conditions 5 docs -
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of a Construction and Demolition Management Plan part pursuant to condition 17 (Phase 2 Enabling, Phase 2 Construction, Phase 3 Enabling, and Phase 3 Construction only) of planning permission ref: 201379OUT dated 22/12/2021 for: Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market dwellings (up to 61,940sqm(GIA)) in 8 Blocks of between 8 storeys and 18 storeys, new open and amenity space, vehicle and cycle parking, rear service road, alterations to vehicular accesses and associated public realm works. Appearance to be a 'reserved' matter.
Granted Conditions Demolition 6 docs -
Acton Works Bollo Lane Acton W3 8QU
Details of Sustainable Design and Construction strategies, in pursuant to condition 30 (Phase 2 Enabling and Phase 2 Construction only) of planning permission ref: 201379OUT dated 22/12/2021 for: Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market dwellings (up to 61,940sqm(GIA)) in 8 Blocks of between 8 storeys and 18 storeys, new open and amenity space, vehicle and cycle parking, rear service road, alterations to vehicular accesses and associated public realm works. Appearance to be a 'reserved' matter.
Granted Conditions Demolition 6 docs
Other condition discharge and variation applications
In Ealing
-
260882CND Refused
Weaver Rose House High Street Southall UB1 3DN
Details of a Ventilation Strategy Report pursuant to Condition 16 of planning permission ref: 232967FUL dated 31.01.2024 for: Construction of a six storey building with part basement level, comprising 24 self contained flats with associated cycle and bin storage as well as soft and hard landscaping (Following Demolition of the existing buildings)
-
260534CND Granted
444 Allenby Road Southall UB1 2HT
Submission of an enhanced sound insulation in pursuant to condition 9 of planning application Ref: 251383FUL dated 31.10.2025 for 'Conversion of dwellinghouse into two flats; single storey rear extension; front extension; front porch extension; part single, part two storey side extension (following demolition of existing garage); part single, part two storey rear extension with patio'
-
261058CND Granted
Nile Lodge Queens Walk Ealing W5 1TJ
Details of Ventilation Strategy Report pursuant to condition 10 of planning permission ref: 254396FUL dated 27/11/2024 for: Redevelopment of the site to deliver a hostel development (Sui Generis) in a part 4, part 5 storey building following the demolition of parts of the existing building on-site, retention of part of the front facade and associated external alterations, landscaping, car parking, refuse and cycle storage (part retrospective).
-
261853CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
260883CND Granted
Weaver Rose House High Street Southall UB1 3DN
Details of a Piling Method Statement pursuant to Condition 20 of planning permission ref: 232967FUL dated 31.01.2024 for: Construction of a six storey building with part basement level, comprising 24 self contained flats with associated cycle and bin storage as well as soft and hard landscaping (Following Demolition of the existing buildings)