Planning application
68 Lombard Street London EC3V 9LJ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of details of Planning External Finishes Schedule pursuant to condition 14 (a), (b), (c), (e), (f) and (j) of Planning Permission 24/01354/FULL dated 31.10.2025.
As published by the council, reference 26/01526/MDC
Application record
- Reference
- 26/01526/MDC
- Status
- Under Consideration
- Received
- 26 Oct 2026
- Validated
- 26 Oct 2026
- Postcode
- EC3V 9LJ
Site history
Applications at this address on the City of London register
This site has had 10 applications since 2025: 5 approved, 0 refused.
-
26/00798/MDC Awaiting decision
68 Lombard Street London EC3V 9LJ
Submission of details of Emergency Power Supply and Energy and Sustainability Report pursuant to conditions 12 and 13 of Planning Permission 24/01354/FULL dated 31.10.2025.
-
26/00609/MDC Awaiting decision
68 Lombard Street London EC3V 9LJ
Submission of response to condition requirements (SuDs) pursuant to condition 10 of Planning Permission 24/01354/FULL dated 31.10.2025.
-
26/00566/MDC Awaiting decision
68 Lombard Street London EC3V 9LJ
Submission of details of Updated Urban Greening Factor Assessment pursuant to condition 23 of Planning Permission 24/01354/FULL dated 31.10.2025.
-
26/00524/FULMAJ Awaiting decision
68 Lombard Street London EC3V 9LJ
Amendments under Section 73 of the Town Planning and Country Act 1990 to planning permission reference 24/01354/FULL dated 31 October 2025 to amend Condition 46 (Approved Drawings) to enable design amendments to the approved scheme involving increased lift overrun height, the relocation and reconfiguration of rooftop plant and services, and revisions to the extent and arrangement of blue/green roofs, resulting in consequential changes to the Urban Greening Factor.
-
26/00470/MDC Granted
68 Lombard Street London EC3V 9LJ
Submission of details of Construction Environmental Management plan and Construction Logistics Plan pursuant to conditions 3 and 9 of Planning permission 24/01354/FULL dated 31.10.2025.
-
25/01595/NMA Granted
68 Lombard Street London EC3V 9LJ
Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 24/01354/FULL dated 31 October 2025 to: (i) delete Condition 11 (Ground Movement Assessment); (ii) amend Condition 6(b) (Circular Economy) and Condition 7 (Whole Life Cycle Carbon) to alter the trigger points; and (iii) amend Condition 46 (Approved Drawings) to enable design amendments to the approved scheme involving removal of the consented lightwell; increased number of windows; amendments to refuse and cycle storage areas, increase in lift overrun height; reduced green roof and blue roof areas; and Level 12 adjustments to louvers, panels, doors, windows, and roof.
-
25/01526/MDC Granted
68 Lombard Street London EC3V 9LJ
Submission of details of the proposed threshold levels within the entire perimeter of the site; and a site condition survey of the adjacent highways and other land at the perimeter of the site pursuant to conditions 4 and 5 of planning permission 24/01354/FULL dated 31/10/2025.
-
25/01527/MDC Granted
68 Lombard Street London EC3V 9LJ
Submission of a detailed structural audit to ascertain the possible level and adaptability of retained structure and full details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement guidance pursuant to condition 6 (part A) of planning permission 24/01354/FULL dated 31/10/2025.
-
25/01525/MDC Granted
68 Lombard Street London EC3V 9LJ
Submission of a scheme of protective works; and a Demolition and Construction Logistics Plan pursuant to conditions 2 and 3 of planning permission 24/01354/FULL dated 31/10/2025.
Timeline
Dates from the published record
-
26 Oct 2026
Received by City of London
-
2 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 84 days over the applications it decided in the last year.
What happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 84 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
67 Lombard Street London EC3V 9LJ
Submission of a site condition survey pursuant to Condition 3 of Planning Permission 25/01761/FULL dated 15.06.2026.
Granted -
67 Lombard Street London EC3V 9LJ
Works comprising: (i) partial removal of louvres on levels 6, 7 and 8. (ii) consolidation of rooftop plant and creation of terrace. (iii) removal of BMU system. (iv) other associated works.
Granted Full applications 41 docs -
68 Lombard Street London EC3V 9LJ
Submission of details of Construction Environmental Management plan and Construction Logistics Plan pursuant to conditions 3 and 9 of Planning permission 24/01354/FULL dated 31.10.2025.
Granted 6 docs -
67 Lombard Street London EC3V 9LJ
Works comprising: (i) alterations to ground floor entrance. (ii) alterations to service entrance. (iii) relocation of dry riser inlets. (iv) alterations to level 06 terrace.
Granted Full applications 42 docs -
67 Lombard Street London EC3V 9LJ
99% historically approved · decision due ~10 Jun
Works comprising: (i) partial removal of louvres on levels 6, 7 and 8. (ii) consolidation of the rooftop plant. (iii) introduction of access to level 9 (iv) addition of a roof extension and creation of internal and external amenity space on level 9 (v) other associated works.
Awaiting decision Full applications Extension 33 docs -
21 Lombard Street London EC3V 9AH
An application submitted under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 26 (revolving door), condition 31 (Cycle parking), condition 34 (End of Trip Facilities), Condition 44 (Waste Storage), Condition 45 (Approved Floor Space), Condition 46 (Access Management Plan) and condition 47 (Approved Plans) of planning permission 24/00126/FULMAJ dated 27 February 2025 to incorporate minor material amendments comprising: (i) alterations to the ground floor and public realm; (ii) insertion of a drum door entrance; (iii) alterations to the Nicholas Lane entrance, (iv) alterations to the loading bay arrangement; (v) alterations to the Gatehouse, (vi) alterations to the massing and upper floors including revised facade articulation; (vii) revised roof terrace access and planter access; and (viii) all associated works.
Granted 169 docs