Skip to content
PlanIndex Get alerts
Menu

Planning application

68 Lombard Street London EC3V 9LJ

Awaiting decision City of London 26/00798/MDC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of details of Emergency Power Supply and Energy and Sustainability Report pursuant to conditions 12 and 13 of Planning Permission 24/01354/FULL dated 31.10.2025.

As published by the council, reference 26/00798/MDC

Application record

Reference
26/00798/MDC
Status
Under Consideration
Received
2 Jun 2026
Validated
2 Jun 2026
Ward
Walbrook
Decision by
Delegated
Postcode
EC3V 9LJ

Site history

Applications at this address on the City of London register

This site has had 9 applications since 2025: 3 approved, 0 refused.

  • 26/00609/MDC Awaiting decision

    68 Lombard Street London EC3V 9LJ

    Submission of response to condition requirements (SuDs) pursuant to condition 10 of Planning Permission 24/01354/FULL dated 31.10.2025.

    Submitted 24 Apr 2026 Conditions
  • 26/00566/MDC Awaiting decision

    68 Lombard Street London EC3V 9LJ

    Submission of details of Updated Urban Greening Factor Assessment pursuant to condition 23 of Planning Permission 24/01354/FULL dated 31.10.2025.

    Submitted 20 Apr 2026 Conditions
  • 26/00524/FULMAJ Awaiting decision

    68 Lombard Street London EC3V 9LJ

    Amendments under Section 73 of the Town Planning and Country Act 1990 to planning permission reference 24/01354/FULL dated 31 October 2025 to amend Condition 46 (Approved Drawings) to enable design amendments to the approved scheme involving increased lift overrun height, the relocation and reconfiguration of rooftop plant and services, and revisions to the extent and arrangement of blue/green roofs, resulting in consequential changes to the Urban Greening Factor.

    Submitted 13 Apr 2026 Full applications
  • 26/00470/MDC Granted

    68 Lombard Street London EC3V 9LJ

    Submission of details of Construction Environmental Management plan and Construction Logistics Plan pursuant to conditions 3 and 9 of Planning permission 24/01354/FULL dated 31.10.2025.

    Decided 17 Jul 2026 Conditions
  • 25/01595/NMA Granted

    68 Lombard Street London EC3V 9LJ

    Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 24/01354/FULL dated 31 October 2025 to: (i) delete Condition 11 (Ground Movement Assessment); (ii) amend Condition 6(b) (Circular Economy) and Condition 7 (Whole Life Cycle Carbon) to alter the trigger points; and (iii) amend Condition 46 (Approved Drawings) to enable design amendments to the approved scheme involving removal of the consented lightwell; increased number of windows; amendments to refuse and cycle storage areas, increase in lift overrun height; reduced green roof and blue roof areas; and Level 12 adjustments to louvers, panels, doors, windows, and roof.

    Decided 8 Jun 2026 Amendments
  • 25/01526/MDC Granted

    68 Lombard Street London EC3V 9LJ

    Submission of details of the proposed threshold levels within the entire perimeter of the site; and a site condition survey of the adjacent highways and other land at the perimeter of the site pursuant to conditions 4 and 5 of planning permission 24/01354/FULL dated 31/10/2025.

    Decided 13 Nov 2025 Conditions
  • 25/01527/MDC Awaiting decision

    68 Lombard Street London EC3V 9LJ

    Submission of a detailed structural audit to ascertain the possible level and adaptability of retained structure and full details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement guidance pursuant to condition 6 (part A) of planning permission 24/01354/FULL dated 31/10/2025.

    Submitted 6 Nov 2025 Conditions
  • 25/01525/MDC Awaiting decision

    68 Lombard Street London EC3V 9LJ

    Submission of a scheme of protective works; and a Demolition and Construction Logistics Plan pursuant to conditions 2 and 3 of planning permission 24/01354/FULL dated 31/10/2025.

    Submitted 6 Nov 2025 Conditions

Timeline

Dates from the published record

  1. 2 Jun 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 78 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,250 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Lombard Fields Limited Applicant, registered in London

Active · incorporated 2024 · London

5 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

  • APPLICATIONFORMREDACTED Application Form · 02 Jun 2026
  • CONDITION 12 AND 13 DISCHARGE LETTER Cover Letter · 02 Jun 2026
  • EMERGENCY GENERATOR NOTE Other · 02 Jun 2026
  • ENERGY AND SUSTAINABILITY REPORT Accompanying report · 02 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 78 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 67 Lombard Street London EC3V 9LJ

    26/01231/MDC Submitted 31 Aug 2026 0m away

    Submission of a site condition survey pursuant to Condition 3 of Planning Permission 25/01761/FULL dated 15.06.2026.

    Granted
  • 67 Lombard Street London EC3V 9LJ

    26/00466/FULL Submitted 31 Mar 2026 0m away

    99% historically approved · decision due ~8 Jun

    Works comprising: (i) partial removal of louvres on levels 6, 7 and 8. (ii) consolidation of rooftop plant and creation of terrace. (iii) removal of BMU system. (iv) other associated works.

    Decided Full applications 41 docs
  • 67 Lombard Street London EC3V 9LJ

    25/01761/FULL Submitted 12 Dec 2025 19m away

    Works comprising: (i) alterations to ground floor entrance. (ii) alterations to service entrance. (iii) relocation of dry riser inlets. (iv) alterations to level 06 terrace.

    Granted Full applications 42 docs
  • 67 Lombard Street London EC3V 9LJ

    26/00531/FULL Submitted 15 Apr 2026 19m away

    99% historically approved · decision due ~10 Jun

    Works comprising: (i) partial removal of louvres on levels 6, 7 and 8. (ii) consolidation of the rooftop plant. (iii) introduction of access to level 9 (iv) addition of a roof extension and creation of internal and external amenity space on level 9 (v) other associated works.

    Awaiting decision Full applications Extension 33 docs
  • 21 Lombard Street London EC3V 9AH

    24/00126/FULMAJ Submitted 5 Feb 2024 22m away

    Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.

    Granted Full applications Extension Roofing +1 136 docs
    Major scheme
  • 68 Lombard Street London EC3V 9LJ

    25/01595/NMA Submitted 14 Nov 2025 34m away

    Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 24/01354/FULL dated 31 October 2025 to: (i) delete Condition 11 (Ground Movement Assessment); (ii) amend Condition 6(b) (Circular Economy) and Condition 7 (Whole Life Cycle Carbon) to alter the trigger points; and (iii) amend Condition 46 (Approved Drawings) to enable design amendments to the approved scheme involving removal of the consented lightwell; increased number of windows; amendments to refuse and cycle storage areas, increase in lift overrun height; reduced green roof and blue roof areas; and Level 12 adjustments to louvers, panels, doors, windows, and roof.

    Granted Amendments Windows or glazing 31 docs