Planning application
21 Lombard Street London EC3V 9AH
Relates to 24/00126/FULMAJ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
An application submitted under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 26 (revolving door), condition 31 (Cycle parking), condition 34 (End of Trip Facilities), Condition 44 (Waste Storage), Condition 45 (Approved Floor Space), Condition 46 (Access Management Plan) and condition 47 (Approved Plans) of planning permission 24/00126/FULMAJ dated 27 February 2025 to incorporate minor material amendments comprising: (i) alterations to the ground floor and public realm; (ii) insertion of a drum door entrance; (iii) alterations to the Nicholas Lane entrance, (iv) alterations to the loading bay arrangement; (v) alterations to the Gatehouse, (vi) alterations to the massing and upper floors including revised façade articulation; (vii) revised roof terrace access and planter access; and (viii) all associated works.
As published by the council, reference 25/01111/FULMAJ
Application record
- Reference
- 25/01111/FULMAJ
- Type
- Full Major Application
- Status
- Under Consideration
- Received
- 14 Aug 2025
- Validated
- 14 Aug 2025
- Ward
- Candlewick
- Decision by
- Delegated
- Postcode
- EC3V 9AH
Site history
Applications at this address on the City of London register
This site has had 2 applications since 2024: 1 approved, 0 refused.
-
24/00126/FULMAJ Granted
21 Lombard Street London EC3V 9AH
Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.
Timeline
Dates from the published record
-
14 Aug 2025
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 November 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
City of London took a median of 84 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
24/00126/FULMAJ Granted
21 Lombard Street London EC3V 9AH
Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.
Who's behind it
Company information only, from the register and Companies House
Newmark LLP Agent
930 applications on PlanIndex · across 40 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordIC Multi LS Limited Applicant, registered in London
Active · incorporated 2019 · London
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
169 documents on file for this application
- DRAFT DEED OF VARIATION
- GLA_CARBON_EMISSION_REPORTING_SPREADSHEET_V2.0_0 - EXISTING COMPARISON
- CONSTRUCTION LOGISTICS TECHNICAL NOTE
- SPREADSHEET - GLA CARBON EMISSION REPORTING SPREADSHEET - EXISTING COMPARISON
- BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN
- GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN-REV 5
- PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4
- PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4
- COMMENTS - CAAC LETTER
- COMMENTS - AIR QUALITY
- AMENDED ELEVATIONS
- AMENDMENTS ELEVATIONS
- COMMENTS - LONDON UNDERGROUND
- COMMENTS - GATWICK AIRPORT
- COMMENTS - HISTORIC ENGLAND
- MARKED UP COMPARISON BETWEEN APPROVED AND PROPOSED DRAWINGS
- COMMENTS-HISTORIC ENGLAND
- COMMENTS-LONDON CITY AIRPORT
- COMMENTS - ACTIVE TRAVEL
- COMMENTS-HEATHROW SAFEGUARDING
- COMMENTS - NATS
- WLCA GLA TEMPLATE
- APPLICATIONFORMREDACTED
- ACOUSTIC ASSESSMENT
- AIR QUALITY IMPACT ASSESSMENT
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT_1
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT_2
- DAYLIGHT AND SUNLIGHT AND OVERSHADOWING
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART6
- AREA SCHEDULE
- CIRCULAR ECONOMY STATEMENT
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART7
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART8
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART9
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART1
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART2
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART3
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART4
- 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART5
- ECOLOGY REPORT
- FLOOD RISK ASSESSMENT AND SUDS STRATEGY_2
- FLOOD RISK ASSESSMENT AND SUDS STRATEGY_3
- HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM_1
- HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM_2
- ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_1
- ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_2
- ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_3
- 21 LS - SECTION 73 - TOWN PLANNING STATEMENT
- 250704_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART1
- 250704_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART3
- 250707_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART2
- WHOLE LIFE CYCLE CARBON ASSESSMENT
- WLCA GLA TEMPLATE
- AS APPROVED LEVEL 04 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED LEVEL 04 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED LEVEL 05 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED - LEVEL 05 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED LEVEL 06 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED LEVEL 06 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED LEVEL 07 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED - DEMOLITION GENERAL ARRANGEMENT WEST ELEVATION - R
- AS APPROVED - BASEMENT 2 PROPOSED GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED - BASEMENT 3 DEMOLITION GENERAL ARRANGEMENT PLAN -
- AS APPROVED - BASEMENT 3 PROPOSED GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED - GROUND FLOOR DEMOLITION GENERAL ARRANGEMENT PLAN
- AS APPROVED - GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN -
- AS APPROVED - GENERAL ARRANGEMENT DEMOLITION ROOF PLAN - REV 3
- AS APPROVED -ROOF PROPOSED GENERAL ARRANGEMENT PLAN - REV 3
- AS APPROVED - PROPOSED GENERAL ARRANGEMENT NORTH ELEVATION - RE
- AS APPROVED - PROPOSED GENERAL ARRANGEMENT SOUTH ELEVATION - RE
- AS APPROVED - PROPOSED GENERAL ARRANGEMENT EAST ELEVATION - REV
- AS APPROVED - PROPOSED GENERAL ARRANGEMENT WEST ELEVATION - REV
- AS APPROVED - PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 3
- AS APPROVED - PROPOSED GENERAL ARRANGEMENT SECTION BB CC - REV
- AS APPROVED - DEMOLITION GENERAL ARRANGEMENT NORTH ELEVATION -
- AS APPROVED - DEMOLITION GENERAL ARRANGEMENT SOUTH ELEVATION -
- AS APPROVED - DEMOLITION GENERAL ARRANGEMENT EAST ELEVATION - R
- DEMOLITION GENERAL ARRANGEMENT EAST ELEVATION - R
- DEMOLITION GENERAL ARRANGEMENT SOUTH ELEVATION -
- DEMOLITION GENERAL ARRANGEMENT WEST ELEVATION - R
- DEMOLITION GENERAL ARRANGEMENT NORTH ELEVATION -
- LEVEL 07 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- LEVEL 08 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- BASEMENT 1 DEMOLITION GENERAL ARRANGEMENT PLAN -
- BASEMENT 2 DEMOLITION GENERAL ARRANGEMENT PLAN -
- BASEMENT 3 DEMOLITION GENERAL ARRANGEMENT PLAN -
- GROUND FLOOR DEMOLITION GENERAL ARRANGEMENT PLAN
- GENERAL ARRANGEMENT DEMOLITION ROOF PLAN - REV 4
- LEVEL 01 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- LEVEL 02 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- LEVEL 03 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- LEVEL 04 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- LEVEL 05 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- LEVEL 06 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- EXISTING GENERAL ARRANGEMENT NORTH ELEVATION - RE
- EXISTING GENERAL ARRANGEMENT SOUTH ELEVATION - RE
- EXISTING GENERAL ARRANGEMENT EAST ELEVATION - REV
- EXISTING GENERAL ARRANGEMENT WEST ELEVATION - REV
- LEVEL 01 EXISTING GENERAL ARRANGEMENT PLAN - REV
- LEVEL 02 EXISTING GENERAL ARRANGEMENT PLAN - REV
- LEVEL 03 EXISTING GENERAL ARRANGEMENT PLAN - REV
- EXTERNAL LIGHTING IMPACT ASSESSMENT
- OUTLINE FIRE SAFETY STRATEGY REPORT
- FLOOD RISK ASSESSMENT AND SUDS STRATEGY_1
- WIND MICROCLIMATE IMPACT ASSESSMENT
- AS APPROVED - LEVEL 07 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED LEVEL 08 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED - LEVEL 08 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED - LEVEL 09 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED - LEVEL 10 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED - LEVEL 11 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED - LEVEL 01 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED -LEVEL 01 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED -LEVEL 02 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED LEVEL 02 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED - LEVEL 03 DEMOLITION GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED - LEVEL 03 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- AS APPROVED - SITE LOCATION PLAN - REV 3
- AS APPROVED - PROPOSED SITE PLAN - REV 3
- AS APPROVED - PROPOSED TYPICAL BAY DETAIL - REV 0
- AS APPROVED - RETAINED CURTAIN WALL DETAIL - REV 0
- AS APPROVED - PROPOSED FLOOR BAY DETAIL - REV 0
- AS APPROVED - PROPOSED GATEHOUSE DETAIL - REV 0
- AS APPROVED - BASEMENT 1 DEMOLITION GENERAL ARRANGEMENT PLAN -
- AS APPROVED - BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN - RE
- AS APPROVED - BASEMENT 2 DEMOLITION GENERAL ARRANGEMENT PLAN -
- LEVEL 04 EXISTING GENERAL ARRANGEMENT PLAN - REV
- LEVEL 05 EXISTING GENERAL ARRANGEMENT PLAN - REV
- LEVEL 06 EXISTING GENERAL ARRANGEMENT PLAN - REV
- LEVEL 07 EXISTING GENERAL ARRANGEMENT PLAN - REV
- LEVEL 08 EXISTING GENERAL ARRANGEMENT PLAN - REV
- BASEMENT 1 EXISTING GENERAL ARRANGEMENT PLAN - RE
- BASEMENT 2 EXISTING GENERAL ARRANGEMENT PLAN - RE
- BASEMENT 3 EXISTING GENERAL ARRANGEMENT PLAN - RE
- GROUND FLOOR EXISTING GENERAL ARRANGEMENT PLAN -
- EXISTING GENERAL ARRANGEMENT ROOF PLAN - REV 4
- EXISTING SITE PLAN - REV 4
- PROPOSED GATEHOUSE DETAIL - REV 1
- PROPOSED GENERAL ARRANGEMENT NORTH ELEVATION - RE
- PROPOSED GENERAL ARRANGEMENT SOUTH ELEVATION - RE
- PROPOSED GENERAL ARRANGEMENT EAST ELEVATION - REV
- PROPOSED GENERAL ARRANGEMENT WEST ELEVATION - REV
- LEVEL 06 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 07 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 08 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 09 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 10 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 11 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- SUPERSEDED BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN - RE
- BASEMENT 2 PROPOSED GENERAL ARRANGEMENT PLAN - RE
- BASEMENT 3 PROPOSED GENERAL ARRANGEMENT PLAN - RE
- SUPERSEDED GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN -
- ROOF PROPOSED GENERAL ARRANGEMENT PLAN - REV 4
- 440888-WBA-ZZ-ZZ-DR-AR-11001 - SITE LOCATION PLAN - REV 4
- PROPOSED SITE PLAN - REV 4
- LEVEL 01 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 02 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 03 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- LEVEL 04 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- SUPERSEDED PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4
- 250704_DRAWING REGISTER V4
- RETAINED CURTAIN WALL DETAIL - REV 1
- PROPOSED FLOOR BAY DETAIL - REV 1
- PROPOSED TYPICAL BAY DETAIL - REV 1
- 21LS - SECTION 73 - COMMUNITY INFRASTRUCTURE LEVY FORM - 15 JULY 2025
- LEVEL 05 PROPOSED GENERAL ARRANGEMENT PLAN - REV
- 21 LS - SECTION 73 - COVER LETTER
- PROPOSED GENERAL ARRANGEMENT SECTION BB CC - REV
- PRELIMINARY ECOLOGICAL APPRAISAL
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of thirteen weeks. Over the last year City of London decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
21 Lombard Street London EC3V 9AH
Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.
Granted Full applications Extension Roofing +1 136 docsMajor scheme -
67 Lombard Street London EC3V 9LJ
Submission of a site condition survey pursuant to Condition 3 of Planning Permission 25/01761/FULL dated 15.06.2026.
Granted -
67 Lombard Street London EC3V 9LJ
Works comprising: (i) partial removal of louvres on levels 6, 7 and 8. (ii) consolidation of rooftop plant and creation of terrace. (iii) removal of BMU system. (iv) other associated works.
Granted Full applications 41 docs -
68 Lombard Street London EC3V 9LJ
Submission of details of Construction Environmental Management plan and Construction Logistics Plan pursuant to conditions 3 and 9 of Planning permission 24/01354/FULL dated 31.10.2025.
Granted 6 docs -
Capital House 85 King William Street London EC4N 7BL
Submission of lighting strategy pursuant to condition 2 of planning permission 21/01110/FULL dated 30/06/2022.
Granted Conditions 6 docs -
85 King William Street London EC4N 7BL
Submission of construction logistic plan pursuant to condition 4 of planning permission 22/00445/FULL dated 28/10/2022.
Granted Conditions 9 docs
Other full applications
In City of London
-
25/01794/FULL Granted
50 Cannon Street London EC4N 6JJ
Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.
-
26/00865/FULL Granted
9 Newbury Street London EC1A 7HU
Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.
-
26/01110/FULL Granted
200 Aldersgate Street London EC1A 4HD
Retrospective application for the installation of 2no. condenser units to fifth floor roof.
-
26/01109/FULL Granted
100 Bishopsgate London EC2N 4AA
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
-
26/01053/FULL Granted
49 Cheapside London EC2V 6AT
Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass