Skip to content
PlanIndex Get alerts
Menu

Planning application

21 Lombard Street London EC3V 9AH

Awaiting decision City of London 25/01111/FULMAJ Full Major Application

Relates to 24/00126/FULMAJ

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

An application submitted under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 26 (revolving door), condition 31 (Cycle parking), condition 34 (End of Trip Facilities), Condition 44 (Waste Storage), Condition 45 (Approved Floor Space), Condition 46 (Access Management Plan) and condition 47 (Approved Plans) of planning permission 24/00126/FULMAJ dated 27 February 2025 to incorporate minor material amendments comprising: (i) alterations to the ground floor and public realm; (ii) insertion of a drum door entrance; (iii) alterations to the Nicholas Lane entrance, (iv) alterations to the loading bay arrangement; (v) alterations to the Gatehouse, (vi) alterations to the massing and upper floors including revised façade articulation; (vii) revised roof terrace access and planter access; and (viii) all associated works.

As published by the council, reference 25/01111/FULMAJ

Application record

Reference
25/01111/FULMAJ
Type
Full Major Application
Status
Under Consideration
Received
14 Aug 2025
Validated
14 Aug 2025
Ward
Candlewick
Decision by
Delegated
Postcode
EC3V 9AH

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 24/00126/FULMAJ Granted

    21 Lombard Street London EC3V 9AH

    Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.

    Decided 27 Feb 2025 Full applications

Timeline

Dates from the published record

  1. 14 Aug 2025

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 November 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 24/00126/FULMAJ Granted

    21 Lombard Street London EC3V 9AH

    Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.

    Decided 27 Feb 2025 Full applications

Who's behind it

Company information only, from the register and Companies House

Newmark LLP Agent

930 applications on PlanIndex · across 40 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

IC Multi LS Limited Applicant, registered in London

Active · incorporated 2019 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

169 documents on file for this application

  • DRAFT DEED OF VARIATION Other · 22 Sep 2026
  • GLA_CARBON_EMISSION_REPORTING_SPREADSHEET_V2.0_0 - EXISTING COMPARISON Other · 15 Jan 2026
  • CONSTRUCTION LOGISTICS TECHNICAL NOTE Other · 12 Jan 2026
  • SPREADSHEET - GLA CARBON EMISSION REPORTING SPREADSHEET - EXISTING COMPARISON Other · 17 Dec 2025
  • BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 17 Dec 2025
  • GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN-REV 5 Drawing · 09 Dec 2025
  • PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4 Drawing · 09 Dec 2025
  • PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4 Drawing · 09 Dec 2025
  • COMMENTS - CAAC LETTER Consultee Comment · 11 Oct 2025
  • COMMENTS - AIR QUALITY Consultee Comment · 24 Sep 2025
  • AMENDED ELEVATIONS Drawing · 22 Sep 2025
  • AMENDMENTS ELEVATIONS Superseded drawing · 18 Sep 2025
  • COMMENTS - LONDON UNDERGROUND Public Comment · 16 Sep 2025
  • COMMENTS - GATWICK AIRPORT Consultee Comment · 11 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 11 Sep 2025
  • MARKED UP COMPARISON BETWEEN APPROVED AND PROPOSED DRAWINGS Drawing · 05 Sep 2025
  • COMMENTS-HISTORIC ENGLAND Consultee Comment · 04 Sep 2025
  • COMMENTS-LONDON CITY AIRPORT Consultee Comment · 04 Sep 2025
  • COMMENTS - ACTIVE TRAVEL Consultee Comment · 03 Sep 2025
  • COMMENTS-HEATHROW SAFEGUARDING Consultee Comment · 03 Sep 2025
  • COMMENTS - NATS Consultee Comment · 02 Sep 2025
  • WLCA GLA TEMPLATE Other · 19 Aug 2025
  • APPLICATIONFORMREDACTED Application Form · 14 Aug 2025
  • ACOUSTIC ASSESSMENT Report - Acoustic/Noise Report · 14 Aug 2025
  • AIR QUALITY IMPACT ASSESSMENT Accompanying report · 14 Aug 2025
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT_1 Accompanying report · 14 Aug 2025
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT_2 Accompanying report · 14 Aug 2025
  • DAYLIGHT AND SUNLIGHT AND OVERSHADOWING Report - Daylight/Sunlight Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART6 Report - Design & Access Statement/Report · 14 Aug 2025
  • AREA SCHEDULE Other · 14 Aug 2025
  • CIRCULAR ECONOMY STATEMENT Other · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART7 Report - Design & Access Statement/Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART8 Report - Design & Access Statement/Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART9 Report - Design & Access Statement/Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART1 Report - Design & Access Statement/Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART2 Report - Design & Access Statement/Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART3 Report - Design & Access Statement/Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART4 Report - Design & Access Statement/Report · 14 Aug 2025
  • 21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART5 Report - Design & Access Statement/Report · 14 Aug 2025
  • ECOLOGY REPORT Accompanying report · 14 Aug 2025
  • FLOOD RISK ASSESSMENT AND SUDS STRATEGY_2 Accompanying report · 14 Aug 2025
  • FLOOD RISK ASSESSMENT AND SUDS STRATEGY_3 Accompanying report · 14 Aug 2025
  • HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM_1 Accompanying report · 14 Aug 2025
  • HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM_2 Accompanying report · 14 Aug 2025
  • ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_1 Accompanying report · 14 Aug 2025
  • ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_2 Accompanying report · 14 Aug 2025
  • ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_3 Accompanying report · 14 Aug 2025
  • 21 LS - SECTION 73 - TOWN PLANNING STATEMENT Report - Planning Statement/Report · 14 Aug 2025
  • 250704_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART1 Report - Transport Statement/Report · 14 Aug 2025
  • 250704_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART3 Report - Transport Statement/Report · 14 Aug 2025
  • 250707_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART2 Report - Transport Statement/Report · 14 Aug 2025
  • WHOLE LIFE CYCLE CARBON ASSESSMENT Other · 14 Aug 2025
  • WLCA GLA TEMPLATE Other · 14 Aug 2025
  • AS APPROVED LEVEL 04 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED LEVEL 04 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED LEVEL 05 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 05 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED LEVEL 06 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED LEVEL 06 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED LEVEL 07 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED - DEMOLITION GENERAL ARRANGEMENT WEST ELEVATION - R Drawing · 14 Aug 2025
  • AS APPROVED - BASEMENT 2 PROPOSED GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED - BASEMENT 3 DEMOLITION GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • AS APPROVED - BASEMENT 3 PROPOSED GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED - GROUND FLOOR DEMOLITION GENERAL ARRANGEMENT PLAN Drawing · 14 Aug 2025
  • AS APPROVED - GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • AS APPROVED - GENERAL ARRANGEMENT DEMOLITION ROOF PLAN - REV 3 Drawing · 14 Aug 2025
  • AS APPROVED -ROOF PROPOSED GENERAL ARRANGEMENT PLAN - REV 3 Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED GENERAL ARRANGEMENT NORTH ELEVATION - RE Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED GENERAL ARRANGEMENT SOUTH ELEVATION - RE Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED GENERAL ARRANGEMENT EAST ELEVATION - REV Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED GENERAL ARRANGEMENT WEST ELEVATION - REV Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 3 Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED GENERAL ARRANGEMENT SECTION BB CC - REV Drawing · 14 Aug 2025
  • AS APPROVED - DEMOLITION GENERAL ARRANGEMENT NORTH ELEVATION - Drawing · 14 Aug 2025
  • AS APPROVED - DEMOLITION GENERAL ARRANGEMENT SOUTH ELEVATION - Drawing · 14 Aug 2025
  • AS APPROVED - DEMOLITION GENERAL ARRANGEMENT EAST ELEVATION - R Drawing · 14 Aug 2025
  • DEMOLITION GENERAL ARRANGEMENT EAST ELEVATION - R Drawing · 14 Aug 2025
  • DEMOLITION GENERAL ARRANGEMENT SOUTH ELEVATION - Drawing · 14 Aug 2025
  • DEMOLITION GENERAL ARRANGEMENT WEST ELEVATION - R Drawing · 14 Aug 2025
  • DEMOLITION GENERAL ARRANGEMENT NORTH ELEVATION - Drawing · 14 Aug 2025
  • LEVEL 07 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • LEVEL 08 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • BASEMENT 1 DEMOLITION GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • BASEMENT 2 DEMOLITION GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • BASEMENT 3 DEMOLITION GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • GROUND FLOOR DEMOLITION GENERAL ARRANGEMENT PLAN Drawing · 14 Aug 2025
  • GENERAL ARRANGEMENT DEMOLITION ROOF PLAN - REV 4 Drawing · 14 Aug 2025
  • LEVEL 01 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • LEVEL 02 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • LEVEL 03 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • LEVEL 04 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • LEVEL 05 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • LEVEL 06 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • EXISTING GENERAL ARRANGEMENT NORTH ELEVATION - RE Drawing · 14 Aug 2025
  • EXISTING GENERAL ARRANGEMENT SOUTH ELEVATION - RE Drawing · 14 Aug 2025
  • EXISTING GENERAL ARRANGEMENT EAST ELEVATION - REV Drawing · 14 Aug 2025
  • EXISTING GENERAL ARRANGEMENT WEST ELEVATION - REV Drawing · 14 Aug 2025
  • LEVEL 01 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 02 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 03 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • EXTERNAL LIGHTING IMPACT ASSESSMENT Accompanying report · 14 Aug 2025
  • OUTLINE FIRE SAFETY STRATEGY REPORT Accompanying report · 14 Aug 2025
  • FLOOD RISK ASSESSMENT AND SUDS STRATEGY_1 Accompanying report · 14 Aug 2025
  • WIND MICROCLIMATE IMPACT ASSESSMENT Other · 14 Aug 2025
  • AS APPROVED - LEVEL 07 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED LEVEL 08 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 08 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 09 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 10 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 11 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 01 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED -LEVEL 01 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED -LEVEL 02 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED LEVEL 02 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 03 DEMOLITION GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED - LEVEL 03 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • AS APPROVED - SITE LOCATION PLAN - REV 3 Site Plan · 14 Aug 2025
  • AS APPROVED - PROPOSED SITE PLAN - REV 3 Site Plan · 14 Aug 2025
  • AS APPROVED - PROPOSED TYPICAL BAY DETAIL - REV 0 Drawing · 14 Aug 2025
  • AS APPROVED - RETAINED CURTAIN WALL DETAIL - REV 0 Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED FLOOR BAY DETAIL - REV 0 Drawing · 14 Aug 2025
  • AS APPROVED - PROPOSED GATEHOUSE DETAIL - REV 0 Drawing · 14 Aug 2025
  • AS APPROVED - BASEMENT 1 DEMOLITION GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • AS APPROVED - BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • AS APPROVED - BASEMENT 2 DEMOLITION GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • LEVEL 04 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 05 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 06 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 07 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 08 EXISTING GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • BASEMENT 1 EXISTING GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • BASEMENT 2 EXISTING GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • BASEMENT 3 EXISTING GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • GROUND FLOOR EXISTING GENERAL ARRANGEMENT PLAN - Drawing · 14 Aug 2025
  • EXISTING GENERAL ARRANGEMENT ROOF PLAN - REV 4 Drawing · 14 Aug 2025
  • EXISTING SITE PLAN - REV 4 Drawing · 14 Aug 2025
  • PROPOSED GATEHOUSE DETAIL - REV 1 Drawing · 14 Aug 2025
  • PROPOSED GENERAL ARRANGEMENT NORTH ELEVATION - RE Drawing · 14 Aug 2025
  • PROPOSED GENERAL ARRANGEMENT SOUTH ELEVATION - RE Drawing · 14 Aug 2025
  • PROPOSED GENERAL ARRANGEMENT EAST ELEVATION - REV Drawing · 14 Aug 2025
  • PROPOSED GENERAL ARRANGEMENT WEST ELEVATION - REV Drawing · 14 Aug 2025
  • LEVEL 06 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 07 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 08 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 09 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 10 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 11 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • SUPERSEDED BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN - RE Superseded drawing · 14 Aug 2025
  • BASEMENT 2 PROPOSED GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • BASEMENT 3 PROPOSED GENERAL ARRANGEMENT PLAN - RE Drawing · 14 Aug 2025
  • SUPERSEDED GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN - Superseded drawing · 14 Aug 2025
  • ROOF PROPOSED GENERAL ARRANGEMENT PLAN - REV 4 Drawing · 14 Aug 2025
  • 440888-WBA-ZZ-ZZ-DR-AR-11001 - SITE LOCATION PLAN - REV 4 Site Plan · 14 Aug 2025
  • PROPOSED SITE PLAN - REV 4 Site Plan · 14 Aug 2025
  • LEVEL 01 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 02 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 03 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • LEVEL 04 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • SUPERSEDED PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4 Superseded drawing · 14 Aug 2025
  • 250704_DRAWING REGISTER V4 Drawings Schedule · 14 Aug 2025
  • RETAINED CURTAIN WALL DETAIL - REV 1 Drawing · 14 Aug 2025
  • PROPOSED FLOOR BAY DETAIL - REV 1 Drawing · 14 Aug 2025
  • PROPOSED TYPICAL BAY DETAIL - REV 1 Drawing · 14 Aug 2025
  • 21LS - SECTION 73 - COMMUNITY INFRASTRUCTURE LEVY FORM - 15 JULY 2025 Other · 14 Aug 2025
  • LEVEL 05 PROPOSED GENERAL ARRANGEMENT PLAN - REV Drawing · 14 Aug 2025
  • 21 LS - SECTION 73 - COVER LETTER Cover Letter · 14 Aug 2025
  • PROPOSED GENERAL ARRANGEMENT SECTION BB CC - REV Drawing · 14 Aug 2025
  • PRELIMINARY ECOLOGICAL APPRAISAL Accompanying report · 30 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of thirteen weeks. Over the last year City of London decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 21 Lombard Street London EC3V 9AH

    24/00126/FULMAJ Submitted 5 Feb 2024 50 yards away

    Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.

    Granted Full applications Extension Roofing +1 136 docs
    Major scheme
  • 67 Lombard Street London EC3V 9LJ

    26/01231/MDC Submitted 31 Aug 2026 50 yards away

    Submission of a site condition survey pursuant to Condition 3 of Planning Permission 25/01761/FULL dated 15.06.2026.

    Granted
  • 67 Lombard Street London EC3V 9LJ

    26/00466/FULL Submitted 31 Mar 2026 50 yards away

    Works comprising: (i) partial removal of louvres on levels 6, 7 and 8. (ii) consolidation of rooftop plant and creation of terrace. (iii) removal of BMU system. (iv) other associated works.

    Granted Full applications 41 docs
  • 68 Lombard Street London EC3V 9LJ

    26/00470/MDC Submitted 31 Mar 2026 50 yards away

    Submission of details of Construction Environmental Management plan and Construction Logistics Plan pursuant to conditions 3 and 9 of Planning permission 24/01354/FULL dated 31.10.2025.

    Granted 6 docs
  • Capital House 85 King William Street London EC4N 7BL

    22/01188/MDC Submitted 7 Dec 2022 50 yards away

    Submission of lighting strategy pursuant to condition 2 of planning permission 21/01110/FULL dated 30/06/2022.

    Granted Conditions 6 docs
  • 85 King William Street London EC4N 7BL

    22/01063/MDC Submitted 8 Nov 2022 50 yards away

    Submission of construction logistic plan pursuant to condition 4 of planning permission 22/00445/FULL dated 28/10/2022.

    Granted Conditions 9 docs

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications