Skip to content
PlanIndex Get alerts
Menu

Planning application

47-50 Mark Lane London EC3R 5AS

Awaiting decision City of London 26/00288/FULL Full Planning Permission

Relates to 24/01044/FULL, 22/01245/FULMAJ

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission 24/01044/FULL dated 25 March 2025 (itself granted pursuant to a section 73 application to permission reference 22/01245/FULMAJ) to remove condition 11 (programme of Heritage Assets), variation of condition 57 (Terrace Hours) to remove reference to the heritage and cultural centre, variation of condition 61 (Cycle Parking) to increase the number of long stay cycle and reduce the number of short stay cycles, removal of condition 71(Retail Floorspace), variation of condition 73 (Use Class Floorspace) to reflect updated floor areas and land uses within the development, variation of condition 77 (Approved Plans) to reflect the reconfiguration of internal layout of the ground and basement levels as well as the public uses proposed within the development, and accompanying deed of variation to the section 106 agreement to vary planning obligations relating to the Tourist Touchdown Space and the public access provisions to the L12 roof terrace and inclusion of a new obligation requiring the submission of a Community Outreach Management Plan.

As published by the council, reference 26/00288/FULL

Application record

Reference
26/00288/FULL
Type
Full Planning Permission
Status
Under Consideration
Received
24 Feb 2026
Validated
24 Feb 2026
Ward
Tower
Decision by
Delegated
Postcode
EC3R 5AS

Site history

Applications at this address on the City of London register

This site has had 32 applications since 2024: 22 approved, 0 refused.

  • 26/01518/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of Above Ground Monitoring Report, Desk Study & Ground Investigation and Supplementary Ground Investigation pursuant to condition 21 of planning permission 24/01044/FULL dated 25.03.2025.

    Submitted 26 Oct 2026
  • 26/01445/MDC Granted

    47-50 Mark Lane London EC3R 5AS

    Submission of Ground Movement Assessment and Substructure Method Statement pursuant to discharge of condition 18 of planning permission 24/01044/FULL dated 25.03.2025.

    Decided 4 Nov 2026
  • 26/01443/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of Preliminary Risk Assessment Report pursuant to discharge of condition 20 of planning permission 24/01044/FULL dated 25.03.2025.

    Submitted 9 Oct 2026
  • 26/01400/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of details of Site Inspection Survey pursuant to condition 34 of Planning Permission 24/01044/FULL dated 25.03.2025.

    Submitted 5 Oct 2026
  • 26/01311/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of Drainage and Flood Plan Part 1 & 2 and Construction Phase Flood Risk & Water Management Plan pursuant to condition 14 of planning permission 24/01044/FULL dated 25.03.2025.

    Submitted 21 Sep 2026
  • 26/01282/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of Drainage Plan pursuant to Condition 13 of planning permission 24/01044/FULL dated 25.03.2025.

    Submitted 15 Sep 2026
  • 26/01158/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of details of Climate Resilience pursuant to condition 9 of Planning Permission 24/01044/FULL dated 25.03.2025.

    Submitted 12 Aug 2026 Conditions
  • 26/01153/PODC Granted

    47-50 Mark Lane London EC3R 5AS

    Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 and Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).

    Decided 19 Aug 2026
  • 26/01152/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of details of Scheme of Protective Works pursuant to condition 4 of Planning Permission 24/01044/FULL dated 25.03.2025.

    Submitted 11 Aug 2026 Conditions
  • 26/01137/MDC Awaiting decision

    47-50 Mark Lane London EC3R 5AS

    Submission of details of Piling Methods Statement pursuant to condition 12 of Planning Permission 24/01044/FULL dated 25.03.2025.

    Submitted 7 Aug 2026

Timeline

Dates from the published record

  1. 24 Feb 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 24/01044/FULL Granted

    47-50 Mark Lane London EC3R 5AS

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the variation of Conditions 53 (Fire Statement), 61 (Cycle Parking), 63 (Cycle Facilities), 73 (Use class floorspace) and 74 (Approved Drawings) of planning permission reference 22/01245/FULMAJ dated 20 September 2023, as amended by 24/00941/NMA on 20 September 2024 to allow the following amendments: i) Re-configuration of proposed massing; ii) Height of Block E located at rear of the Site increased by one storey; iii) Minor internal re-configuration of ground floor uses; iv) Refinement of facade to rear block (Block E); v) Improvements to cultural offer and public access provisions

    Decided 25 Mar 2025 Full applications
  • 22/01245/FULMAJ Granted

    Site Boundary 1 - 12 Byward Street London

    Demolition of existing buildings and structures, retention of existing basement and construction of a new ground plus 11 storey office-led mixed use building with associated external roof terraces; hard and soft landscaping works; servicing and plant; provision of cycle storage; and ancillary works.

    Decided 28 Apr 2023 Full applications

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,662 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

42 documents on file for this application

  • NPPF RESPONSE Other · 11 Sep 2026
  • REPRESENTATION - PAUL PAVLOU Public Comment · 03 Jun 2026
  • PLANNING NOTE Other · 22 May 2026
  • GROUND FLOOR PLAN PROPOSED Drawing · 21 May 2026
  • PLANNING NOTE Other · 21 May 2026
  • PLANNING NOTE Other · 18 May 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 15 May 2026
  • REPRESENTATION - THEODORA CHARLAMBIDOU Public Comment · 09 May 2026
  • REPRESENTATION - ANDREA PAVLOU Public Comment · 09 May 2026
  • REPRESENTATION - PAUL PAVLOU Public Comment · 07 May 2026
  • REPRESENTATION - SRISHTI GUPTA Public Comment · 07 May 2026
  • REPRESENTATION - MS P CHAU Public Comment · 07 May 2026
  • REPRESENTATION - ANONYMOUS Public Comment · 07 May 2026
  • REPRESENTATION - ALI CETINKAYA Public Comment · 07 May 2026
  • REPRESENTATION - PEPYS STREET RTM COMPANY LIMITED Public Comment · 07 May 2026
  • REPRESENTATION - JORIS BODEZ Public Comment · 05 May 2026
  • REPRESENTATION - DR JAYNE EVANS Public Comment · 03 May 2026
  • COMMENTS - THAMES WATER (1) Consultee Comment · 30 Apr 2026
  • COMMENTS - THAMES WATER (2) Consultee Comment · 30 Apr 2026
  • COMMENTS - TRANSPORT FOR LONDON Consultee Comment · 10 Apr 2026
  • COMMENTS - THAMES WATER Consultee Comment · 02 Apr 2026
  • COMMENTS - THAMES WATER Consultee Comment · 01 Apr 2026
  • COMMENTS - TRANSPORT FOR LONDON Consultee Comment · 30 Mar 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 25 Mar 2026
  • COMMENTS - GREATER LONDON AUTHORITY Consultee Comment · 24 Mar 2026
  • REPRESENTATION - LINDA J SKINNER Public Comment · 20 Mar 2026
  • COMMENTS - TRANSPORT FOR LONDON Consultee Comment · 19 Mar 2026
  • SITE LOCATION PLAN Site Plan · 04 Mar 2026
  • APPLICATIONFORMREDACTED Application Form · 24 Feb 2026
  • 20260220_THE MARK_S73 DAS ADDENDUM_B_COMPRESSED Report - Design & Access Statement/Report · 24 Feb 2026
  • 20260220_THE MARK_CULTURAL STRATEGY_C_COMPRESSED Other · 24 Feb 2026
  • 260220_47_MARK LANE_S73 TA ADDENDUM Report - Transport Statement/Report · 24 Feb 2026
  • THE MARK - 2026 MMA - CL (FINAL) Cover Letter · 24 Feb 2026
  • THE MARK 2026 MMA - FORM_1_CIL_ADDITIONAL_INFORMATION Other · 24 Feb 2026
  • WEST ELEVATION PROPOSED Drawing · 24 Feb 2026
  • SOUTH ELEVATION PROPOSED Drawing · 24 Feb 2026
  • EAST ELEVATION PROPOSED Drawing · 24 Feb 2026
  • BASEMENT 1 PROPOSED Drawing · 24 Feb 2026
  • 47ML-3XN-XX-XX-DR-AX-00-DRAWING REGISTER REV 12_PLANNING S73 ADDENDUM Drawings Schedule · 24 Feb 2026
  • THE MARK - SUMMARY OF S106 DEED OF VARIATION (FEB 26) Other · 24 Feb 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 121 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 47-50 Mark Lane London EC3R 5AS

    26/00134/PODC Submitted 28 Jan 2026 50 yards away

    Submission of the Utility Connection Requirements pursuant to Schedule 3 Paragraph 10.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ) as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).

    Granted 4 docs
  • 47-50 Mark Lane London EC3R 5AS

    26/00432/MDC Submitted 25 Mar 2026 50 yards away

    Submission of details of archaeological evaluation report in accordance with the Written Scheme of Investigation pursuant to condition 10 part a & b of Planning permission 24/01044/FULL dated 25.03.2025.

    Granted Conditions 7 docs
  • 47-50 Mark Lane London EC3R 5AS

    26/00423/MDC Submitted 24 Mar 2026 50 yards away

    Submission of details of Public Impact Strategy pursuant to condition 11 of Planning permission 24/01044/FULL dated 25.03.2025 wording amended via planning permission 25/01737/NMA dated 16.01.2026.

    Granted Conditions 5 docs
  • 47-50 Mark Lane London EC3R 5AS

    25/01814/MDC Submitted 24 Dec 2025 50 yards away

    Submission of enlistment to the Non-Road Mobile Machinery Register pursuant to condition 24 of planning permission 22/01245/FULMAJ dated 20 September 2023, as amended by 24/01044/FULL on 25 March 2024.

    Granted Conditions 5 docs
  • 47-50 Mark Lane London EC3R 5AS

    26/00668/MDC Submitted 8 May 2026 50 yards away

    Submission of details of LUL Demolition Ground Movement Assessment and Monitoring Action Plan pursuant to condition 16(a), (b) and (c) of Planning Permission 24/01044/FULL dated 25.03.2025.

    Granted Conditions Demolition 13 docs
  • 47-50 Mark Lane London EC3R 5AS

    25/01806/MDC Submitted 24 Dec 2025 50 yards away

    Submission of a scheme of protective works pursuant to condition 3 of planning permission 24/01044/FULL dated 25/03/2025.

    Granted Conditions 4 docs

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications