Planning application
47-50 Mark Lane London EC3R 5AS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the variation of Conditions 53 (Fire Statement), 61 (Cycle Parking), 63 (Cycle Facilities), 73 (Use class floorspace) and 74 (Approved Drawings) of planning permission reference 22/01245/FULMAJ dated 20 September 2023, as amended by 24/00941/NMA on 20 September 2024 to allow the following amendments: i) Re-configuration of proposed massing; ii) Height of Block E located at rear of the Site increased by one storey; iii) Minor internal re-configuration of ground floor uses; iv) Refinement of facade to rear block (Block E); v) Improvements to cultural offer and public access provisions
As published by the council, reference 24/01044/FULL
Application record
- Reference
- 24/01044/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 1 Oct 2024
- Validated
- 1 Oct 2024
- Decided
- 25 Mar 2025
- Ward
- Tower
- Decision by
- Delegated Decision
- Postcode
- EC3R 5AS
Timeline
Dates from the published record
-
1 Oct 2024
Received by City of London
-
25 Mar 2025
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
2,025 applications on PlanIndex · across 33 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
81 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
9 Byward Street London EC3R 5AS
Change of use of ground floor from financial and professional services (Class A2) to restaurant (Class A3) and installation of new shopfront.
Withdrawn Full applications Windows or glazing 16 docs -
47-50 Mark Lane London EC3R 5AS
24/00941/NMA - Non-material amendment under Section 96a of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01245/FULMAJ dated 20.09.2023 to allow for an amended description of development by removing reference to 'ground plus 11 storey' so that it reads as: 'Demolition of existing buildings and structures, retention of existing basement and construction of a new office led mixed use building with associated external roof terraces; hard and soft landscaping works; servicing and plant; provision of cycle storage; and ancillary works.'
Granted Amendments Demolition 4 docs -
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~7 Oct
Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 and Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).
Decided 4 docs -
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~2 Oct
Submission of details of Piling Methods Statement pursuant to condition 12 of Planning Permission 24/01044/FULL dated 25.03.2025.
Awaiting decision 4 docs -
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~7 Oct
Submission of details of Climate Resilience pursuant to condition 9 of Planning Permission 24/01044/FULL dated 25.03.2025.
Awaiting decision 3 docs -
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~6 Oct
Submission of details of Scheme of Protective Works pursuant to condition 4 of Planning Permission 24/01044/FULL dated 25.03.2025.
Awaiting decision 3 docs
Other full applications applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.