Planning application
25/01128/TTT
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Proposal
Partial discharge of Schedule 3 requirements relating to site-specific remediation strategy pursuant to BLABF 16 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
As published by the council, reference 25/01128/TTT
Timeline
Dates from the published record
-
19 Aug 2025
Received by City of London
-
9 Dec 2025
Decision issued: Approved
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that City of London is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
25/01129/FULL Granted
Blackfriars Railway Bridge Puddle Dock London
Retention of one arch closure board light and one warning light for when the Fleet overflow is discharging into the river on the eastern elevation of Blackfriars Rail Bridge.
-
25/01130/TTT Granted
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for a plaque commemorating the Kings visit onto one of the Lions Heads Piers at Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
-
25/01778/TTT Granted
Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR
Partial discharge of Schedule 3 requirement relating to detailed design approval for permanent above ground structures (minor change to the Amenity Kiosk) pursuant to BLABF 5 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
-
20/00711/TTT Granted
Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR
Partial discharge of Schedule 3 requirement relating to operational lighting pursuant to BLABF 23 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
-
25/01500/TTT Granted
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for small clips to be installed onto each Lions heads piers to hold back the ring to the Lions Head moorings at the Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
-
21/AP/0709 Decided
BY1 Development Site (former Ludgate House) Blackfriars Road London
Request for a Scoping Opinion for the proposed redevelopment of the site, involving the construction of a single building approximately 72m above ordnance datum (AOD) in height, comprising residential and retail development and associated public realm and landscaping