Planning application

Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

Granted City of London 24/01039/TTT Thames Tideway Tunnel

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial discharge of Schedule 3 requirement relating to detailed design approval for permanent above ground structures (Detailed design changes to the toilets in the undercroft) pursuant to BLABF 5 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

As published by the council, reference 24/01039/TTT

Application record

Reference
24/01039/TTT
Type
Thames Tideway Tunnel
Status
Decided
Decision
Approved
Received
30 Sep 2024
Validated
30 Sep 2024
Decided
6 Dec 2024
Ward
Castle Baynard
Decision by
Delegated Decision
Postcode
EC4Y 0DR

Site history

Applications at this address on the City of London register

This site has had 8 applications since 2022: 8 approved, 0 refused.

  • 25/01500/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for small clips to be installed onto each Lions heads piers to hold back the ring to the Lions Head moorings at the Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 27 Feb 2026
  • 25/01128/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to site-specific remediation strategy pursuant to BLABF 16 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 9 Dec 2025
  • 25/01130/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for a plaque commemorating the Kings visit onto one of the Lions Heads Piers at Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 23 Oct 2025
  • 24/00782/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs to the river wall at the western end of the site where the kiosk meets the river wall); and partial discharge of schedule 3 requirements relating to the Landscaping works pursuant to BLABF 11, BLABF 12, BLABF 13 and BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 6 Dec 2024
  • 24/00784/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 6 Dec 2024
  • 22/01126/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to approval of security measures (Hostile Vehicle Mitigation) pursuant to BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 21 Apr 2023
  • 22/00600/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to approval of details for the installation of ducts within the service subway for new utilities pursuant to BLABF 11 and BLABF 24 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 11 Jan 2023

Timeline

Dates from the published record

  1. 30 Sep 2024

    Received by City of London

  2. 6 Dec 2024

    Decision issued: Approved

  3. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

City of London granted permission on 6 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Blackfriars Bridge London EC4

    21/00040/MDC Submitted 19 Jan 2021 0m away

    Submission of details of hours of illumination pursuant to condition 9 and an Environmental Management Strategy pursuant to condition 10 of planning permission 18/00455/FULEIA dated 7th September 2018.

    Granted Conditions 8 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    24/00782/TTT Submitted 22 Jul 2024 0m away

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs to the river wall at the western end of the site where the kiosk meets the river wall); and partial discharge of schedule 3 requirements relating to the Landscaping works pursuant to BLABF 11, BLABF 12, BLABF 13 and BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 8 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    24/00784/TTT Submitted 22 Jul 2024 0m away

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 8 docs
  • Blackfriars Railway Bridge Puddle Dock London

    25/01129/FULL Submitted 19 Aug 2025 0m away

    Retention of one arch closure board light and one warning light for when the Fleet overflow is discharging into the river on the eastern elevation of Blackfriars Rail Bridge.

    Granted Full applications 12 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    25/01128/TTT Submitted 19 Aug 2025 0m away

    Partial discharge of Schedule 3 requirements relating to site-specific remediation strategy pursuant to BLABF 16 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 50 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    25/01130/TTT Submitted 19 Aug 2025 0m away

    Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for a plaque commemorating the Kings visit onto one of the Lions Heads Piers at Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 6 docs