Planning applicant

Bazalgette Tunnel Limited

Registered in London. 10 planning applications on PlanIndex across 2 councils . Named as the applicant, not the agent. On the register from 2019 to 2025.

Where they work

  1. 100% approved here, against 100% for the council

What they file

  1. Full applications100%

Company record

From Companies House. Company information only; we never show personal contact details.

Registered name
BAZALGETTE TUNNEL LIMITED
Company number
09553573
Status
Active
Incorporated
21 April 2015
Registered in
London

Track record

The 10 most recent applications naming this firm

  • 25/01778/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to detailed design approval for permanent above ground structures (minor change to the Amenity Kiosk) pursuant to BLABF 5 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 20 Feb 2026
  • 25/01500/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for small clips to be installed onto each Lions heads piers to hold back the ring to the Lions Head moorings at the Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 27 Feb 2026
  • 25/01129/FULL Granted

    Blackfriars Railway Bridge Puddle Dock London

    Retention of one arch closure board light and one warning light for when the Fleet overflow is discharging into the river on the eastern elevation of Blackfriars Rail Bridge.

    Decided 20 Feb 2026 Full applications
  • 25/01130/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for a plaque commemorating the Kings visit onto one of the Lions Heads Piers at Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 23 Oct 2025
  • 25/01128/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to site-specific remediation strategy pursuant to BLABF 16 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 9 Dec 2025
  • 24/01039/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to detailed design approval for permanent above ground structures (Detailed design changes to the toilets in the undercroft) pursuant to BLABF 5 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 6 Dec 2024
  • 24/00782/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs to the river wall at the western end of the site where the kiosk meets the river wall); and partial discharge of schedule 3 requirements relating to the Landscaping works pursuant to BLABF 11, BLABF 12, BLABF 13 and BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 6 Dec 2024
  • 24/00784/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 6 Dec 2024
  • 23/00972/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 16 Jan 2024
  • Carnwath Road Riverside Worksite London SW6

    Partial discharge of the Schedule 3 Requirements CARRR 9 (Specification of accesses (operational)) and the FULL discharge of CARRR 1 (Detailed design approval for permanent above ground structures), CARRR 5 (Landscaping works), CARRR 10 (Surface water drainage) and CARRR 11(Lighting (Operational)).

    Decided 22 Jul 2019

The full track record

Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.

See the full track record

Is this your firm? Put your record on your website


A badge with your figures from the public register, updated as new decisions come in. Paste this where you want it to appear. Click the code to select all of it.

<a href="https://planindex.co.uk/applicant/bazalgette-tunnel-limited"><img src="https://planindex.co.uk/embed/firm/bazalgette-tunnel-limited.svg" alt="Bazalgette Tunnel Limited: planning applications and approval record on PlanIndex" width="300" height="72"></a>

All the free widgets

Is this your firm? Sign in or create a free account with your work email to claim it, add a contact line and get the badge.

From council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.