Planning application
Blackfriars Bridge London EC4
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details of hours of illumination pursuant to condition 9 and an Environmental Management Strategy pursuant to condition 10 of planning permission 18/00455/FULEIA dated 7th September 2018.
As published by the council, reference 21/00040/MDC
Application record
- Reference
- 21/00040/MDC
- Type
- Submission of details (Planning)
- Status
- Decided
- Decision
- Approved
- Received
- 19 Jan 2021
- Validated
- 19 Jan 2021
- Decided
- 29 Jun 2021
- Ward
- Castle Baynard
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
19 Jan 2021
Received by City of London
-
29 Jun 2021
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
944 applications on PlanIndex · across 113 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 29 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirement relating to detailed design approval for permanent above ground structures (Detailed design changes to the toilets in the undercroft) pursuant to BLABF 5 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Granted 13 docs -
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs to the river wall at the western end of the site where the kiosk meets the river wall); and partial discharge of schedule 3 requirements relating to the Landscaping works pursuant to BLABF 11, BLABF 12, BLABF 13 and BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Granted 8 docs -
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Granted 8 docs -
Blackfriars Railway Bridge Puddle Dock London
Retention of one arch closure board light and one warning light for when the Fleet overflow is discharging into the river on the eastern elevation of Blackfriars Rail Bridge.
Granted Full applications 12 docs -
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirements relating to site-specific remediation strategy pursuant to BLABF 16 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Granted 50 docs -
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for a plaque commemorating the Kings visit onto one of the Lions Heads Piers at Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Granted 6 docs
Other condition discharge and variation applications
In City of London
-
26/00710/MDC Granted
1 Exchange Square London EC2A 2JN
Submission of ventilation details and fume extract arrangements pursuant to discharge of condition 17 of planning permission 21/00930/FULMAJ dated 14.06.2023.
-
25/01327/MDC Granted
1 New Change London EC4M 9AF
Submission of an Inclusive Access Management Plan prior to the first occupation of the development for (a) the library use (F1 use); pursuant to condition 9a of planning permission 24/00481/FULL dated 06/12/2024.
-
26/00933/MDC Granted
122 Minories And 14 Crosswall London EC3N 1NT
Submission of Circlular Economy Post Completion Report and Circular Economy Statements pursuant to discharge of Condition 23 of planning permission 22/00035/FULMAJ dated 09.08.2022.
-
26/00667/MDC Granted
9A - 9B Crutched Friars London EC3N 2AU
Submission of details of Construction Management Plan pursuant to condition 4 of Planning Permission 23/00895/FULL dated 10.05.2024.
-
25/01673/MDC Granted
54 King William Street London EC4R 9AD
Submission of details of plant noise and installation pursuant to condition 2 (part B) of planning permission 24/00504/FULL dated 03/04/2025.