Granted City of London 25/01085/FULL Full Planning Permission

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Refurbishment of the existing building for continued use as offices (Class E(g)); alterations and upwards extension to create additional office floorspace at 6th floor level and installation of a new terrace at 6th floor level; part demolition to provide new facade treatment, relocation of the main entrance and associated facilities including lift overrun and plant enclosure and all other necessary works.

As published by the council, reference 25/01085/FULL

Application record

Reference
25/01085/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
8 Aug 2025
Validated
8 Aug 2025
Decided
13 Apr 2026
Ward
Farringdon Without
Decision by
Delegated
Postcode
EC1A 9HB

Site history

Applications at this address on the City of London register

This site has had 5 applications since 2025: 5 approved, 0 refused.

  • 26/01121/PODC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 6.1 of the Section 106 Agreement dated 13 April 2026 (Planning Application Reference 25/01085/FULL).

    Decided 24 Aug 2026
  • 26/01120/PODC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of the Local Procurement Strategy, the Local Training Skills and Job Brokerage Strategy (Demolition) and the Local Training Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraphs 2.1, 3.2 and 3.5 of the Section 106 Agreement dated 13 April 2026 (Planning Application Reference 25/01085/FULL).

    Decided 24 Aug 2026
  • 26/00878/MDC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of Site Condition Survey pursuant to discharge of condition 18 of planning permission 25/01085/FULL dated 13.04.2026.

    Decided 10 Aug 2026
  • 26/00786/MDC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of details of Scheme of Protective Works, Noise, dust and vibration monitoring equipment, Non-Road Mobile Machinery Register and Demolition and Construction Logistic Plans pursuant to conditions 7, 8, 16 and 20 of Planning Permission 25/01085/FULL dated 13.04.2026.

    Decided 24 Aug 2026

Timeline

Dates from the published record

  1. 8 Aug 2025

    Received by City of London

  2. 13 Apr 2026

    Decision issued: Approved

  3. 24 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

4 later applications on the register refer to this one:

  • 26/01121/PODC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 6.1 of the Section 106 Agreement dated 13 April 2026 (Planning Application Reference 25/01085/FULL).

    Decided 24 Aug 2026
  • 26/01120/PODC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of the Local Procurement Strategy, the Local Training Skills and Job Brokerage Strategy (Demolition) and the Local Training Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraphs 2.1, 3.2 and 3.5 of the Section 106 Agreement dated 13 April 2026 (Planning Application Reference 25/01085/FULL).

    Decided 24 Aug 2026
  • 26/00878/MDC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of Site Condition Survey pursuant to discharge of condition 18 of planning permission 25/01085/FULL dated 13.04.2026.

    Decided 10 Aug 2026
  • 26/00786/MDC Granted

    2 Hosier Lane London EC1A 9HB

    Submission of details of Scheme of Protective Works, Noise, dust and vibration monitoring equipment, Non-Road Mobile Machinery Register and Demolition and Construction Logistic Plans pursuant to conditions 7, 8, 16 and 20 of Planning Permission 25/01085/FULL dated 13.04.2026.

    Decided 24 Aug 2026

Who's behind it

Company information only, from the register and Companies House

Savills Limited Agent, registered in London

Active · incorporated 1987 · London

2,477 applications on PlanIndex · across 194 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

ZCS2 Prop Limited Applicant, registered in London

Active · incorporated 2005 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

109 documents on file for this application

  • S106 AGREEMENT S106 Agreement · 13 Apr 2026
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 13 Apr 2026
  • DRAFT SECTION 106 AGREEMENT S106 Agreement · 27 Mar 2026
  • ADDENDUM TO DELEGATED REPORT Officers Report · 11 Mar 2026
  • OFFICER'S REPORT Officers Report · 20 Feb 2026
  • PROPOSED GA PLAN ROOF Drawing · 17 Feb 2026
  • PROPOSED ELEVATION NORTH Drawing · 17 Feb 2026
  • PROPOSED CONTEXT ELEVATION NORTH Drawing · 17 Feb 2026
  • PROPOSED CONTEXT ELEVATION WEST Drawing · 17 Feb 2026
  • PROPOSED SECTION BB Drawing · 17 Feb 2026
  • PROPOSED SECTION CC Drawing · 17 Feb 2026
  • PROPOSED SECTION DD Drawing · 17 Feb 2026
  • S278 HIGHWAYS WORKS AREA PLAN Drawing · 14 Jan 2026
  • TRANSPORT NOTE Correspondence In · 25 Nov 2025
  • REPRESENTATION - CAAC Public Comment · 21 Oct 2025
  • COMMENTS - FABRIC OF ST PAUL?S CATHEDRAL Consultee Comment · 23 Sep 2025
  • REPRESENTATION - JOHN JAMES Public Comment · 09 Sep 2025
  • PART 6 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • PART 7 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • PART 8 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • PART 1 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • PART 2 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • PART 3 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • PART 4 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • PART 5 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 08 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 01 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 01 Sep 2025
  • PART 2 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PART 6 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PART 7 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PART 8 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PART 1 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PART 3 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PART 4 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PART 5 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 26 Aug 2025
  • PLANNING STATEMENT Report - Planning Statement/Report · 08 Aug 2025
  • DEMOLITION BASEMENT Drawing · 08 Aug 2025
  • DEMOLITION LGF Drawing · 08 Aug 2025
  • DEMOLITION 3F Drawing · 08 Aug 2025
  • DEMOLITION 5F Drawing · 08 Aug 2025
  • DEMOLITION ELEVATION NORTH Drawing · 08 Aug 2025
  • PROPOSED 2F Drawing · 08 Aug 2025
  • PROPOSED 3F Drawing · 08 Aug 2025
  • PROPOSED 4F Drawing · 08 Aug 2025
  • PROPOSED 5F Drawing · 08 Aug 2025
  • PROPOSED 6F Drawing · 08 Aug 2025
  • PROPOSED ROOF Drawing · 08 Aug 2025
  • EXISTING ELEVATION NORTH Drawing · 08 Aug 2025
  • EXISTING ELEVATION WEST Drawing · 08 Aug 2025
  • EXISTING ELEVATION SOUTH Drawing · 08 Aug 2025
  • PROPOSED ELEVATION NORTH Drawing · 08 Aug 2025
  • PROPOSED ELEVATION WEST AND NORTH WEST Drawing · 08 Aug 2025
  • PROPOSED ELEVATION SOUTH Drawing · 08 Aug 2025
  • APPLICATIONFORMREDACTED Application Form · 08 Aug 2025
  • CIL FORM Other · 08 Aug 2025
  • COVER LETTER Cover Letter · 08 Aug 2025
  • P4098_2 HOSIER LANE_DLSL REPORT_JUL 25_R1D4 Accompanying report · 08 Aug 2025
  • 3469-HTS-ZZ-ZZ-RP-0003-SUDS REPORT Accompanying report · 08 Aug 2025
  • 3469-HTS-ZZ-ZZ-RP-0002-FRA_COMPRESSED Accompanying report · 08 Aug 2025
  • 94292_DSP_REVB_FINAL Other · 08 Aug 2025
  • 94292_TS_REVB_FINAL Report - Transport Statement/Report · 08 Aug 2025
  • 94292_HOSIERROAD_EC_REVA_FINAL Other · 08 Aug 2025
  • 94292_CEMP_REVD_FINAL Other · 08 Aug 2025
  • 2 HOSIER LANE - SCI Other · 08 Aug 2025
  • 250725DN00F2-P25-065_2 HOSIER LANE_FIRE STATEMENT Other · 08 Aug 2025
  • 3469-HTS-ZZ-ZZ-RP-0001-STRUCTURAL SURVEY REPORT Accompanying report · 08 Aug 2025
  • 250807_HTVIA_2_HOSIER_LANE_F Accompanying report · 08 Aug 2025
  • EPC RATING Accompanying report · 08 Aug 2025
  • ENERGY AND SUSTAINABILITY_COMPRESSED-1-25 Accompanying report · 08 Aug 2025
  • ENERGY AND SUSTAINABILITY_COMPRESSED-26-50 Accompanying report · 08 Aug 2025
  • 250807 - 2 HOSIER LANE DAS_PART1 Report - Design & Access Statement/Report · 08 Aug 2025
  • 250807 - 2 HOSIER LANE DAS_PART2 Report - Design & Access Statement/Report · 08 Aug 2025
  • 250807 - 2 HOSIER LANE DAS_PART3 Report - Design & Access Statement/Report · 08 Aug 2025
  • 250807 - 2 HOSIER LANE DAS_PART4 Report - Design & Access Statement/Report · 08 Aug 2025
  • 250807 - 2 HOSIER LANE DAS_PART5 Report - Design & Access Statement/Report · 08 Aug 2025
  • 250807 - 2 HOSIER LANE DAS_PART7 Report - Design & Access Statement/Report · 08 Aug 2025
  • 026311-R01-A NOISE IMPACT ASSESSMENT Report - Acoustic/Noise Report · 08 Aug 2025
  • 4898-STA-XX-XXXX-DR-A-00101 Site Plan · 08 Aug 2025
  • SITE PLAN Site Plan · 08 Aug 2025
  • EXISTING BASEMENT Drawing · 08 Aug 2025
  • EXISTING LGF Drawing · 08 Aug 2025
  • EXISTING GF Drawing · 08 Aug 2025
  • EXISTING 1F Drawing · 08 Aug 2025
  • EXISTING 2F Drawing · 08 Aug 2025
  • EXISTING 3F Drawing · 08 Aug 2025
  • EXISTING 4F Drawing · 08 Aug 2025
  • EXISTING 5F Drawing · 08 Aug 2025
  • EXISTING ROOF Drawing · 08 Aug 2025
  • DEMOLITION GF Drawing · 08 Aug 2025
  • DEMOLITION 1F Drawing · 08 Aug 2025
  • DEMOLITION 2F Drawing · 08 Aug 2025
  • DEMOLITION 4F Drawing · 08 Aug 2025
  • DEMOLITION ROOF Drawing · 08 Aug 2025
  • DEMOLITION SECTION AA Drawing · 08 Aug 2025
  • DEMOLITION SECTION BB Drawing · 08 Aug 2025
  • DEMOLITION ELEVATION WEST Drawing · 08 Aug 2025
  • DEMOLITION ELEVATION SOUTH Drawing · 08 Aug 2025
  • PROPOSED BASEMENT Drawing · 08 Aug 2025
  • PROPOSED LGF Drawing · 08 Aug 2025
  • PROPOSED GF Drawing · 08 Aug 2025
  • PROPOSED 1F Drawing · 08 Aug 2025
  • PROPOSED ELEVATION CONTEXT - NORTH Drawing · 08 Aug 2025
  • PROPOSED ELEVATION CONTEXT - SOUTH Drawing · 08 Aug 2025
  • EXISTING SECTION AA Drawing · 08 Aug 2025
  • EXISTING SECTION BB Drawing · 08 Aug 2025
  • PROPOSED SECTION AA Drawing · 08 Aug 2025
  • PROPOSED SECTION BB Drawing · 08 Aug 2025
  • PROPOSED SECTION CC Drawing · 08 Aug 2025
  • PROPOSED SECTION DD Drawing · 08 Aug 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 13 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Jarvis House 12 Smithfield Street London EC1A 9LA

    25/01062/FULL Submitted 4 Aug 2025 50 yards away

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme).

    Granted Full applications Extension Demolition 200 docs
  • Jarvis House 12 Smithfield Street London EC1A 9LA

    26/01415/MDC Submitted 6 Oct 2026 50 yards away

    99% historically approved · decision due ~1 Dec

    Submission of Air Quality Report and Memo pursuant to condition 7 of planning permission 25/01062/FULL dated 17.07.2026.

    Awaiting decision
  • Jarvis House, 12 Smithfield Street, London, EC1A 9LA

    P2025/2625/OBS Submitted 16 Sep 2025 50 yards away

    Observations to adjoining borough in relation to application ref: 25/01062/FULL at Jarvis House 12 Smithfield Street London EC1A 9LA for, 'Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar).'

    Decided Extension Demolition 2 docs
  • Jarvis House 12 Smithfield Street London EC1A 9LA

    26/1273/K Submitted 22 Apr 2026 50 yards away

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme)

    Granted Outline Extension Demolition 2 docs
  • Jarvis House 12 Smithfield Street London EC1A 9LA

    25/2980/K Submitted 8 Sep 2025 50 yards away

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar).

    Granted Outline Extension Demolition 2 docs
  • Jarvis House 12 Smithfield Street London EC1A 9LA

    P2026/1101/OBS Submitted 22 Apr 2026 50 yards away

    91% historically approved · decision due ~17 Jun

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme)[25/01062/FULL].

    Awaiting decision Extension Demolition

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications