Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00878/MDC

2 Hosier Lane London EC1A 9HB

Awaiting decision City of London Submission of details (Planning)

Proposal

Submission of Site Condition Survey pursuant to discharge of condition 18 of planning permission 25/01085/FULL dated 13.04.2026.

As published by the council, reference 26/00878/MDC

Timeline

Dates from the published record

  1. 18 Jun 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 26/00786/MDC Awaiting decision

    2 Hosier Lane London EC1A 9HB

    Submission of details of Scheme of Protective Works, Noise, dust and vibration monitoring equipment, Non-Road Mobile Machinery Register and Demolition and Construction Logistic Plans pursuant to conditions 7, 8, 16 and 20 of Planning Permission 25/01085/FULL dated 13.04.2026.

    29 May 2026 0m away Conditions
  • 25/01085/FULL Granted

    2 Hosier Lane London EC1A 9HB

    Refurbishment of the existing building for continued use as offices (Class E(g)); alterations and upwards extension to create additional office floorspace at 6th floor level and installation of a new terrace at 6th floor level; part demolition to provide new facade treatment, relocation of the main entrance and associated facilities including lift overrun and plant enclosure and all other necessary works.

    8 Aug 2025 0m away Full applications
  • P2026/1101/OBS Awaiting decision

    Jarvis House 12 Smithfield Street London EC1A 9LA

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme)[25/01062/FULL].

    22 Apr 2026 59m away
  • 25/01062/FULL Granted

    Jarvis House 12 Smithfield Street London EC1A 9LA

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme).

    4 Aug 2025 61m away Full applications
  • PA/25/01819/NC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Observation requested by City of London for retention of additional plant at main roof level and proposed erection of enclosure to units (part retrospective).

    9 Oct 2025 64m away
  • 25/07343/OBS Decided

    Snow Hill Police Station 5 Snow Hill City Of London London EC1A 2DJ

    Retention of additional plant at main roof level and proposed erection of enclosure to units (part retrospective).

    9 Oct 2025 64m away

In City of London

  • 26/00993/MDC Granted

    55 And 65 Old Broad Street London EC2M 1RX

    Submission of Construction Logistics Plan pursuant to discharge of Condition 8 of planning permission 23/00469/FULEIA dated 19.12.2024.

    13 Jul 2026 Conditions
  • 26/00776/MDC Granted

    Faryners House 25 Monument Street London EC3R 8BQ

    Submission of details of Site Condition Survey pursuant to condition 23 of Planning Permission 24/00535/FULL dated 24.04.2026.

    28 May 2026 Conditions
  • 26/00808/MDC Granted

    Tenter House 45 Moorfields London EC2Y 9AE

    Submission of details of a Piling Method Statement pursuant to conditions 73 and 75 of Planning permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    3 Jun 2026 Conditions
  • 26/00898/MDC Granted

    55 And 65 Old Broad Street London EC2M 1RX

    Submission of Infrastructure Protection Details pursuant to Condition 38 of Planning Permission 23/00469/FULEIA dated 19.12.2024.

    23 Jun 2026 Conditions
  • 26/00896/MDC Granted

    Poultry Market And General Market And The Annexe Buildings West Smithfield London EC1A 9PS

    Submission of details of fume extract arrangement, ventilation and kitchen extract arrangements pursuant to condition 33 and 34 of Planning Permission 19/01343/FULEIA dated 13.04.2023.

    23 Jun 2026 Conditions