Skip to content
PlanIndex Get alerts
Menu

Planning application

Jarvis House 12 Smithfield Street London EC1A 9LA

Granted City of London 25/01062/FULL Full applications

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme).

As published by the council, reference 25/01062/FULL

Application record

Reference
25/01062/FULL
Category
Full applications
Status
Decided
Decision
Granted As published: Approved
Received
4 Aug 2025
Validated
29 Aug 2025
Decided
17 Jul 2026
Ward
Farringdon Without
Decision by
Delegated
Postcode
EC1A 9LA

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 26/01415/MDC Awaiting decision

    Jarvis House 12 Smithfield Street London EC1A 9LA

    Submission of Air Quality Report and Memo pursuant to condition 7 of planning permission 25/01062/FULL dated 17.07.2026.

    Submitted 6 Oct 2026

Timeline

Dates from the published record

  1. 4 Aug 2025

    Received by City of London

  2. 29 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jul 2026

    Decision issued: Approved

  4. 24 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/01415/MDC Awaiting decision

    Jarvis House 12 Smithfield Street London EC1A 9LA

    Submission of Air Quality Report and Memo pursuant to condition 7 of planning permission 25/01062/FULL dated 17.07.2026.

    Submitted 6 Oct 2026

Who's behind it

Company information only, from the register and Companies House

Montagu Evans LLP Agent, registered in London

Active · incorporated 2005 · London

1,347 applications on PlanIndex · across 131 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

12 Smithfield Nominee No.2 Limited Applicant, registered in London

Active · incorporated 2007 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

200 documents on file for this application

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 17 Jul 2026
  • PROPOSED NORTH WEST ELEVATION Drawing · 19 Jun 2026
  • PROPOSED EAST ELEVATION Drawing · 19 Jun 2026
  • PROPOSED SOUTH ELEVATION Drawing · 19 Jun 2026
  • PROPOSED GROUND FLOOR PLAN Drawing · 19 Jun 2026
  • OUTLINE CYCLE PROMOTION PLAN Accompanying report · 19 Jun 2026
  • OUTLINE DELIVERY AND SERVICING PLAN ADDENDUM Accompanying report · 19 Jun 2026
  • TRANSPORT STATEMENT ADDENDUM Accompanying report · 19 Jun 2026
  • DRAWING REGISTER AND RECORD Drawings Schedule · 19 Jun 2026
  • HIGHWAY IMPROVEMENT PLAN Drawing · 19 Jun 2026
  • EXISTING HIGHWAY BOUNDARY PLAN Drawing · 19 Jun 2026
  • OVERSAILING PLAN (STRUCTURAL) Drawing · 19 Jun 2026
  • PLANNING STATEMENT Report - Planning Statement/Report · 19 Jun 2026
  • WHOLE LIFE CYCLE CARBON ASSESSMENT Other · 02 Jun 2026
  • CIRCULAR ECONOMY STATEMENT Other · 02 Jun 2026
  • ENERGY STATEMENT Other · 02 Jun 2026
  • SUICIDE PREVENTION NOTE Other · 15 May 2026
  • COMMENTS - SURVEYOR TO THE FABRIC OF ST PAUL?S CATHEDRAL Consultee Comment · 12 May 2026
  • CAAC LETTER Consultee Comment · 12 May 2026
  • COMMENTS - SOUTHWARK COUNCIL Consultee Comment · 07 May 2026
  • COMMENTS - ROYAL BOROUGH OF GREENWICH Consultee Comment · 06 May 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 05 May 2026
  • HISTORIC ENGLAND Consultee Comment · 22 Apr 2026
  • EMAIL - AGENT Correspondence In · 20 Apr 2026
  • CIL FORM Other · 02 Apr 2026
  • EXISTING SOUTH ELEVATION DEMOLITION Drawing · 02 Apr 2026
  • EXISTING EAST ELEVATION DEMOLITION Drawing · 02 Apr 2026
  • DEMOLITION ROOF PLAN Drawing · 02 Apr 2026
  • DEMOLITION FIFTH FLOOR PLAN Drawing · 02 Apr 2026
  • DEMOLITION FOURTH FLOOR PLAN Drawing · 02 Apr 2026
  • DEMOLITION THIRD FLOOR PLAN Drawing · 02 Apr 2026
  • DEMOLITION SECOND FLOOR PLAN Drawing · 02 Apr 2026
  • DEMOLITION FIRST FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED SOUTH ELEVATION Drawing · 02 Apr 2026
  • PROPOSED EAST ELEVATION Drawing · 02 Apr 2026
  • PROPOSED NORTH WEST ELEVATION Drawing · 02 Apr 2026
  • PROPOSED UPPER ROOF PLAN Drawing · 02 Apr 2026
  • PROPOSED ROOF PLAN Drawing · 02 Apr 2026
  • PROPOSED FIFTH FLOOR PLAN Drawing · 02 Apr 2026
  • SITE PLAN Site Plan · 02 Apr 2026
  • SITE LOCATION PLAN Site Plan · 02 Apr 2026
  • DRAWINGS SCHEDULE Drawings Schedule · 02 Apr 2026
  • PLANNING STATEMENT Report - Planning Statement/Report · 02 Apr 2026
  • SUICIDE PREVENTION NOTE Other · 02 Apr 2026
  • DESIGN AND ACCESS STATEMENT Report - Design & Access Statement/Report · 02 Apr 2026
  • HTVIA Accompanying report · 02 Apr 2026
  • HTVIA Accompanying report · 02 Apr 2026
  • SURFACE WATER DRAINAGE STRATEGY Accompanying report · 02 Apr 2026
  • CIRCULAR ECONOMY STATEMENT Accompanying report · 02 Apr 2026
  • WHOLE LIFE CARBON Accompanying report · 02 Apr 2026
  • ENERGY Accompanying report · 02 Apr 2026
  • SUSTAINABILITY Accompanying report · 02 Apr 2026
  • NOISE Report - Acoustic/Noise Report · 02 Apr 2026
  • BREEAM Accompanying report · 02 Apr 2026
  • BNG Accompanying report · 02 Apr 2026
  • LANDSCAPE DAS Other · 02 Apr 2026
  • GA HARDWORKS Drawing · 02 Apr 2026
  • SOFT LANDSCAPE PLAN Drawing · 02 Apr 2026
  • UGF PLAN Drawing · 02 Apr 2026
  • TYPICAL DETAILS - SOFTWORKS Drawing · 02 Apr 2026
  • AIR QUALITY ASSESSMENT Accompanying report · 02 Apr 2026
  • DEMOLITION GROUND FLOOR PLAN Drawing · 02 Apr 2026
  • DEMOLITION BASEMENT FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING EAST ELEVATION Drawing · 02 Apr 2026
  • EXISTING SOUTH ELEVATION Drawing · 02 Apr 2026
  • EXISTING NORTH WEST ELEVATION Drawing · 02 Apr 2026
  • EXISTING UPPER ROOF PLAN Drawing · 02 Apr 2026
  • EXISTING ROOF PLAN Drawing · 02 Apr 2026
  • EXISTING FOURTH FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED SECTION A-A Drawing · 02 Apr 2026
  • TS ADDENDUM Report - Transport Statement/Report · 02 Apr 2026
  • DSP Report - Transport Statement/Report · 02 Apr 2026
  • DS Report - Daylight/Sunlight Report · 02 Apr 2026
  • SUICIDE PREVENTION NOTE LO RES Other · 02 Apr 2026
  • GENERAL ARRANGEMENT Drawing · 02 Apr 2026
  • HHBR AMENDMENTS Other · 02 Apr 2026
  • DOCUMENT SCHEDULE Other · 02 Apr 2026
  • COVER LETTER Cover Letter · 02 Apr 2026
  • APPLICATIONFORM V2 Application Form · 02 Apr 2026
  • EXISTING NORTH WEST ELEVATION DEMOLITION Drawing · 02 Apr 2026
  • DEMOLITION SUB BASEMENT FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING FIFTH FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING THIRD FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING SECOND FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING FIRST FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING GROUND FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING BASEMENT FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING SUB-BASEMENT FLOOR PLAN Drawing · 02 Apr 2026
  • EXISTING SECTION B-B Drawing · 02 Apr 2026
  • EXISTING SECTION A-A Drawing · 02 Apr 2026
  • PROPOSED FOURTH FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED THIRD FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED SECOND FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED FIRST FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED GROUND FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED BASEMENT FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED SUB-BASEMENT FLOOR PLAN Drawing · 02 Apr 2026
  • PROPOSED LOGGIA SECTION AA Drawing · 02 Apr 2026
  • PROPOSED SECTION B-B Drawing · 02 Apr 2026
  • TYPICAL DETAILS - HARDWORKS Drawing · 02 Apr 2026
  • COMMENTS - LONDON BOROUGH OF ISLINGTON Consultee Comment · 19 Nov 2025
  • REPRESENTATION-ALISTAIR SUBBA ROW Public Comment · 11 Nov 2025
  • APPLICANT'S RESPONSE Correspondence In · 29 Oct 2025
  • AIR QUALITY ASSESSMENT Accompanying report · 28 Oct 2025
  • DAYLIGHT & SUNLIGHT REPORT Report - Daylight/Sunlight Report · 16 Oct 2025
  • COMMENTS - LONDON BOROUGH OF ISLINGTON Consultee Comment · 15 Oct 2025
  • COMMENTS - SURVEYOR TO THE FABRIC OF ST PAUL'S Consultee Comment · 14 Oct 2025
  • COMMENTS - CAAC LETTER Consultee Comment · 11 Oct 2025
  • COMMENTS - SOUTHWARK COUNCIL Consultee Comment · 02 Oct 2025
  • FLOOR AREAS Other · 29 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 26 Sep 2025
  • DEMOLITION BASEMENT FLOOR PLAN Drawing · 25 Sep 2025
  • APPENDIX A DRAWING PLANS Report - Design & Access Statement/Report · 25 Sep 2025
  • DRI/01 Drawings Schedule · 25 Sep 2025
  • DEMOLITION THIRD FLOOR PLAN Drawing · 25 Sep 2025
  • DEMOLITION FIRST FLOOR PLAN Drawing · 25 Sep 2025
  • EXISTING SECTION A-A DEMOLITION Drawing · 25 Sep 2025
  • PROPOSED NORTH WEST ELEVATION Drawing · 25 Sep 2025
  • EXISTING NORTH WEST ELEVATION Drawing · 25 Sep 2025
  • PROPOSED SOUTH ELEVATION Drawing · 25 Sep 2025
  • DEMOLITION ROOF PLAN Drawing · 25 Sep 2025
  • EXISTING SECTION A-A Drawing · 25 Sep 2025
  • EXISTING UPPER ROOF PLAN Drawing · 25 Sep 2025
  • PROPOSED SECTION B-B Drawing · 25 Sep 2025
  • EXISTING EAST ELEVATION Drawing · 25 Sep 2025
  • DEMOLITION SUB BASEMENT FLOOR PLAN Drawing · 25 Sep 2025
  • DEMOLITION FOURTH FLOOR PLAN Drawing · 25 Sep 2025
  • DEMOLITION SECOND FLOOR PLAN Drawing · 25 Sep 2025
  • DEMOLITION GROUND FLOOR PLAN Drawing · 25 Sep 2025
  • PROPOSED EAST ELEVATION Drawing · 25 Sep 2025
  • DAS Report - Design & Access Statement/Report · 25 Sep 2025
  • PROPOSED UPPER ROOF PLAN Drawing · 25 Sep 2025
  • EXISTING SECTION B-B DEMOLITION Drawing · 25 Sep 2025
  • PROPOSED SECTION A-A Drawing · 25 Sep 2025
  • DEMOLITION FIFTH FLOOR PLAN Drawing · 25 Sep 2025
  • EXISTING SECTION B-B Drawing · 25 Sep 2025
  • PROPOSED ROOF PLAN Drawing · 25 Sep 2025
  • EXISTING SOUTH ELEVATION Drawing · 25 Sep 2025
  • PROPOSED Drawings Schedule · 25 Sep 2025
  • EXISTING Drawings Schedule · 25 Sep 2025
  • DEMOLITION Drawings Schedule · 25 Sep 2025
  • COMMENTS - ROYAL BOROUGH OF GREENWICH Consultee Comment · 18 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 17 Sep 2025
  • COMMENTS - LONDON BOROUGH OF CAMDEN Consultee Comment · 15 Sep 2025
  • 25.07.29 COVER LETTER - 12 SMITHFIELD Cover Letter · 04 Aug 2025
  • 29.07.2025 FORM_1_CIL_ADDITIONAL_INFORMATION Other · 04 Aug 2025
  • 92305-HHB-000-001-DR-A-001100-A3-C01 Site Plan · 04 Aug 2025
  • SITE PLAN Site Plan · 04 Aug 2025
  • EXISTING SUB-BASEMENT FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING BASEMENT FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING GROUND FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING FIRST FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING SECOND FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING THIRD FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING FOURTH FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING FIFTH FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING ROOF PLAN Drawing · 04 Aug 2025
  • E XISTIN G N ORTH WEST ELEV ATIO N DEM OLITIO N Drawing · 04 Aug 2025
  • E XISTIN G SO UTH ELEV ATIO N DEM OLITIO N Drawing · 04 Aug 2025
  • E XISTIN G E AST ELEV ATIO N DEM OLITIO N Drawing · 04 Aug 2025
  • PROPOSED SUB-BASEMENT FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED BASEMENT FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED GROUND FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED FIRST FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED SECOND FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED THIRD FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED FOURTH FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED FIFTH FLOOR PLAN Drawing · 04 Aug 2025
  • PROPOSED ROOF PLAN Drawing · 04 Aug 2025
  • 9_2305-HHB-000-0000-RP-A-051010 Drawings Schedule · 04 Aug 2025
  • PLANNING STATEMENT 12 SMITHFIELD 25.07.25 Report - Planning Statement/Report · 04 Aug 2025
  • 09. DOCUMENT SCHEDULE Other · 04 Aug 2025
  • 9_2305_DESIGN AND ACCESS STATEMENT_PART1 Report - Design & Access Statement/Report · 04 Aug 2025
  • 9_2305_DESIGN AND ACCESS STATEMENT_PART 2 Report - Design & Access Statement/Report · 04 Aug 2025
  • 9_2305_DESIGN AND ACCESS STATEMENT_PART 3 Report - Design & Access Statement/Report · 04 Aug 2025
  • 9_2305_DESIGN AND ACCESS STATEMENT_PART 4 Report - Design & Access Statement/Report · 04 Aug 2025
  • 2507_12 SMITHFIELD STREET_HTVIA_LR Accompanying report · 04 Aug 2025
  • 2507_12 SMITHFIELD STREET_HTVIA_LR_APPENDICES Accompanying report · 04 Aug 2025
  • OUTLINE FIRE SAFETY STATEMENT Other · 04 Aug 2025
  • 3638-EVE-00-XX-C-0001 REV C SURFACE WATER DRAINAGE STRATEGY Other · 04 Aug 2025
  • CIRCULAR ECONOMY STATEMENT Other · 04 Aug 2025
  • WHOLE LIFE CYCLE CARBON ASSESSMENT Other · 04 Aug 2025
  • ENERGY STATEMENT Other · 04 Aug 2025
  • SUSTAINABILITY STATEMENT Accompanying report · 04 Aug 2025
  • 1015421-HLE-AC-RP-NOISE IMPACT ASSESSMENT-REV01 Report - Acoustic/Noise Report · 04 Aug 2025
  • BREEAM PRE-ASSESSMENT Other · 04 Aug 2025
  • 794-ENV-ECO-20906 - 12 SMITHFIELD - BIODIVERSITY NET GAIN ASSESSMENT V2 Other · 04 Aug 2025
  • 12 SMITHFIELD TS Report - Transport Statement/Report · 04 Aug 2025
  • 12 SMITHFIELD CPP Report - Transport Statement/Report · 04 Aug 2025
  • 12 SMITHFIELD STREET DSP Other · 04 Aug 2025
  • CONSTRUCTION MANAGEMENT PLAN - 12 SMITHFIELD STREET - REVISION 1 - 13 JUN 25 Other · 04 Aug 2025
  • 12SMTHSCI-MAY25 Other · 04 Aug 2025
  • 6179-250618-KPDS-DS-REVA Report - Daylight/Sunlight Report · 04 Aug 2025
  • 9_2305_SUICIDE PREVENTION NOTE_S3_C01 Other · 04 Aug 2025
  • 8474-LANDSCAPE DAS-0001 Report - Design & Access Statement/Report · 04 Aug 2025
  • ROOF PLAN GA Drawing · 04 Aug 2025
  • GENERAL ARRANGEMENT PLAN ROOF LEVEL - HARD MATERIALS Drawing · 04 Aug 2025
  • GENERAL ARRANGEMENT PLAN ROOF LEVEL - URBAN GREENING FACTOR Drawing · 04 Aug 2025
  • PLANTING PLAN ROOF LEVEL Drawing · 04 Aug 2025
  • AREASCHEDULEPLANNING-PROPOSED Other · 04 Aug 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 17 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Jarvis House 12 Smithfield Street London EC1A 9LA

    26/01415/MDC Submitted 6 Oct 2026 50 yards away

    99% historically approved · decision due ~1 Dec

    Submission of Air Quality Report and Memo pursuant to condition 7 of planning permission 25/01062/FULL dated 17.07.2026.

    Awaiting decision
  • Jarvis House 12 Smithfield Street London EC1A 9LA

    26/1273/K Submitted 22 Apr 2026 50 yards away

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme)

    Granted Outline Extension Demolition 2 docs
  • Jarvis House 12 Smithfield Street London EC1A 9LA

    25/2980/K Submitted 8 Sep 2025 50 yards away

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar).

    Granted Outline Extension Demolition 2 docs
  • Jarvis House 12 Smithfield Street London EC1A 9LA

    P2026/1101/OBS Submitted 22 Apr 2026 50 yards away

    91% historically approved · decision due ~17 Jun

    Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar) (revised scheme)[25/01062/FULL].

    Awaiting decision Extension Demolition
  • Jarvis House, 12 Smithfield Street, London, EC1A 9LA

    P2025/2625/OBS Submitted 16 Sep 2025 50 yards away

    Observations to adjoining borough in relation to application ref: 25/01062/FULL at Jarvis House 12 Smithfield Street London EC1A 9LA for, 'Partial demolition, infill extension to the building at 5th floor fronting Smithfield Street, new facade to Smithfield Street, recladding of east elevation, replacement plant and new terrace at roof level together with new landscaping, alterations to car parking and cycle provision, and other associated works, all in connection with continued use of the part basement, ground, first to fifth floors of the building for Class E purposes and the proposed flexible dual use of part of the ground floor and basement for Class E / Sui Generis (Bar).'

    Decided Extension Demolition 2 docs
  • 2 Hosier Lane London EC1A 9HB

    25/01085/FULL Submitted 8 Aug 2025 50 yards away

    Refurbishment of the existing building for continued use as offices (Class E(g)); alterations and upwards extension to create additional office floorspace at 6th floor level and installation of a new terrace at 6th floor level; part demolition to provide new facade treatment, relocation of the main entrance and associated facilities including lift overrun and plant enclosure and all other necessary works.

    Granted Full applications Extension Demolition 109 docs

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications