Planning application

21 Lombard Street London EC3V 9AH

Granted City of London 24/00126/FULMAJ Full Major Application

Works: Extension Roofing Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part demolition, infilling, extension and alterations to the existing building to provide additional Class E floorspace , comprising (i) part demolition of the south west corner, (ii) an infill extension between floors 3 to 7, (iii) the demolition of the existing roof plant and upper storey and introduction of a two storey extension plus new roof plant enclosure, (iv) external alterations including facade replacement in part, (v) a new entrance on Lombard Street and a new entrance and pedestrian vestibule at the corner of King William Street and Abchurch Lane, (vi) upgrade works to Nicholas Passage, (vii) the creation of terraces and landscaping, (viii) revised servicing, (ix) cycle parking and end of trip facilities, and (x) all associated works.

As published by the council, reference 24/00126/FULMAJ

Application record

Reference
24/00126/FULMAJ
Type
Full Major Application
Status
Decided
Decision
Approved
Received
5 Feb 2024
Validated
5 Feb 2024
Decided
27 Feb 2025
Ward
Candlewick
Decision by
Delegated Decision
Postcode
EC3V 9AH

Timeline

Dates from the published record

  1. 5 Feb 2024

    Received by City of London

  2. 27 Feb 2025

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

479 applications on PlanIndex · across 25 councils · 98% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

136 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Lombard Street London EC3V 9AH

    25/01111/FULMAJ Submitted 14 Aug 2025 18m away

    99% historically approved · decision due ~13 Nov

    An application submitted under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 26 (revolving door), condition 31 (Cycle parking), condition 34 (End of Trip Facilities), Condition 44 (Waste Storage), Condition 45 (Approved Floor Space), Condition 46 (Access Management Plan) and condition 47 (Approved Plans) of planning permission 24/00126/FULMAJ dated 27 February 2025 to incorporate minor material amendments comprising: (i) alterations to the ground floor and public realm; (ii) insertion of a drum door entrance; (iii) alterations to the Nicholas Lane entrance, (iv) alterations to the loading bay arrangement; (v) alterations to the Gatehouse, (vi) alterations to the massing and upper floors including revised façade articulation; (vii) revised roof terrace access and planter access; and (viii) all associated works.

    Awaiting decision Full applications 168 docs
    Major scheme
  • 68 Lombard Street London EC3V 9LJ

    26/00798/MDC Submitted 2 Jun 2026 22m away

    99% historically approved · decision due ~28 Jul

    Submission of details of Emergency Power Supply and Energy and Sustainability Report pursuant to conditions 12 and 13 of Planning Permission 24/01354/FULL dated 31.10.2025.

    Awaiting decision 4 docs
  • 67 Lombard Street London EC3V 9LJ

    26/01231/MDC Submitted 31 Aug 2026 22m away

    99% historically approved · decision due ~26 Oct

    Submission of a site condition survey pursuant to Condition 3 of Planning Permission 25/01761/FULL dated 15.06.2026.

    Awaiting decision
  • 68 Lombard Street London EC3V 9LJ

    25/01595/NMA Submitted 14 Nov 2025 36m away

    Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 24/01354/FULL dated 31 October 2025 to: (i) delete Condition 11 (Ground Movement Assessment); (ii) amend Condition 6(b) (Circular Economy) and Condition 7 (Whole Life Cycle Carbon) to alter the trigger points; and (iii) amend Condition 46 (Approved Drawings) to enable design amendments to the approved scheme involving removal of the consented lightwell; increased number of windows; amendments to refuse and cycle storage areas, increase in lift overrun height; reduced green roof and blue roof areas; and Level 12 adjustments to louvers, panels, doors, windows, and roof.

    Granted Amendments Windows or glazing 31 docs
  • 68 Lombard Street London EC3V 9LJ

    26/00609/MDC Submitted 24 Apr 2026 36m away

    100% historically approved · decision due ~19 Jun

    Submission of response to condition requirements (SuDs) pursuant to condition 10 of Planning Permission 24/01354/FULL dated 31.10.2025.

    Awaiting decision Conditions 4 docs
  • 68 Lombard Street London EC3V 9LJ

    26/00566/MDC Submitted 20 Apr 2026 36m away

    100% historically approved · decision due ~15 Jun

    Submission of details of Updated Urban Greening Factor Assessment pursuant to condition 23 of Planning Permission 24/01354/FULL dated 31.10.2025.

    Awaiting decision Conditions 3 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications