Planning application
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of a First Interference Survey pursuant to Schedule 3, Paragraph 17.1 of the Section 106 Agreement dated 7 February 2022 relating to planning permission reference 21/00755/FULMAJ.
As published by the council, reference 23/00055/PODC
Application record
- Reference
- 23/00055/PODC
- Type
- Planning Obligations
- Status
- Decided
- Decision
- Approved
- Received
- 17 Jan 2023
- Validated
- 17 Jan 2023
- Decided
- 10 Feb 2023
- Ward
- Farringdon Within
- Decision by
- Delegated Decision
- Postcode
- EC1A 2AT
Site history
Applications at this address on the City of London register
This site has had 28 applications since 2022: 18 approved, 0 refused.
-
26/01135/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Air Quality Statement pursuant to discharge of condition 32 of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/01105/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of artwork and heritage interpretation panels and signage pursuant to condition 30 of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/01090/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Pre and post Condition survey of LU/TfL Assets pursuant to condition 58 (part 4) of planning permission 21/00755/FULMAJ dated 07/02/2022.
-
26/01072/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of the SuDS infrastructure and its lifetime maintenance, pursuant to condition 19 of planning permission 21/00755/FULMAJ dated 07/02/2022.
-
26/00586/PODC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of the Local Procurement Strategy Final Report pursuant to Schedule 3 Paragraph 2.8 of the S106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV.
-
26/00356/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of proposed PV panels and technical specification pursuant to condition 29 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00141/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of green and blue roofs pursuant to condition 23 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00143/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of: particulars and samples of (i) green walls including supporting structure (ii) type and volume of growing medium, (iii) planting, including species and varieties, (iv) method of irrigation, (v)maintenance regime, (vi) junctions with adjacent vertical surfaces; (vii) vertical greening including species, (vii) supporting structure, (viii) method of fixing, (ix) growing medium and (x) method of irrigation pursuant to condition 22(part O) and condition 31 (part L) of planning permission 21/00755/FULMAJ dated 07.02.2022.
-
26/00092/PODC Granted
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Local Procurement monitoring report pursuant to Schedule 3 Paragraph 2.7 of the S106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV
-
25/00982/MDC Awaiting decision
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of plans, details, schedules and specifications pursuant to discharge of condition 28 and condition 31 (a) the position, size and types of planting of the green roof, its method of irrigation; (d) Soil including details of the type and depths of soil and substrates; (e) Species and selection of trees including details of its their age, growing habit, girth of trunk, how many times transplanted, root development; (f) Planting pit size and construction, tree guards; (g) Details of all soft landscaping including species and contribution to enhance biodiversity; (h) Seating; (i) Paving materials; (j) Maintenance plans for all proposed landscaping; (k) Planters; (m) Contribution to biodiversity enhancement of all landscaping including greening, green walls and green roof; of planning permission 21/00755/FULMAJ dated 07.02.2022.
Timeline
Dates from the published record
-
17 Jan 2023
Received by City of London
-
10 Feb 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 10 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Demolition Method Statement for 14-21 Holborn Viaduct and lift plans pursuant to condition 58 (Part 6 and Part 7 (London Underground)) of planning permission 21/00755/FULMAJ (dated 07.02.2022).
Granted Conditions Demolition -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details of the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 8 of planning permission 21/00755/FULMAJ (dated 07.02.2022).
Granted Conditions 7 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of details pursuant to Condition 58 Part 5 (Drawings of basement and piling substructure) of planning permission ref. 21/00755/FULMAJ dated 07 Feb 2022.
Granted Conditions 15 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Scheme of Protective Works (construction phase) pursuant to condition 17 of planning permission 21/00755/FULMAJ (dated 07.02.2022).
Granted Conditions 6 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of utility connection details pursuant to Schedule 3, Paragraph 16.1 of the Section 106 agreement dated 07.02.2022, planning ref. 21/00755/FULMAJ.
Granted 8 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of a Correlation Survey and Pre-Condition Survey of London Underground assets pursuant to condition 58 (Parts 2 and 4 (part)) of planning permission 21/00755/FULMAJ dated 07.02.2022.
Granted Conditions 8 docs