Planning application
24 And 25 Holborn Viaduct London EC1A 2BN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of temporary weatherproofing to elevations of the building and associated works.
As published by the council, reference 22/01009/FULL
Application record
- Reference
- 22/01009/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 19 Oct 2022
- Validated
- 24 Nov 2022
- Decided
- 12 Jan 2023
- Ward
- Farringdon Within
- Decision by
- Delegated Decision
- Postcode
- EC1A 2BN
Timeline
Dates from the published record
-
19 Oct 2022
Received by City of London
-
24 Nov 2022
Validated
Checked as complete and ready for consideration.
-
12 Jan 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
2,025 applications on PlanIndex · across 33 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24 And 25 Holborn Viaduct London EC1A 2BN
Installation of temporary weatherproofing to elevations of the building and associated works.
Granted Heritage and listed buildings 11 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street EC1A 2AT
89% historically approved · decision due ~8 Dec
Observations to another local authority (City of London) for 14-21 Holborn Viaduct and 32-33 and 34-35 Farringdon Street, London, EC1A 2AT for: Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 22(p)(further details) and condition 63 (approved drawings) to facilitate amendments to the approved scheme including but not limited to: (i) alterations to ground floor facades on Holborn Viaduct and Farringdon Street to omit digital art screens and incorporate a vitrine to display archaeological artefacts, a historic interpretation plaque and ceramic printed glass artwork; (ii) omission of green wall to north-east corner of Holborn Viaduct facade and replacement with new artwork panel; (iii) alterations to Farringdon Street public realm; and (iv) alterations to the roof plan to omit louvres. (City of London ref. 25/00975/FULMAJ)
Awaiting decision Other 1 doc -
Development Site 14 - 21 Holborn Viaduct London EC1A 2AT
Application under Section 96A of the Town and Country Planning Act 1990 (as amended) for non-material amendments to planning permission 21/00755/FULMAJ (dated 07.02.2022) including: (a) Revised Farringdon Street public realm arrangement, including a reduction in short stay cycle parking spaces and revised planter/bench arrangement; (b) Revised entrance door arrangement on Farringdon Street; (c) Realignment of the Northwest Corner Green Wall; (d) Revised entrance door arrangement on Holborn Viaduct; (e) Facade realignment along Newcastle close to remove stepped set out as approved; (f) Revised location of doors along Newcastle Close to coordinate with street levels; (g) Introduction of shadow box glazing to respond to internal UKPN requirements along Newcastle Close; (h) Amendments to the proposed glazing along Newcastle Close to respond to revised internal layouts; (i) Re-alignment of Level 11 North East corner to provide a smoother transition between facades; (j) Re-alignment of Level 13 North East corner panel realigned to respond to levels below; (k) Amendment to climbers from green walls at upper levels, to respond to maintenance and fire safety requirements; (l) Minor adjustments to the roof plan to accommodate design development on balustrades and fire requirements; (m) Minor adjustments to the eastern boundary to address buildability and party wall access requirements; (n) Revised materiality to the south facade of Farringdon St service yard to improve buildability and minimise maintenance requirements; and (o) Amendment to condition 63 (approved drawings) to incorporate the proposed changes.
Granted Amendments Windows or glazing 39 docs -
14 - 21 Holborn Viaduct London
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 21/00755/FULMAJ dated 07 Feb 2022 to vary the wording of Condition 18 (Drainage) to exclude piling as a form of construction work.
Granted Amendments 4 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
100% historically approved · decision due ~5 May
Submission of details of proposed PV panels and technical specification pursuant to condition 29 of Planning Permission 21/00755/FULMAJ dated 07.02.2022.
Awaiting decision Conditions 4 docs -
14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Submission of Local Procurement monitoring report pursuant to Schedule 3 Paragraph 2.7 of the S106 Agreement dated 07 February 2022 (Planning Application Reference: 21/00755/FULMAJ) as amended by the Deed of Variation dated 14 March 2024 (Planning Application Reference: 21/0755/FULMAJ/DOV
Granted 4 docs
Other full applications applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.