Planning application

Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

Granted City of London 20/00969/TTT Thames Tideway Tunnel

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial discharge of schedule 3 requirements relating to the Landscaping works pursuant to BLABF 14 and balustrade, terracing and listed structure interface details pursuant to BLABF 4 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

As published by the council, reference 20/00969/TTT

Application record

Reference
20/00969/TTT
Type
Thames Tideway Tunnel
Status
Decided
Decision
Approved
Received
8 Dec 2020
Validated
8 Dec 2020
Decided
9 Sep 2021
Ward
Castle Baynard
Decision by
Delegated Decision
Postcode
EC4Y 0DR

Site history

Applications at this address on the City of London register

This site has had 6 applications since 2020: 6 approved, 0 refused.

  • 25/01778/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to detailed design approval for permanent above ground structures (minor change to the Amenity Kiosk) pursuant to BLABF 5 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 20 Feb 2026
  • 22/01085/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to approval of details for raising the lion head piers and the retention of the lion head moorings pursuant to BLABF 11 and BLABF 12 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 16 Jan 2023
  • 21/00366/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

    Partial discharge of schedule 3 requirements relating to the pipe subway pursuant to BLABF 24 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 15 Jun 2021
  • 21/00234/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

    Partial discharge of Schedule 3 requirements relating to details of the construction of the Low Level 1 Interception Chamber including removal of the Listed River wall and Service Subway and associated reinstatement pursuant to BLABF 11, 12, 13 and 24 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 17 Jun 2021
  • 20/00711/TTT Granted

    Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

    Partial discharge of Schedule 3 requirement relating to operational lighting pursuant to BLABF 23 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Decided 5 Aug 2021

Timeline

Dates from the published record

  1. 8 Dec 2020

    Received by City of London

  2. 9 Sep 2021

    Decision issued: Approved

  3. 7 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

151 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

City of London granted permission on 9 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Blackfriars Bridge London EC4

    21/00040/MDC Submitted 19 Jan 2021 0m away

    Submission of details of hours of illumination pursuant to condition 9 and an Environmental Management Strategy pursuant to condition 10 of planning permission 18/00455/FULEIA dated 7th September 2018.

    Granted Conditions 8 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    24/01039/TTT Submitted 30 Sep 2024 0m away

    Partial discharge of Schedule 3 requirement relating to detailed design approval for permanent above ground structures (Detailed design changes to the toilets in the undercroft) pursuant to BLABF 5 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 13 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    24/00782/TTT Submitted 22 Jul 2024 0m away

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs to the river wall at the western end of the site where the kiosk meets the river wall); and partial discharge of schedule 3 requirements relating to the Landscaping works pursuant to BLABF 11, BLABF 12, BLABF 13 and BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 8 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    24/00784/TTT Submitted 22 Jul 2024 0m away

    Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 8 docs
  • Blackfriars Railway Bridge Puddle Dock London

    25/01129/FULL Submitted 19 Aug 2025 0m away

    Retention of one arch closure board light and one warning light for when the Fleet overflow is discharging into the river on the eastern elevation of Blackfriars Rail Bridge.

    Granted Full applications 12 docs
  • Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

    25/01128/TTT Submitted 19 Aug 2025 0m away

    Partial discharge of Schedule 3 requirements relating to site-specific remediation strategy pursuant to BLABF 16 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted 50 docs