Skip to content
PlanIndex Get alerts
Menu

Planning application

99 Nicolson Street Edinburgh EH8 9BY

Awaiting decision City of Edinburgh 26/03204/FUL Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Install air conditioning units to rear of building, (in retrospect).

As published by the council, reference 26/03204/FUL

Application record

Reference
26/03204/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
4 Aug 2026
Validated
11 Aug 2026
Ward
Southside/Newington
Parish
Southside
Decision by
Local Delegated Decision
Postcode
EH8 9BY

Comment by 11 September 2026

The council is taking comments on this application until then. Have your say on City of Edinburgh's portal.

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by City of Edinburgh

  2. 11 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4F2 28 West Nicolson Street Edinburgh EH8 9DD

    26/01380/LBC Submitted 31 Mar 2026 54m away

    89% historically approved · decision due ~4 Jun

    Replacement of three existing timber sash and case windows with new double glazed timber sash and case units on a like-for-like basis.

    Awaiting decision Heritage and listed buildings Windows or glazing 8 docs
  • 80 Nicolson Street Edinburgh EH8 9EW

    25/06531/FUL Submitted 15 Dec 2025 54m away

    To vary condition 1 to Planning approval 15/01730/FUL to allow the use of cooking operations.

    Refused Full applications 12 docs
  • 117 Nicolson Street Newington Edinburgh EH8 9ER

    26/0090/TCO Submitted 13 Feb 2026 63m away

    94% historically approved · decision due ~10 Apr

    T1 and T4 birch, T2, T3 sorbus prune by 1m nsew and reduce height by 1m.

    Awaiting decision Trees 4 docs
  • 4F1 28 West Nicolson Street Edinburgh EH8 9DD

    26/03191/LBC Submitted 4 Aug 2026 64m away

    89% historically approved · decision due ~9 Oct

    Replace existing single glazed timber windows with double glazed timber windows all to match existing.

    Awaiting decision Heritage and listed buildings Windows or glazing 15 docs
  • 1F2 28 West Nicolson Street Newington Edinburgh EH8 9DD

    25/04881/CLESTL Submitted 15 Sep 2025 70m away

    77% historically approved · decision due ~10 Nov

    Short term let.

    Awaiting decision Lawful development 4 docs
  • 126 Nicolson Street Newington Edinburgh EH8 9EH

    26/00105/LBC Submitted 12 Jan 2026 72m away

    New underground low pressure gas service connection from existing Nicolson Street main. Service enters at low level and terminates internally. No external pipework; no change to listed building exterior.

    Decided Heritage and listed buildings 5 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications