Skip to content
PlanIndex Get alerts
Menu

Planning application

30 Regent Street Edinburgh EH15 2AX

Awaiting decision City of Edinburgh 26/02098/LBC Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

New sash and case double glazed timber windows to match existing.

As published by the council, reference 26/02098/LBC

Application record

Reference
26/02098/LBC
Type
Listed Building Consent
Status
Awaiting Assessment
Received
15 May 2026
Validated
15 May 2026
Ward
Portobello/Craigmillar
Parish
Portobello (Inactive)
Decision by
Delegated Decision
Postcode
EH15 2AX

Timeline

Dates from the published record

  1. 15 May 2026

    Received by City of Edinburgh

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 10 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 32 Regent Street Portobello East Edinburgh EH15 2AX

    26/0137/TCO Submitted 2 Mar 2026 24m away

    94% historically approved · decision due ~27 Apr

    Contorted willow reduce and shape by 10-12" approximately.

    Awaiting decision Trees 2 docs
  • 15A - 15B Bath Street Lane Edinburgh

    20/01069/FUL Submitted 4 Mar 2020 76m away

    The application is for temporary (3 years) permission for a building site type modular unit that will be used as an office and workshop and will be positioned adjacent to the existing Bike Shop showroom within our enclosed yard.

    Granted Full applications 9 docs
  • 50 Regent Street Edinburgh EH15 2AX

    21/05725/LBC Submitted 27 Oct 2021 93m away

    Single-storey extension to rear replacing existing lean-to kitchen, removals including existing outshot roof, NE wall and NW boundary/gable wall.

    Refused Heritage and listed buildings Extension 16 docs
    Small domestic
  • 35 Bath Street Edinburgh EH15 1HB

    25/05795/LBC Submitted 4 Nov 2025 104m away

    89% historically approved · decision due ~6 Jan

    Various changes to the property including relocation of kitchen to a bedroom, opening up between front and rear rooms, new en-suite, alteration to fire place, new windows to the rear, external doors painted, new shed, bike shed and summer house.

    Awaiting decision Heritage and listed buildings Windows or glazing 23 docs
    Small domestic
  • 1F1 220 Portobello High Street Edinburgh EH15 2AU

    25/05625/LBC Submitted 22 Oct 2025 111m away

    89% historically approved · decision due ~17 Dec

    Existing double glazed timber sash and case windows with modern moulding profile to be replaced with new double glazed timber sash and case windows to match with similar properties within the area.

    Awaiting decision Heritage and listed buildings Windows or glazing 5 docs
  • 3F2 2 Bath Street Portobello West Edinburgh EH15 1EY

    26/00540/LBC Submitted 12 Feb 2026 127m away

    Existing single glazed timber sash and case windows replaced with new double glazed timber sash and case windows to match existing.

    Granted Heritage and listed buildings Windows or glazing 8 docs

In City of Edinburgh

  • 26/03530/LBC Awaiting decision

    3F 87 Constitution Street Edinburgh EH6 7AE

    Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Careful attention will be given when manufacturing new like for like sashes. All window moulds, dimensions and features of the original sashes will be retained and replicated on the new sashes.

    1 Sep 2026 Heritage and listed buildings
  • 26/03514/LBC Awaiting decision

    8A Warrender Park Crescent Edinburgh EH9 1DX

    Formation of one new window opening in the rear elevation of the kitchen, comprising a white-painted double-glazed timber sash-and-case window with natural sandstone lintel, rybats and cill to match the existing stonework.

    31 Aug 2026 Heritage and listed buildings
  • 26/03529/LBC Awaiting decision

    1 Eyre Crescent Edinburgh EH3 5ET

    Existing timber sash and case windows to be removed and replaced with new timber double glazed sash and case windows, all proportions to remain the same to match the existing.

    31 Aug 2026 Heritage and listed buildings
  • 26/03508/LBC Awaiting decision

    2F 45 Bread Street Edinburgh EH3 9AH

    Strip wallpaper; replaster and repaint internal walls and ceilings; repaint/replace internal doors and door handles; replace carpet with new carpet/laminate; install ceiling rose in living room; replace flat front door lock; replace wall sockets, light switches, and light fixtures; strip and repaint the existing internal window shutters.

    31 Aug 2026 Heritage and listed buildings
  • 26/03500/LBC Awaiting decision

    6 St Margaret's Road Edinburgh EH9 1AZ

    Formation of en-suite shower room and fitted wardrobe within bedroom of ground floor flat. En-suite and wardrobe taken part height only, allowing cornice to remain unaltered. Fit black cast iron extract termination grille at low level on external wall.

    28 Aug 2026 Heritage and listed buildings