Skip to content
PlanIndex Get alerts
Menu

Planning application

Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

Awaiting decision City of Edinburgh 25/04297/PNE Prior Notification Edinburgh Airport

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

We require to relocate and consolidate our two immigration halls into one hall on the Ground floor of the North Terminal building.

As published by the council, reference 25/04297/PNE

Application record

Reference
25/04297/PNE
Type
Prior Notification Edinburgh Airport
Status
Awaiting decision
Received
20 Aug 2025
Validated
20 Aug 2025
Ward
Almond
Parish
Ratho + District
Decision by
Delegated Decision
Postcode
EH12 9DN

Site history

Applications at this address on the City of Edinburgh register

This site has had 7 applications since 2012: 4 approved, 0 refused.

  • 26/03276/PNE Awaiting decision

    Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

    Provide an operational 1,200m2 airside hard standing compound to support aircraft catering activities and improve the efficiency, resilience and security of catering operations serving Edinburgh Airport. Improve the security of aircraft catering operations by locating meal storage facilities within the airside environment. Improve the operational efficiency of Gate Gourmet's operation through reduced vehicle movements on both Edinburgh Airport and public road networks. Reduce the risk of aircraft catering delivery delays, supporting on-time aircraft departures. Support the continued growth of airline operations at Edinburgh Airport.

    Submitted 3 Aug 2026 Prior approval
  • 25/04503/PNE Granted

    Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

    To extend the BHS (Baggage Handling System).

    Decided 12 Sep 2025 Prior approval
  • 21/05343/ADV Granted

    Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

    Proposed Illuminated Mesh Banner and 2x vinyl advertisements

    Decided 15 Dec 2021 Advertising
  • 15/00664/ADV Granted

    Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

    Vinyl wrap advert to existing link bridge.

    Decided 13 Apr 2015 Advertising
  • 13/01094/FUL Withdrawn

    Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

    To replace 6no existing Integral chillers with the Boots store at Edinburgh Airport with 6no remote chillers - these will require 2 condensing units to be sited on the roof of the terminal & associated M&E.

    Decided 22 Apr 2013 Full applications
  • 12/04426/ADV Granted

    Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

    Erect illuminated sign on side of airport building.

    Decided 7 Jan 2013 Advertising

Timeline

Dates from the published record

  1. 20 Aug 2025

    Received by City of Edinburgh

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of Edinburgh for determination, against a statutory target of eight weeks. Over the last year City of Edinburgh decided prior approval applications in a median of 24 days. More in our guide to how long planning decisions take.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

In City of Edinburgh

  • 26/03429/WINPA Granted

    28 Mayfield Gardens Edinburgh EH9 2BZ

    Replacement of timber sash and case style window for new PVCu double glazed sliding sash window.

    21 Aug 2026 Prior approval
  • 26/03468/WINPA Awaiting decision

    2F1 59 Morningside Road Edinburgh EH10 4AZ

    The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.

    26 Aug 2026 Prior approval
  • 26/03426/WINPA Granted

    1F2 110 Comiston Road Edinburgh EH10 5QL

    I bought Flat 4 110 Comiston Road on 10th July 2026 and I am notifying you and ask for prior approval that I will reinstate the original wooden sash window design throughout the property and replace the current UPVC windows at the property. The current windows open fully (swing) and are not the original opening method as should be in sash windows. I have a quote from "Edinburgh Sash and Case Company", and have already paid for the initial work of making the windows from scratch. The windows are due to be installed with great care and attention to detail in the middle of September 2026.

    21 Aug 2026 Prior approval
  • 26/03427/WINPA Awaiting decision

    24 Blackford Avenue Edinburgh EH9 2PH

    Replacement of aluminium sliding sash and case style windows for new pVCU double glazed sliding sash windows.

    21 Aug 2026 Prior approval
  • 26/03380/PNTEL Awaiting decision

    Leith St Andrews Hall 410 Easter Road Edinburgh EH6 8HT

    Proposed shared telecommunications base station comprising the installation of 8no. antennas within bell tower on support poles mounted to new grillage flooring over existing steel beams; installation of 12no. ERS mounted internally to bell tower wall and 24no. ERS on antenna support poles; replacement of existing louvres with Glass Reinforced Plastic Louvres; replacement of timber staircase on third floor of bell tower with access ladder; removal of church bells and timber frame; Installation of 2no. equipment cabinets and 1no. meter cabinet at ground level; and associated landscaping and ancillary development.

    19 Aug 2026 Prior approval