Skip to content
PlanIndex Get alerts
Menu

Planning application

46 Spylaw Street Edinburgh EH13 0JT

Awaiting decision City of Edinburgh 26/03795/WINPA Prior Approval Windows

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

We wish to install new double glazed upvc windows to replace our old wooden sash and case windows, which are rotten. The replacement windows are pvc sash windows (heritage range) with wood effect finish. the opening mechanism is the same. All othe rdetails will match the old windows including number, orientation and colour of panes and all the dimensions, colour of frame and astragalsbars.

As published by the council, reference 26/03795/WINPA

Application record

Reference
26/03795/WINPA
Type
Prior Approval Windows
Status
Awaiting Assessment
Received
18 Sep 2026
Validated
23 Sep 2026
Ward
Colinton/Fairmilehead
Parish
Colinton
Decision by
Delegated Decision
Postcode
EH13 0JT

Timeline

Dates from the published record

  1. 18 Sep 2026

    Received by City of Edinburgh

  2. 23 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 18 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 43 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of Edinburgh for determination, against a statutory target of eight weeks. Over the last year City of Edinburgh decided prior approval applications in a median of 24 days. More in our guide to how long planning decisions take.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 46 Spylaw Street Colinton Edinburgh EH13 0JT

    26/0180/TCO Submitted 17 Mar 2026 50 yards away

    1 silverbirch and 1 cherry tree removal of trees and vegetation to allow repairs to Spylaw river wall.

    Granted Trees 7 docs
  • 36A Spylaw Street Edinburgh EH13 0JT

    20/00866/FUL Submitted 20 Feb 2020 50 yards away

    Proposed installation of 8 solar panels to the front elevation of the buildings roof facing into Spylaw Street. (AMENDED).

    Granted Full applications 9 docs
  • 36A Spylaw Street Edinburgh EH13 0JT

    20/00866/VARY Submitted 12 May 2020 50 yards away

    Non-Material Variation to Planning Consent 20/00866/FUL.

    Decided Conditions 3 docs
  • 35A Spylaw Street Edinburgh EH13 0JT

    19/05105/LBC Submitted 25 Oct 2019 50 yards away

    Remove partitions (understood to be non-original), erect new partitions, form new door openings creating new family bathroom; remove existing bathroom; enlarge kitchen. Door opening closed to form a press, 1 fireplace opened up. External alterations-replace timber casement windows with timber sash +case windows blocking up 2 existing window/door openings, new sliding glazed doors.

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • 51 Spylaw Street Colinton Edinburgh EH13 0JS

    25/05757/LBC Submitted 30 Oct 2025 50 yards away

    Remove grate within existing fireplace and install wood burning stove.

    Granted Heritage and listed buildings 8 docs
  • 10 - 14 Spylaw Bank Road Edinburgh EH13 0JP

    26/0457/TCO Submitted 15 Jun 2026 100 yards away

    99% historically approved · decision due ~14 Aug

    Ash reduction as this is impacting garden and house due to size and proximity - Reduce height by 2 metres and spread by 2 metres.

    Awaiting decision Trees 3 docs

In City of Edinburgh

  • 26/04019/PNE Awaiting decision

    Main Terminal 1 Edinburgh Airport Jubilee Road Edinburgh EH12 9DN

    To extend the existing Aircraft Fuel Farm to the west of the current Terminal Building (Fuel Farm Phase 2)

    Received 5 Oct, published by the council 9 Oct 2026 Prior approval
  • 26/03902/WINPA Awaiting decision

    2F1 6 Bellevue Place Broughton Edinburgh EH7 4BZ

    The living room of 6/4 Bellevue Place faces the road. This proposal is to replace the single-glazed, wooden sash-and-case bay window (3 sashes comprise the bay window) with a like-for-like sash UPVC bay window (double-glazed). The motivation for the change is lower up-front cost, increased energy efficiency and decreased maintenance effort.

    Received 28 Sep, published by the council 6 Oct 2026 Prior approval
  • 26/03887/PNA Awaiting decision

    Land 2200 Metres South Of Bavelaw Mill Farm Wester Rigg Balerno

    Prior Approval for portion of Site 2 at Bavelaw for peatland restoration.

    Received 28 Sep, published by the council 6 Oct 2026 Prior approval
  • 26/03852/WINPA Awaiting decision

    106 Comiston Road Morningside Edinburgh EH10 5QL

    Replace five ground floor flat windows with double glazed upvc sash and case windows. to insulate the property and reduce traffic noise from comiston road. employing a reputable local glazer (amazing double glazing) the proposed upvc windows will comply with planning guidance in terms of number, orientation, colour and geometry, only deviating in terms of materiality due to prohibitively expensive quotes for timber frame. the majority of neighbouring flats have installed upvc double-glazing.

    Received 24 Sep, published by the council 30 Sep 2026 Prior approval
  • 26/03773/PNTEL Awaiting decision

    Telecoms Apparatus 113 Metres West Of 113 Woodhall Road Colinton Edinburgh

    Proposed installation of 3m high top section, proposed removal of 2 No. antennas, proposed installation of 6 No. antennas, proposed removal of 15 No. ERSs, proposed installation of 12 No. ERSs, and ancillary development thereto.

    Received 16 Sep, published by the council 25 Sep 2026 Prior approval