Planning application
Land West Of Drift Lane Chidham West Sussex
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of conditions 8,11 and 13 to planning permission 20/03321/OUTEIA.
As published by the council, reference 26/01006/DOC
Application record
- Reference
- 26/01006/DOC
- Type
- Discharge of Conditions
- Status
- Pending Consideration
- Received
- 5 May 2026
- Validated
- 5 May 2026
- Ward
- Harbour Villages
- Parish
- Chidham & Hambrook
- Decision by
- Delegated
Site history
Applications at this address on the Chichester register
This site has had 2 applications since 2026: 0 approved, 1 refused.
-
26/01634/NMA Refused
Land West Of Drift Lane Chidham West Sussex
Non-material amendment from reserve matters application CH/24/02600/REM - Series of minor design refinements across the approved development, revisions to the lighting strategy to incorporate solar-powered lighting units, updated landscape planting, surface finish drawings, a revised phasing plan and a solar roof plan identifying the potential locations of photovoltaic panels.
Timeline
Dates from the published record
-
5 May 2026
Received by Chichester
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Chichester took a median of 58 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 20/03321/OUTEIA (Refuse)
Documents
Plans, drawings, consultee responses and the officer's report
153 documents on file for this application
- EMAIL FROM APPLICANT 21/7/26 - ENGINEERS FEEDBACK
- DRIFT LANE PLANNING DOCUMENT SCHEDULE
- EMAIL FROM APPLICANT 17/7/26 - QUERY RESPONSES
- TOPOGRAPHIC SURVEY
- LEVELS & CONTOURS OVERALL SITE
- LEVELS & CONTOURS SHEET 1 OF 7
- LEVELS & CONTOURS SHEET 2 OF 7
- LEVELS & CONTOURS SHEET 3 OF 7
- LEVELS & CONTOURS SHEET 4 OF 7
- LEVELS & CONTOURS SHEET 5 OF 7
- LEVELS & CONTOURS SHEET 6 OF 7
- LEVELS & CONTOURS SHEET 7 OF 7
- PRIVATE DRAINAGE DETAILS-SHT2 07.07.26
- PRIVATE DRAINAGE DETAILS-SHT3 07.07.26
- WSCC LEAD LOCAL FLOOD AUTHORITY
- DRAINAGE SIMULATION RESULTS
- DRAINAGE SIMULATION RESULTS 2
- DRAINAGE SIMULATION RESULTS 3
- DRAINAGE SIMULATION RESULTS 4
- DRAINAGE SIMULATION RESULTS 5
- DRAINAGE SIMULATION RESULTS 6
- MAIN NETWORK (POND) DRAINAGE SIMULATION RESULTS
- PRIVATE DRAINAGE DETAILS SHEET 1
- PRIVATE DRAINAGE DETAILS SHEET 2
- PRIVATE DRAINAGE DETAILS SHEET 3
- BASIN CROSS SECTIONS & SUDS FEATURES BASIN 1
- BASIN CROSS SECTIONS & SUDS FEATURES BASIN 2
- CORRESPONDENCE WITH THE AGENT 02/07/2026
- MH SCHEDULE (PRIMARY SPIRES)
- VERTICAL ALIGNMENT SHEET 1 OF 7
- VERTICAL ALIGNMENT SHEET 2 OF 7
- VERTICAL ALIGNMENT SHEET 3 OF 7
- VERTICAL ALIGNMENT SHEET 4 OF 7
- VERTICAL ALIGNMENT SHEET 5 OF 7
- VERTICAL ALIGNMENT SHEET 6 OF 7
- VERTICAL ALIGNMENT SHEET 7 OF 7
- S278 OWC PLAN SHEET 1 OF 3
- S278 OWC PLAN SHEET 2 OF 3
- S278 OWC PLAN SHEET 3 OF 3
- S278 OWC EXISTING LONG SECTIONS SHEET 1 OF 2
- S278 OWC EXISTING LONG SECTIONS SHEET 2 OF 2
- OWC ONSITE WORKS SHEET 6 OF 6
- OWC ONSITE WORKS SHEET 5 OF 6
- OWC ONSITE WORKS SHEET 4 OF 6
- OWC ONSITE WORKS SHEET 3 OF 6
- OWC ONSITE WORKS SHEET 2 OF 6
- OWC ONSITE WORKS SHEET 1 OF 6
- PROPOSED DRAINAGE OVERALL SITE
- PROPOSED DRAINAGE SHEET 1 OF 7
- PROPOSED DRAINAGE SHEET 2 OF 7
- PROPOSED DRAINAGE SHEET 3 OF 7
- PROPOSED DRAINAGE SHEET 4 OF 7
- PROPOSED DRAINAGE SHEET 5 OF 7
- PROPOSED DRAINAGE SHEET 6 OF 7
- PROPOSED DRAINAGE SHEET 7 OF 7
- LEVELS & CONTOURS OVERALL SITE
- LEVELS & CONTOURS SHEET 1 OF 7
- LEVELS & CONTOURS SHEET 2 OF 7
- LEVELS & CONTOURS SHEET 3 OF 7
- LEVELS & CONTOURS SHEET 4 OF 7
- LEVELS & CONTOURS SHEET 5 OF 7
- LEVELS & CONTOURS SHEET 6 OF 7
- LEVELS & CONTOURS SHEET 7 OF 7
- DRIFT LANE PLANNING DOCUMENT SCHEDULE
- LEVELS & CONTOURS OVERALL SITE
- LEVELS & CONTOURS SHEET 1 OF 7
- LEVELS & CONTOURS SHEET 2 OF 7
- LEVELS & CONTOURS SHEET 3 OF 7
- LEVELS & CONTOURS SHEET 4 OF 7
- LEVELS & CONTOURS SHEET 5 OF 7
- LEVELS & CONTOURS SHEET 6 OF 7
- LEVELS & CONTOURS SHEET 7 OF 7
- DRAINAGE STRATEGY DESIGN STATEMENT
- MANAGEMENT & MAINTENANCE
- S278 OWC PLAN SHEET 1 OF 3
- S278 OWC PLAN SHEET 2 OF 3
- S278 OWC PLAN SHEET 3 OF 3
- OWC ONSITE WORKS SHEET 1 OF 6
- OWC ONSITE WORKS SHEET 2 OF 6
- OWC ONSITE WORKS SHEET 3 OF 6
- OWC ONSITE WORKS SHEET 4 OF 6
- OWC ONSITE WORKS SHEET 5 OF 6
- OWC ONSITE WORKS SHEET 6 OF 6
- DRAINAGE CATCHMENT PLAN SHEET 2 OF 7
- DRAINAGE CATCHMENT PLAN SHEET 4 OF 7
- PROPOSED OVERALL DRAINAGE SITE
- PROPOSED DRAINAGE SHEET 1 OF 7
- PROPOSED DRAINAGE SHEET 2 OF 7
- PROPOSED DRAINAGE SHEET 3 OF 7
- PROPOSED DRAINAGE SHEET 4 OF 7
- PROPOSED DRAINAGE SHEET 5 OF 7
- PROPOSED DRAINAGE SHEET 6 OF 7
- PROPOSED DRAINAGE SHEET 7 OF 7
- MAINTENANCE PLAN OVERALL SITE
- SURFACE FINISHES OVERALL SITE
- SURFACE FINISHES SHEET 1 OF 7
- SURFACE FINISHES SHEET 2 OF 7
- SURFACE FINISHES SHEET 3 OF 7
- SURFACE FINISHES SHEET 4 OF 7
- SURFACE FINISHES SHEET 5 OF 7
- SURFACE FINISHES SHEET 6 OF 7
- SURFACE FINISHES SHEET 7 OF 7
- LEAD LOCAL FLOOD AUTHORITY COMMENTS
- HABITATS REGULATION ASSESSMENT ? SCREENING MATRIX
- LEVELS & CONTOURS SHEET 4 OF 7
- LEVELS & CONTOURS SHEET 5 OF 7
- LEVELS & CONTOURS SHEET 6 OF 7
- LEVELS & CONTOURS SHEET 7 OF 7
- PROPOSED DRAINAGE OVERALL SITE
- PROPOSED DRAINAGE SHEET 1 OF 7
- HIGH LEVEL TOPOGRAPHIC SURVEY WITH CONTOURS
- PROPOSED DRAINAGE SHEET 2 OF 7
- PROPOSED DRAINAGE SHEET 3 OF 7
- PROPOSED DRAINAGE SHEET 4 OF 7
- PROPOSED DRAINAGE SHEET 5 OF 7
- PROPOSED DRAINAGE SHEET 6 OF 7
- PROPOSED DRAINAGE SHEET 7 OF 7
- LEVELS & CONTOURS OVERALL SITE
- LEVELS & CONTOURS SHEET 1 OF 7
- LEVELS & CONTOURS SHEET 2 OF 7
- LEVELS & CONTOURS SHEET 3 OF 7
- *DUPLICATE* LEVELS & CONTOURS SHEET 4 OF 7
- *DUPLICATE* LEVELS & CONTOURS SHEET 5 OF 7
- *DUPLICATE* LEVELS & CONTOURS SHEET 6 OF 7
- *DUPLICATE* LEVELS & CONTOURS SHEET 7 OF 7
- DRAINAGE CATCHMENT PLAN OVERAL
- DRAINAGE CATCHMENT PLAN SHEET 1 OF 7
- DRAINAGE CATCHMENT PLAN SHEET 2 OF 7
- DRAINAGE CATCHMENT PLAN SHEET 3 OF 7
- DRAINAGE CATCHMENT PLAN SHEET 4 OF 7
- DRAINAGE CATCHMENT PLAN SHEET 5 OF 7
- DRAINAGE CATCHMENT PLAN SHEET 6 OF 7
- DRAINAGE CATCHMENT PLAN SHEET 76 OF 7
- VERTICAL ALIGNMENT SHEET 1 OF 7
- VERTICAL ALIGNMENT SHEET 2 OF 7
- VERTICAL ALIGNMENT SHEET 3 OF 7
- VERTICAL ALIGNMENT SHEET 4 OF 7
- VERTICAL ALIGNMENT SHEET 5 OF 7
- VERTICAL ALIGNMENT SHEET 6 OF 7
- VERTICAL ALIGNMENT SHEET 7 OF 7
- APPLICATION FORM
- DISCHARGE OF CONDITIONS 8
- DISCHARGE OF CONDIDTIONS 11
- WSCC LEAD LOCAL FLOOD AUTHORITY - LAND DRAINAGE WORKS
- MAINTANANCE PLAN OVERAL SITE
- DRAINAGE SIMULATION RESULTS
- FLOOD RISK ASSESSMENT
- FLOOD RISK ASSESSMENT
- FLOOD RISK ASSESSMENT
- FLOOD RISK ASSESSMENT
- FLOOD RISK ASSESSMENT
- DRAINAGE SIMULATION RESULTS
- DISCHARGE OF CONDIDTIONS 11
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Chichester for determination, against a statutory target of eight weeks. Over the last year Chichester decided condition discharge and variation applications in a median of 54 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land West Of Drift Lane Chidham West Sussex
Discharge of conditions 8,11 and 13 to planning permission 20/03321/OUTEIA.
Granted Conditions 153 docs -
Land West Of Drift Lane Chidham West Sussex
Non-material amendment from reserve matters application CH/24/02600/REM - Series of minor design refinements across the approved development, revisions to the lighting strategy to incorporate solar-powered lighting units, updated landscape planting, surface finish drawings, a revised phasing plan and a solar roof plan identifying the potential locations of photovoltaic panels.
Refused Amendments 54 docs -
Orchard Farm Drift Lane Bosham Chichester West Sussex PO18 8PP
Discharge of condition 2 (Material Schedule) of permission 25/01356/REM.
Granted Conditions 2 docs -
Orchard Farm Drift Lane Bosham Chichester West Sussex PO18 8PP
Discharge of condition 2 (Material Schedule) of permission 25/01356/REM.
Granted Conditions 2 docs -
Caravan And Camping Site Orchard Farm Drift Lane Bosham Chichester West Sussex PO18 8PP
Discharge of Conditions 5 (Finished floor levels), 6 (Contamination - Phase 1 Report), 7 (Contamination - Phase 2 Report), Condition 8 (Contamination - Remediation Strategy), 10 (CEMP), 11 (Surface water drainage), 12 (Foul drainage), 16 (Cycle storage), 17 (Vehicular access) and 18 (Parking & turning) of Planning Permission CH/21/02303/OUT (Appeal reference: APP/L3815/W/23/3316616).
Granted Conditions 28 docs -
Caravan And Camping Site Orchard Farm Drift Lane Bosham Chichester West Sussex PO18 8PP
Discharge of Conditions 5 (Finished floor levels), 6 (Contamination - Phase 1 Report), 7 (Contamination - Phase 2 Report), Condition 8 (Contamination - Remediation Strategy), 10 (CEMP), 11 (Surface water drainage), 12 (Foul drainage), 16 (Cycle storage), 17 (Vehicular access) and 18 (Parking & turning) of Planning Permission CH/21/02303/OUT (Appeal reference: APP/L3815/W/23/3316616).
Granted Conditions 28 docs
Other condition discharge and variation applications
In Chichester
-
26/01358/DOC Granted
Phase 8, Chapel Green Blomfield Drive Graylingwell Park Chichester PO19 6BZ
Discharge of Condition 5 (schedule of materials) from reserved matters approval CC/22/02807/REM.
-
26/01273/DOC Granted
Earnley Concourse Clappers Lane Earnley Chichester West Sussex PO20 7JN
Discharge of Condition 4 (Hard and Soft Landscaping Details) of Reserved Matters approval E/24/01775/REM.
-
26/01672/DOC Granted
Land South Of Racton View Marlpit Lane Hambrook Westbourne Emsworth West Sussex PO10 8EQ
Discharge of conditions 5 (contaminated land phase 1 report), 6 (contaminated land phase 2 report), 7 (contaminated land remediation), 9 (package treatment plant maintenance and management), 12 (boundary treatments), 13 (hard and soft landscaping works) and 17 (external illumination) from planning permission WE/24/00806/FUL.
-
26/01827/DOC Refused
Baker Barracks Emsworth Road Thorney Island Emsworth West Sussex PO10 8DH
This discharge of condition 8 (surface water drainage) from planning application 26/00503/FUL
-
26/02106/DOC Granted
The Coach House Pigbush Lane Loxwood Billingshurst West Sussex RH14 0QY
Discharge of Condition 3 (material schedule) from Planning Permission LX/26/00387/DOM.