Skip to content
PlanIndex Get alerts
Menu

Planning application

Land West Of Drift Lane Chidham West Sussex

Awaiting decision Chichester 26/01634/NMA Non-material Amendments

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Non-material amendment from reserve matters application CH/24/02600/REM - Series of minor design refinements across the approved development, revisions to the lighting strategy to incorporate solar-powered lighting units, updated landscape planting, surface finish drawings, a revised phasing plan and a solar roof plan identifying the potential locations of photovoltaic panels.

As published by the council, reference 26/01634/NMA

Application record

Reference
26/01634/NMA
Type
Non-material Amendments
Status
Pending Consideration
Received
22 Jul 2026
Validated
3 Aug 2026
Ward
Harbour Villages
Parish
Chidham & Hambrook
Decision by
Delegated

Timeline

Dates from the published record

  1. 22 Jul 2026

    Received by Chichester

  2. 3 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Chichester took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

50 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Chichester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • Land West Of Drift Lane Chidham West Sussex

    26/01634/NMA Submitted 22 Jul 2026 0m away

    88% historically approved · decision due ~28 Sep

    Non-material amendment from reserve matters application CH/24/02600/REM - Series of minor design refinements across the approved development, revisions to the lighting strategy to incorporate solar-powered lighting units, updated landscape planting, surface finish drawings, a revised phasing plan and a solar roof plan identifying the potential locations of photovoltaic panels.

    Awaiting decision Amendments 50 docs
  • Land West Of Drift Lane Chidham West Sussex

    26/01006/DOC Submitted 5 May 2026 16m away

    92% historically approved · decision due ~30 Jun

    Discharge of conditions 8,11 and 13 to planning permission 20/03321/OUTEIA.

    Awaiting decision Conditions 52 docs
  • Land West Of Drift Lane Chidham West Sussex

    26/01006/DOC Submitted 5 May 2026 16m away

    92% historically approved · decision due ~30 Jun

    Discharge of conditions 8,11 and 13 to planning permission 20/03321/OUTEIA.

    Awaiting decision Conditions 52 docs
  • Orchard Farm Drift Lane Bosham Chichester West Sussex PO18 8PP

    25/02898/DOC Submitted 2 Dec 2025 104m away

    Discharge of condition 2 (Material Schedule) of permission 25/01356/REM.

    Granted Conditions 3 docs
  • Orchard Farm Drift Lane Bosham Chichester West Sussex PO18 8PP

    25/02898/DOC Submitted 2 Dec 2025 104m away

    Discharge of condition 2 (Material Schedule) of permission 25/01356/REM.

    Granted Conditions 3 docs
  • Caravan And Camping Site Orchard Farm Drift Lane Bosham Chichester West Sussex PO18 8PP

    25/02857/DOC Submitted 26 Nov 2025 166m away

    92% historically approved · decision due ~2 Feb

    Discharge of Conditions 5 (Finished floor levels), 6 (Contamination - Phase 1 Report), 7 (Contamination - Phase 2 Report), Condition 8 (Contamination - Remediation Strategy), 10 (CEMP), 11 (Surface water drainage), 12 (Foul drainage), 16 (Cycle storage), 17 (Vehicular access) and 18 (Parking & turning) of Planning Permission CH/21/02303/OUT (Appeal reference: APP/L3815/W/23/3316616).

    Awaiting decision Conditions 21 docs

In Chichester

  • 26/01746/NMA Awaiting decision

    27 Kent Road Chichester West Sussex PO19 7NH

    Non material amendment to CC/26/02653/DOM to change in width of bifold doors on south elevation.

    6 Aug 2026 Amendments
  • 26/01698/NMA Awaiting decision

    Field North West Of The Saltings Crooked Lane Birdham West Sussex

    Non material amendment to planning permission BI/16/01809/FUL - Amendment to chimney location and addition of photovoltaic panels.

    30 Jul 2026 Amendments
  • 26/01560/NMA Awaiting decision

    Land Within The Westhampnett / North East Chichester Strategic Development Location (north Of Madgwick Lane) Chichester

    Non material amendment to WH/23/02711/REM for changes to housetypes.

    13 Jul 2026 Amendments
  • 26/01248/NMA Awaiting decision

    Baker Barracks Emsworth Road Thorney Island Emsworth West Sussex PO10 8DH

    Non-material amendment to planning permission WT/23/02785/FULEIA - to amend the wording of Condition 6 to reference the updated drainage layout for Site 3 and minor amendments to the approved layout, fenestration and internal arrangements at Site 3, and amendments to the wording of Condition 8 to include the updated Tree Protection Plans (TPPs) for Site 2 and Site 3.

    8 Jun 2026 Amendments
  • 26/00932/NMA Granted

    1 Elm Terrace Green Lane Bosham Chichester West Sussex PO18 8NU

    Non-material amendments to householder planning permission BO/25/02139/DOM - Fenestration alterations, change of cladding direction from vertical to horizontal and change of finishing material of upper gable on north elevation from render to cladding to match other gables.

    24 Apr 2026 Amendments