Planning application

Twyn Hywel Energy Park Land North-West Of Caerphilly

Granted Caerphilly 25/0836/COND Condition Discharge

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Discharge condition 11 (Construction Transport Management Plan) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

As published by the council, reference 25/0836/COND

Application record

Reference
25/0836/COND
Type
Condition Discharge
Status
Decided
Decision
Decide Cond Discharge case
Received
25 Nov 2025
Validated
26 Nov 2025
Decided
7 Jan 2026
Ward
Nelson
Decision by
Delegated

Site history

Applications at this address on the Caerphilly register

This site has had 21 applications since 2025: 13 approved, 0 refused.

  • 26/0561/NMA Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Seek approval of a non material amendment to planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor) to vary the wording of condition 37 (PROW) to include the below wording: Following the application of the micro-siting protocol (condition 39), if the location of turbine 7 (as shown on ES Figure 4.1a: Infrastructure Layout) would mean that the blades of turbine 7 oversail the public right of way (GELI/BWY117E/1) then no blades can be erected on turbine 7 until the public right of way has been diverted to ensure the blades do not oversail

    Submitted 20 Aug 2026 Amendments
  • 26/0524/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 06 (CEMP) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 30 Jul 2026 Conditions
  • 26/0395/COND Granted

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 26 (SI stability) of planning consent 25/0342/NCC(Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 31 Jul 2026 Conditions
  • 26/0279/COND Granted

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 22 (Borrow pits) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 29 Jun 2026 Conditions
  • 26/0107/COND Granted

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 25 (Hydrogeological) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 17 Apr 2026 Conditions
  • 26/0062/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 28 (TV interference) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 26 Jan 2026 Conditions
  • 26/0041/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge conditions 14 (Condition Highway Survey) and 15 (Highway damage remediation scheme) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 15 Jan 2026 Conditions
  • 26/0018/COND Granted

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 39 (Micrositing) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 22 Apr 2026 Conditions
  • 25/0870/COND Granted

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 38 (Arb Assessment) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 17 Apr 2026 Conditions
  • 25/0871/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 38 (Arb Assessment) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)

    Submitted 10 Dec 2025 Conditions

Timeline

Dates from the published record

  1. 25 Nov 2025

    Received by Caerphilly

  2. 26 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Jan 2026

    Decision issued: Decide Cond Discharge case

  4. 28 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Savills (UK) Ltd Agent, registered in London

Active · incorporated 1991 · London

929 applications on PlanIndex · across 135 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Twyn Hywel Energy Park Ltd Applicant, registered in Cardiff

Active · incorporated 2020 · Cardiff

38 applications on PlanIndex · across 2 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • DECISION Decision · 07 Jan 2026
  • DELEGATED REPORT Delegated Report · 07 Jan 2026
  • APPLICATION FORM Application Form · 25 Nov 2025
  • LOCATION PLAN OS Extract · 25 Nov 2025
  • DECISION - 25/0342/NCC Decision · 25 Nov 2025
  • CTMP Report · 25 Nov 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Caerphilly granted permission on 7 January 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Twyn Hywel Energy Park Land North-West Of Caerphilly

    26/0041/COND Submitted 15 Jan 2026 0m away

    100% historically approved · decision due ~12 Mar

    Discharge conditions 14 (Condition Highway Survey) and 15 (Highway damage remediation scheme) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Awaiting decision Conditions 12 docs
  • Twyn Hywel Energy Park Land North-West Of Caerphilly

    26/0279/COND Submitted 15 Apr 2026 0m away

    Discharge condition 22 (Borrow pits) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Granted Conditions 9 docs
  • Twyn Hywel Energy Park Land North-West Of Caerphilly

    26/0018/COND Submitted 9 Jan 2026 0m away

    Discharge condition 39 (Micrositing) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Granted Conditions 16 docs
  • Twyn Hywel Energy Park Land North-West Of Caerphilly

    25/0375/COND Submitted 10 Jun 2025 0m away

    100% historically approved · decision due ~5 Aug

    Discharge condition 39 (micro-siting protocol) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)

    Awaiting decision Conditions 20 docs
  • Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon

    26/0250/COND Submitted 8 Apr 2026 0m away

    Discharge condition 30 of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Granted Conditions 8 docs
  • Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon

    26/0148/COND Submitted 27 Feb 2026 0m away

    Discharge condition 33 (Details of Turbines) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Granted Conditions 11 docs

In Caerphilly

  • 26/0493/COND Granted

    Tredegar Junction Hotel Commercial Street Pontllanfraith Blackwood NP12 2JY

    Discharge condition 04 (Soft Landscaping Scheme) of planning consent 25/0814/FULL (Erect residential development consisting of 36 affordable apartments, landscaping, car parking, drainage and associated works)

    24 Jul 2026 Conditions
  • 26/0604/COND Awaiting decision

    21 Church Street Rhymney Tredegar NP22 5HL

    Discharge condition 6 (Noise - glazing Lmax) of planning consent 25/0577/COU (Change the use to one single dwelling/house)

    9 Sep 2026 Conditions
  • 26/0593/COND Awaiting decision

    Tredegar Junction Hotel Commercial Street Pontllanfraith Blackwood NP12 2JY

    Discharge condition 06 (Site Control) of planning consent 25/0814/FULL (Erect residential development consisting of 36 affordable apartments, landscaping, car parking, drainage and associated works)

    4 Sep 2026 Conditions
  • 26/0306/COND Granted

    Glyngaer Farm Glyngaer Road Glyn-gaer Gelligaer Hengoed CF82 8FJ

    Discharge conditions 04 (Biodiversity strategy), 05 (Tree Protection Plan) and 06 (Landscaping Scheme) of planning consent 25/0720/HH (Erect two storey side extension and expand existing front porch)

    28 Apr 2026 Conditions
  • 26/0575/COND Awaiting decision

    Ascona Retail Ltd - Shell Service Station Newbridge By-pass Crumlin Newport NP11 4QJ

    Discharge conditions 03 (NRW contamination) and 07 (NRW decommissioning) of planning consent 23/0440/FULL (Demolish existing petrol filling station and car sales facilities and replace with new petrol filling station including new underground tanks, canopy, shop, food and drink sales pod, jet wash and associated facilities)

    1 Sep 2026 Conditions